The buildout at a glance
Where our tracked projects stand
Source qualification is being reconciled
128 of 206 tracked projects currently have accepted qualification records; 78 remain pending or held. Each qualified project requires at least four distinct, relevant, accessible documents, including a project-specific government source, primary evidence and independent reporting.
The earlier “200 scoped reviews” count recorded bounded review activity. It did not establish that every project met the full source gate. We are correcting that distinction and reviewing the supporting evidence. Pending projects remain visible as coverage records; they are excluded from qualified-cohort research. Source qualification alone is not full FJI certification: official investor/shareholder and quarterly financial-statement links for confirmed involved public companies are required. 77 projects currently pass both audited gates. Remaining holds and private-disclosure exceptions are explicit in the corporate disclosure ledger.
Project stages
Select a stage to explore its records.
Regional coverage
Coverage reflects our research inventory, not the size or share of the global market.
Stage counts classify project records. “Operating” does not establish verified IT megawatts or full-campus completion. Capacity, spending and revenue are not aggregated until their evidence is comparable. How we measure →
FJ Insights · Research and analysis
What the project data tells investors
Published research and descriptive inventory counts. Full-inventory findings remain subject to the qualification audit below.
Nearly half of our development pipeline is still before construction
48 of 102 tracked development-stage projects are proposed, announced, approved or permitted; 54 are under construction.
Descriptive inventory snapshot · Includes qualification-pending records. Project counts, not capacity or investment totals. Excludes operating classifications and existing facilities with unverified readiness. This is a coverage finding, not a change over time.
Inspect the stage breakdown ↑Three-project comparison · 2026-10-18
AI’s Debt Boom Faces a Delivery Test
Polaris Forge 1’s final-building notes begin interest payments before its 2027 delivery target; reserves and lease-linked principal payments bridge the interval.
Why it matters. Power, customer acceptance and contract terms determine how delivery timing affects financing and payments.
Polaris Forge 1, IREN Childress and Project Jupiter · Sources reviewed October 17, 2026. Selected cases, not a sector estimate or borrower ranking.
Explore the Evidence
Applied Digital Polaris Forge 1 · IREN Childress / Horizon · Project Jupiter
Three-project comparison · 2026-10-16
The Capital Test for AI: Saline, Abilene and El Paso
Saline’s $16 billion financing closed in April; Oracle targets first customer delivery from the second half of 2027.
Why it matters. Financing and customer delivery occur at different points. The terms governing that interval determine who carries the risk.
Saline, Abilene and El Paso · Sources reviewed October 16, 2026. Three cases, not a market-wide trend; financing close does not establish cash deployed.
Two-project comparison · 2026-10-16
AWS and Google: Two Delivery Gates in South America
Huechuraba has an environmental approval upheld by the court. Canelones has dated government-observed construction.
Why it matters. Approval and construction put the projects at different checkpoints before power delivery and operating acceptance.
Chile and Uruguay · Sources reviewed October 16, 2026. Current operating IT load and paid site expenditure remain unverified.
Explore the Evidence
More project findings and source notes
Saline: financing closed; customer delivery remains ahead
Saline Township · public-source review
What the record establishes—and what it does not
Established in the checked source set: the project is under construction; transaction counsel reported the USD 16 billion financing closed April 30, 2026; actual draws and spending remain unverified; MPSC conditionally approved a 1,383 MW maximum utility load and later approved an initial 332 MW storage tranche; Oracle reports construction progress and targets first customer delivery from 2H 2027.
Not established: actual financing drawdowns, permit conditions and compliance from direct primary files, court disposition, phase energization, customer acceptance, current IT load, utilization or project revenue. The 332 MW storage measure is not campus capacity and is excluded from totals.
Next checkpoints: primary permit and township records; verified funding flows; appeal disposition; phase-specific utility energization and acceptance; Oracle service commencement.
Sources: MPSC utility order summary · Kirkland close confirmation · Gibson Dunn close confirmation · MPSC emergency-load rule · MPSC storage approval · Related financing terms · Oracle construction update · Permit reporting. FJI project record. This review is a complete public-source pass over available material, not a whole-project certification.
AWS Susquehanna: a new contractual checkpoint
A contract transition is not an operating-load measurement
Talen’s later quarterly filing reports that the revised AWS power agreement transitioned in April 2026. The older annual forecast is retained as history, not treated as the latest actual.
Evidence and scope · One existing project and its regional contract; 2025 annual forecast versus Q2 2026 disclosed checkpoint. Reviewed October 16, 2026. This is a single-case observation, not a market trend.
Investor read-through · Our analysis: The disclosed contractual checkpoint is relevant to Talen’s supplier role and AWS’s input-power arrangements; no additional operating IT MW, site revenue or paid capital is established.
Uncertainty: Current delivered regional quantity, campus allocation, completed transmission configuration, customer acceptance and utilization remain unavailable.
Next checkpoint: Utility/project evidence for completed transmission configuration, actual deliveries and phase-specific customer acceptance.
Source basis and comparison limits
Transition beginning/full physical-transition forecasts and the later contractual milestone may have different scopes. No numeric schedule variance is calculated. This observation is not a market-wide trend.
- Talen Q2 2026 Form 10-Q — AWS PPA glossary · publication date not established
- Talen 2025 Form 10-K — contracted revenues · 2026-02-26
- Utility Dive — regional PPA and company roles · 2025-06-11
Susquehanna project and dated checkpoints → · Amazon company context →
More from the research desk
Construction does not establish customer-ready compute
Delivery · one-project case study
Construction does not establish customer-ready compute
Nebius targets first customer capacity in 2027. Municipal and independent reporting describe the operator, developer and building work; current evidence still does not establish accepted or utilized compute.
Investor read-through Track phase-specific commissioning and customer service acceptance before treating construction progress as recurring revenue.
Project record·Related case studies
Scoped review: October 13, 2026 · case study, not a portfolio trendSources, scope and next checkpoints
First verified workflow cycle · October 13, 2026
We checked Nebius Lappeenranta’s operator identity against company disclosure, the municipal announcement and independent Yle reporting. The structured NBIS role now has claim-specific evidence, a scoped review date and a preserved previous record. This was a directly executed cycle; unattended scheduled execution is not yet demonstrated.
Construction evidence does not establish delivered compute · Our analysis
Nebius’s March disclosure targets first customer capacity in 2027. The city identifies Nebius as operator and Polarnode as developer. Yle’s August reporting describes building work beginning in July and attributes an early-2027 first-building estimate to the contractor. These are different milestones. Our finding is that the construction evidence does not, by itself, establish installed, accepted or utilized compute.
For investors, building completion, equipment installation and customer acceptance remain separate checkpoints before site-specific operating revenue can be assessed. This is a one-project case study, not a portfolio trend or stock recommendation. It does not establish current delivered MW, a revised schedule, site earnings or the full permit position.
Next evidence to seek: a dated phase-specific commissioning record, defined power basis and customer service acceptance. Project research · Nebius · Municipality · Yle.
Grid commitments are not campus IT capacity
Power · one-project case study
Grid commitments are not campus IT capacity
Google’s Pine Island wind, solar and storage announcements concern grid resources. They do not establish campus IT load, commissioning, or site-specific payments; Alphabet’s filing does not allocate company-wide investment to this campus.
Investor read-through Separate generation, grid delivery and data-center load. Look for regulator decisions, commissioning and campus-level economics.
Scoped review: October 14, 2026 · case study, not a portfolio trendSources, scope and next checkpoints
Grid commitments are not delivered campus capacity · Our analysis
Google Pine Island scoped evidence pass reviewed 2026-10-14. This is a single-project case, not a market trend.
Google announced 1,400 MW of wind, 200 MW of solar, 300 MW / 30 GWh of long-duration storage and a separate $50 million contribution to Xcel’s Capacity*Connect program. These commitments describe grid resources or a systemwide program; campus IT MW, commissioning, and actual payments remain unverified. Alphabet’s latest reviewed quarterly filing reports company-wide infrastructure investment but does not identify Pine Island or allocate capex to the site.
FJI question: At each dated checkpoint, what was committed to deliver, by when, and what was actually delivered or paid? Track the PUC decision and the commissioning of each energy component before drawing conclusions about project capacity or company economics.
Sources: Google · Xcel Energy · Minnesota PUC · Alphabet Q2 2026 Form 10-Q. Project record.
Secured financing is not proof of capital deployed
Capital · issuer-attributed milestone
Secured financing is not proof of capital deployed
AirTrunk reported US$2.325 billion in green financing for JHB2. The record supports secured financing; drawdown, deployment, site spending and commissioned capacity remain unverified.
Investor read-through Keep financing, cash drawn, construction spending and operating assets as separate checkpoints.
Announcement: July 29, 2026 · scoped check: 2026-10-14Billing, cooling tests and public allocations measure different things
Realized demand · three-record cohort
Billing, cooling tests and public allocations measure different things
Denton billing, ODATA QR03 launch and cooling evidence, and Nebius Modiin’s government-confirmed service and voucher allocation describe different stages. They are not comparable utilization measures.
Investor read-through Follow cash collection, customer commissioning, actual usage and disbursement separately before comparing demand.
Three-record cohort · reviewed October 13, 2026 · no comparable utilization totalSources, scope and next checkpoints
From infrastructure to realized demand · Our analysis
Three-record research cohort reviewed 2026-10-13. Dated evidence, not events newly occurring today.
| Project | Evidence boundary |
|---|---|
| Core Scientific Denton | Issuer reports approximately 260 MW billing at mid-July 2026; not current metered IT draw. |
| ODATA QR03 | Launch module, building IT, grid energization and September cooling testing have separate scopes. |
| Nebius / Mega DC Modi’in — Israel national AI computing | Government-confirmed computing service and voucher allocation; actual usage and disbursement unverified. |
These are different stages of the bridge from infrastructure readiness to realized commercial demand, not comparable utilization measures.
Next tests: Current site billing and cash collection; QR03-specific cooling acceptance and customer commissioning; Modiin voucher awards/usage and actual disbursement. No cross-project MW or capital total is calculated. Persistence remains unassessed.
Bergheim: land monetization precedes service delivery
Bergheim: land monetization precedes service delivery · Our analysis
Scoped evidence reviewed October 14, 2026. One new campus, two checked company roles and two excluded contextual measurements. This is a project case, not a market-wide conclusion.
The RWE annual report records the land transaction. The March 2026 company announcement establishes construction initiation. The subsequent state application concerns backup equipment. These separate checkpoints demonstrate why a building permit, a generator application and customer acceptance must remain different fields in a delivery model.
Research implication: Test whether industrial-land transactions precede recurring cloud-service economics across additional projects. Do not infer a delay or utility revenue from this case. Operating IT MW, commissioning and campus spending remain unknown.
Project and five source documents → · Deutsch → · Inspect the FJI record → · Read the Spotlight analysis →
Explore the underlying data
Find a project. Follow its evidence.
Search the full inventory or filter by country and readiness. Expand a record for sources, company roles and open questions.
206 tracked records
Stargate Abilene · United States · Operating
Buckeye Technology Park · United States · Proposed / development
Microsoft Fairwater · United States · Operating
Meta Hyperion · United States · Proposed / development
AWS Susquehanna campus · United States · Proposed / development
Meta Sturgeon County · Canada · Under construction
STAK Energy Campus · United States · Proposed / development
Google The Dalles · United States · Operating
Switch Citadel · United States · Operating
Meta Eagle Mountain · United States · Operating
Meta Stanton Springs · United States · Operating
Equinix SV11 · United States · Existing facility / readiness unverified
Empire AI Beta · United States · Operating
Equinix MI6 · United States · Existing facility / readiness unverified
Equinix TR6 · Canada · Existing facility / readiness unverified
Compass Hoffman Estates campus · United States · Proposed / development
DataBank SNA2 expansion · United States · Operating
Vantage Ashburn II (VA2) · United States · Existing facility / readiness unverified
Edged Aurora expansion · United States · Under construction
Vantage Santa Clara III (CA3) · United States · Operating
Compass Loudoun County campus · United States · Existing facility / readiness unverified
Digital Realty ACC6 · United States · Existing facility / readiness unverified
CyrusOne Aurora campus · United States · Under construction
Digital Realty EWR12 · United States · Existing facility / readiness unverified
Compass Etobicoke campus · Canada · Proposed / development
Digital Realty YYZ10 · Canada · Existing facility / readiness unverified
QTS New Albany 1 · United States · Existing facility / readiness unverified
DataBank LGA3 · United States · Operating
QTS Richmond 5 expansion · United States · Proposed / development
Meta Rosemount · United States · Proposed / development
DataBank Red Oak campus · United States · Proposed / development
CyrusOne Allen campus · United States · Operating
Sabey SDC Seattle expansion · United States · Operating
DataBank SEA2 · United States · Existing facility / readiness unverified
DataBank BOS1 · United States · Existing facility / readiness unverified
AWS Mexico (Central) · Mexico · Operating
Microsoft Mexico Central · Mexico · Operating
Google Cloud Querétaro · Mexico · Operating
ODATA QR01 · Mexico · Operating
ODATA QR02 · Mexico · Existing facility / readiness unverified
ODATA QR03 · Mexico · Operating
Equinix MX1 · Mexico · Existing facility / readiness unverified
Equinix MX2 · Mexico · Existing facility / readiness unverified
Equinix MO1 · Mexico · Existing facility / readiness unverified
Ascenty Querétaro 1 · Mexico · Existing facility / readiness unverified
Vantage Quebec City (QC2) · Canada · Operating
Vantage Montreal II (QC4) · Canada · Existing facility / readiness unverified
Equinix MT2 · Canada · Existing facility / readiness unverified
Equinix CL1 · Canada · Existing facility / readiness unverified
Equinix VA1 · Canada · Existing facility / readiness unverified
Google Council Bluffs · United States · Operating
Google Papillion · United States · Operating
Meta DeKalb · United States · Operating
AWS New Carlisle / Project Rainier · United States · Operating
Google Pine Island · United States · Proposed / development
Meta El Paso · United States · Under construction
Vantage Frontier · United States · Under construction
Vantage Lighthouse · United States · Proposed / development
AWS Richmond County · United States · Proposed / development
Microsoft Fairwater Atlanta · United States · Operating
Project Jupiter · United States · Under construction
Stargate Michigan / The Barn · United States · Under construction
AWS Madison County · United States · Under construction
Meta Kansas City · United States · Operating
Google Berkeley County · United States · Operating
QScale Q01 · Canada · Operating (HPE AI Cloud deployment documented)
Vantage Montreal I / QC1 · Canada · Existing facility / readiness unverified
Microsoft Donnacona · Canada · Under construction
Microsoft L’Ancienne-Lorette · Canada · Under construction
Colossus Memphis — SpaceXAI / xAI · United States · Operating
Google Pryor / Mayes County · United States · Operating
Google West Memphis · United States · Proposed / development
Meta Cheyenne · United States · Under construction
Meta Kuna · United States · Operating
Meta Aiken · United States · Under construction
Meta Mesa · United States · Operating
Meta Los Lunas · United States · Existing facility / readiness unverified
Google Midlothian · United States · Operating
Stargate Lordstown · United States · Under construction
CoreWeave Lancaster · United States · Proposed / development
Kangerlussuaq Arctic AI proposal · Greenland · Proposed / development
Tusass Qinngorput · Greenland · Under construction
Equinix WI1 · Canada · Existing facility / readiness unverified
Equinix KA1 · Canada · Existing facility / readiness unverified
Equinix SJ1 · Canada · Existing facility / readiness unverified
Equinix OT1 · Canada · Existing facility / readiness unverified
KIO HER1 · Mexico · Existing facility / readiness unverified
KIO MER1 · Mexico · Existing facility / readiness unverified
Google Lenoir · United States · Operating
Google Montgomery County / Clarksville · United States · Operating
Google Douglas County · United States · Operating
Google Henderson · United States · Existing facility / readiness unverified
Google New Albany · United States · Existing facility / readiness unverified
Meta Huntsville · United States · Existing facility / readiness unverified
Meta Montgomery · United States · Proposed / development
Meta Forest City · United States · Operating
Meta Prineville · United States · Operating
Meta Fort Worth · United States · Operating
Meta Lebanon · United States · Proposed / development
Meta Bowling Green · United States · Proposed / development
Applied Digital Polaris Forge 1 · United States · Operating
Applied Digital Polaris Forge 2 · United States · Under construction
IREN Childress / Horizon · United States · Operating
IREN Prince George · Canada · Existing facility / readiness unverified
Core Scientific Denton · United States · Operating
Core Scientific Muskogee · United States · Under construction
Meta Altoona · United States · Operating
Meta Gallatin · United States · Operating
Google Lincoln · United States · Operating
Digital Realty PDX12 · United States · Existing facility / readiness unverified
Meta Temple · United States · Operating
Meta Sarpy · United States · Operating
Meta Henrico · United States · Operating
Meta Jeffersonville · United States · Under construction
Google Jackson County · United States · Operating
Google Loudoun County · United States · Operating
Google Mesa · United States · Operating
Vantage Phoenix / AZ1 · United States · Existing facility / readiness unverified
Vantage Quincy / WA1 · United States · Operating
Equinix DC21 · United States · Operating
Equinix CH4 · United States · Existing facility / readiness unverified
Equinix DA11 · United States · Existing facility / readiness unverified
Equinix TR7 · Canada · Existing facility / readiness unverified
Sabey SDC Quincy · United States · Existing facility / readiness unverified
CyrusOne Chandler / PHX1–PHX8 · United States · Existing facility / readiness unverified
Mistral AI Bruyères-le-Châtel · France · Under construction
Data4 Escaudain / Les Soufflantes · France · Proposed / development
QTS Calatorao / Project Rhodes · Spain · Proposed / development
Start Campus Sines / SIN01 and expansion · Portugal · Operating
Nscale Narvik / Kvandal · Norway · Under construction
AWS Warren County / Vicksburg · United States · Proposed / development
AWS / STACK Northwest Louisiana · United States · Under construction
Compass Meridian, Mississippi · United States · Under construction
AVAIO Digital Taurus, Brandon, Mississippi · United States · Under construction
AWS Falls Township / Keystone Trade Center, Pennsylvania · United States · Under construction
Bell AI Fabric Hillside / TRU · Canada · Under construction
Bell AI Fabric Sherwood · Canada · Under construction
Kao Data Harlow AI campus / KLON-03 · United Kingdom · Under construction
VIRTUS Marienpark / BERLIN1 campus · Germany · Under construction
Data4 Frankfurt-Hanau / Großauheim campus · Germany · Under construction
Meta Beaver Dam · United States · Under construction
Google Dorchester County campuses · United States · Under construction
AWS Louisa IAD-550 campus · United States · Approved / pre-construction
Google Fort Wayne / Project Zodiac · United States · Operating
Meta Davenport / Vemerald · United States · Approved / pre-construction
Microsoft Villamayor de Gállego campus · Spain · Approved / pre-construction
Google Waltham Cross · United Kingdom · Operating
Goodman TYO05 Tsukuba · Japan · Under construction
AirTrunk JHB2 · Malaysia · Approved / pre-construction
Goodman Project Pluto · Australia · Approved / pre-construction
QTS Fayetteville / Project Excalibur · United States · Under construction
Edged Project Atlas, South Whitehall · United States · Proposed / development
Stonebridge Fort Meade / Project Cumulus · United States · Proposed / development
Project Swan, Lakeland · United States · Proposed / development
Central Park Commerce Center / Project Tango · United States · Proposed / development
HostDime SuperNova, Eatonville · United States · Under construction
University of Florida East Campus / HiPerGator · United States · Operating
Global AI Weld / former Kodak campus · United States · Approved / pre-construction
RAEDEN Project Taurus · United States · Proposed / development
Beale Project Blue / South Houghton campus · United States · Under construction
Beale Luckett Road North / South · United States · Approved / pre-construction
Gemini / Sioux Falls Technology Park · United States · Approved / pre-construction
Intel Mission Campus / Santa Clara enterprise data centers · United States · Operating
Nebius / Mega DC Modi’in — Israel national AI computing · Israel · Operating
Flexential Parker / Compark · United States · Under construction
CoreSite DE3 / Race Street campus · United States · Under construction
QTS Aurora–Denver DEN1 · United States · Under construction
DataBank Centennial Campus / DEN5 · United States · Operating
CleanArc VA1 / Caroline County · United States · Under construction
Google Wilbarger County / Project Rise · United States · Under construction
Blockfusion / CoreWeave Niagara Falls · United States · Proposed / development
Stream STAMP / Project Double Reed · United States · Proposed / development
NCCS / NYDIG Massena AI conversion · United States · Proposed / development
H5 Buffalo I & II / former Yahoo Lockport · United States · Operating / delivered
JPMorgan Chase Orangeburg / Datacenter II · United States · Under construction
Dakota State Applied Research Lab, Sioux Falls · United States · Operating / delivered
QTS Phoenix 3 / PHX3, Glendale · United States · Permitted / development
Nebius Lappeenranta AI factory · Finland · Under construction
Google Visakhapatnam AI hub · India · Under construction
Microsoft India South Central / Hyderabad · India · Operating
Reliance–Meta Jamnagar AI data center · India · Proposed / development
SK–AWS Ulsan AI Zone · South Korea · Under construction
Nebius Independence AI factory · United States · Under construction
ByteDance / Omnia Pecém · Brazil · Under construction
Voltalia Pecém Data Center · Brazil · Announced
Scala AI City — Eldorado do Sul · Brazil · Announced
Nebius / Azur Béthune AI data center · France · Under construction
TSMC Arizona semiconductor manufacturing campus · United States · Operating
HyperDC MBL1 Moorabool · Australia · Proposed / development
Microsoft Bergheim / Paffendorf AI campus · Germany · Under construction
AWS Huechuraba Data Center · Chile · Proposed / development
Google Canelones Data Center / Proyecto Teros · Uruguay · Under construction
Microsoft Espoo / Hepokorpi campus · Finland · Under construction
Microsoft Kirkkonummi / Kolabacken campus · Finland · Under construction
Microsoft Vihti / Huhmari campus · Finland · Under construction
Google Hamina / Summa campus · Finland · Operating
Google Skien / Gromstul campus · Norway · Under construction
Google Winschoten / Hoogebrug campus · Netherlands · Operating
Meta Talavera de la Reina / Torrehierro campus · Spain · Permitted / development
QTS Cambois / Blyth AI campus · United Kingdom · Under construction
DeepGreen Western Passage subsea-compute proposal · United States · Proposed / development
Verne Keflavík VDC04 expansion · Iceland · Approved / pre-construction
Beyond.pl Poznań AI Factory / F.I.N. · Poland · Operating
Related Digital Cheyenne · United States · Under construction
Visionbay Xiaogang–Linhai AI Data Center — Phase One · Taiwan · Proposed / development
Prometheus Hyperscale Evanston Data Center Campus · United States · Approved / pre-construction
FJ Intelligence · quarterly research in development
From project records to an investor readthrough.
Future quarterly reports will track how announced projects convert through permits, financing, construction, power delivery and customer-ready capacity—and what the dated evidence supports about capital and company exposure.
Quarterly subscription reports and structured-data licensing are in development and are not currently offered. Each published finding will retain its sources, cohort basis and limitations.
Behind the research
Sources, methods and audit trail
Inspect how the records were assembled, what remains unverified and how the research has changed.
Research standards and measurement limits
Research standards and methods
History starts with this baseline. A time series requires later comparable snapshots; changes in coverage must remain separate from changes in projects.
Each record retains source references and original review dates. The relational archive preserves project, company, source, claim, role and measurement entities. Read our methodology and verification standard.
FJ Intelligence is the foundation for deeper subscription research and licensed data products. This first public monitor supports discovery; commercial research products and data licensing are not yet offered.
Coverage baseline and interpretation
What the baseline reveals · Our analysis
2 projects lack structured company-role mappings in the comparison record. Until these links are audited, company-exposure comparisons would undercount relationships. The immediate research priority is to verify roles and economic scope, rather than infer revenue from mentions.
39 projects retain an unverified-readiness label. This flags a documentation gap in our coverage; it does not prove that those facilities are inactive. Phase-specific power and customer-delivery evidence can change that assessment.
Capital and power: measurement candidates
Comparable capital and power
The importer found 629 numeric candidates. None is included in headline totals. Each needs quantity, currency, phase, announcement versus spending status, power basis and overlap checks. Candidate extraction is not factual verification.
Inspect numeric candidates
Coverage gaps and audit results
Baseline audit and current coverage flags
Structural checks cover 206 current project records. The October 13 baseline external check opened two primary documents and did not recertify any whole project. Current field-level reviews are listed separately below.
- 138 projects lack structured company-role mappings.
- 40 projects were flagged in the October 13 baseline; the October 14 QScale check reduced the current count to 39 still unverified.
- 147 measurement candidates lack a direct source in their origin field.
- 207 repeated project/quantity candidates require overlap review.
These are data-quality flags, not findings that projects are invalid. Source-checked announcements below remain excluded from operating-MW and spending totals.
| Record | Checked announcement | Boundary |
|---|---|---|
| Nebius Lappeenranta | Up to 310 MW | Full-deployment plan; first customer capacity targeted for 2027. Power basis unresolved. |
| Nebius near Lille / Béthune mapping | 240 MW | Full-deployment target. Exact site mapping depends on other profile evidence; current delivered load unverified. |
| TSMC Arizona | USD 265 billion | Announced multi-phase semiconductor program; not verified spending or AI-data-center capital. |
Documents reopened: Nebius March 31 announcement · TSMC Arizona corporate page. Detailed audit record.
Scoped reviews and company-role evidence
Certification backlog · Scoped project reviews
Scoped review dates are recorded per project; latest batch October 19, 2026. These are field-level checks, not whole-project recertifications. Evidence levels differ: attributed issuer statements remain attributed, and unresolved quantities remain outside totals.
| Project | Role checks | Quantities | Remaining evidence |
|---|---|---|---|
| Nebius Lappeenranta AI factory | 1 | 3 | 310 MW full-deployment basis; commissioned first-phase IT load and actual spending remain unverified. |
| Nebius / Azur Béthune AI data center | 1 | 1 | Lease terms, commissioned phase and conflicting target dates require resolution; government instruments not freshly checked. |
| Nebius / Mega DC Modi’in — Israel national AI computing | 2 | 4 | Current voucher awards/usage, reconciled program deadline, executed tariff and utility identity, metered IT load, 16 MW expansion delivery, parcel/permit identifiers, funding disbursements and realized earnings remain unverified. |
| Nebius Independence AI factory | 1 | 1 | Current building/phase design and power arrangements; state retrieval failed; no quantified spending or current operating load certified. |
| Stargate Abilene | 2 | 3 | Independent electrical / IT load basis, energized commissioning of delivered capacity, and project economics remain unverified; keep adjacent Microsoft development separate. |
| QTS Phoenix 3 / PHX3, Glendale | 1 | 1 | Historical 750 MW plan needs current direct primary confirmation; no current operating IT load or campus financial allocation. |
| Google Visakhapatnam AI hub | 2 | 2 | Separate campus/energy/connectivity allocations, IT basis, phase delivery and expenditures remain unknown. |
| TSMC Arizona semiconductor manufacturing campus | 1 | 1 | USD 265 billion is a semiconductor-program announcement, not AI-campus spending; Reuters retrieval failed; no site-spend certificate. |
| ByteDance / Omnia Pecém | 1 | 1 | Energy contract distinct from capex; current legal/licensing outcome and delivered phase remain unverified. |
| Voltalia Pecém Data Center | 2 | 3 | 322 MW connection versus 322.5 MW projection; locality conflict and environmental permissions unresolved; bank role only reported. |
| Meta Hyperion | 2 | 3 | Direct current regulator orders, service dates, commissioned IT load and campus-only expenditure remain unverified. |
| IREN Childress / Horizon | 2 | 2 | Independent customer acceptance, metered utilization, current Horizon 2–4 delivery and site expenditure remain unverified; Childress location page retrieval failed. |
| Microsoft Fairwater | 1 | 1 | First facility operating statement checked; comparable MW, utility acceptance and realized facility-specific expenditure remain unknown. |
| Nscale Narvik / Kvandal | 2 | 4 | Utility connection/energization, financing draw conditions and customer acceptance remain unverified. Aker’s current economic role needs follow-up; April disclosure describes sole Nscale management. |
| Start Campus Sines / SIN01 and expansion | 2 | 4 | Direct permit instrument, metered IT load, second-building acceptance and paid expansion allocations remain unverified. Annual renewable matching does not certify hourly supply. |
| Applied Digital Polaris Forge 1 | 2 | 3 | Independent utility/customer acceptance, utilization and remaining contracted capacity delivery remain unverified. |
| Applied Digital Polaris Forge 2 | 2 | 5 | Post-September utility progress, actual energization/customer acceptance, current permit compliance, metered IT load/utilization, site-specific paid capital and 280/300/200 MW boundary reconciliation remain unavailable. |
| Core Scientific Muskogee | 2 | 5 | Utility instruments/consents, conversion of acquired power into AI service and original-versus-expansion overlap remain unresolved. |
| QTS Fayetteville / Project Excalibur | 3 | 2 | Phase-specific current approvals, issued building/environmental permits, occupancy and utility acceptance, connected and operating IT MW, executed customer lease, financing allocation/use of proceeds and actual spending remain unverified. Crow Holdings denial must not be attributed to QTS. DRI completed status means regional review, not commissioning. |
| Central Park Commerce Center / Project Tango | 0 | 0 | Signed July denial order and final moratorium text, application-specific sufficiency and revision decisions, issued environmental/building permits, executed FPL agreement and current MW/tariff/delivery terms, named operator/customer and funded budget remain unverified. October 13 litigation reporting surfaced, but only the article preview was accessible and the complaint was not reviewed; no allegations are adopted as facts. |
| Core Scientific Denton | 2 | 6 | October billing/utilization, original current utility/lease amendments and consent status, reconciliation of 394 MW April potential envelope with September 297 MW existing plus 74 MW additional scope, permits and site-level cash returns remain unresolved. City’s broader investment forecast is not campus operator capex. |
| ODATA QR03 | 0 | 8 | Government/permit identifiers, executed power agreement, current utilized IT load, tenant identities and lease terms, site-only financed/spent capital, QR03 allocation of the combined cooling budget and final cooling acceptance remain unverified. |
| Google Pine Island | 2 | 4 | Final PUC order and full docket review; site ownership and campus IT MW; construction and opening milestones; actual Google service payments; wind/solar/storage commissioning and delivered output; Form Energy contract terms; site-specific capex and earnings. Corporate capex context is not site allocation. |
| Microsoft Bergheim / Paffendorf AI campus | 2 | 2 | Final backup-generator decision and conditions; executable grid delivery and IT-load scope; dated commissioning; current construction progress; campus-specific capex, expenditure, customers and recognized revenue remain unverified. |
| Google Pryor / Mayes County | 1 | 0 | Current accepted IT and facility MW, workload mix, utilization, site-attributable income, contract prices, tariffs, hardware renewal schedule and phase-specific capital allocation remain unestablished in the reviewed sources unless explicitly disclosed above. Targets remain expectations until confirmed. The map pin represents the locality rather than a verified individual building. Supplier, fund and corporate exposures must be modeled separately. |
| Google Midlothian | 1 | 5 | Resolved registered expansion scopes, target dates and current filed cost estimates. Remaining: Building 5 address/cost disagreement with March reporting, actual construction progress, occupancy and IT commissioning for each phase, current IT/peak MW, hardware utilization, campus energy consumption and site earnings. PUE ratios and accessibility-register closure do not resolve these. |
| Meta Prineville | 1 | 4 | Resolved historical construction count: city reports 11 completed buildings. Remaining: individual occupancy/IT commissioning dates, future expansion scope, current nameplate/peak and IT MW, hardware utilization, site earnings, tariff and phase capex. Annual facility electricity is disclosed for 2023–2024; it is not a current capacity or utilization measure. |
| QScale Q01 | 1 | 1 | Current accepted/energized IT MW, utilization, occupied capacity and HPE lease economics; Building B commissioning and occupancy. |
| IREN Prince George | 1 | 1 | Current commissioning and customer acceptance of the 10 MW hall; phase-level delivered GPUs and current IT load; recognized Prince George revenue and 2027 deployment scope. |
| AWS Susquehanna campus | 2 | 0 | Quarterly actual-transition wording does not resolve every earlier full-transition subphase.; Current actual regional MW, campus portion, IT utilization and cash payments unavailable.; Underlying current utility/FERC instruments and original latest call not reviewed; no new official-action/legal-status claim. |
| AVAIO Digital Taurus, Brandon, Mississippi | 1 | 0 | No controlling MPSC order/contract, current building permits, closed finance or accepted MW established.; No direct comparison of elapsed project days with physical output or paid spending; no quantified schedule variance.; Local observation does not establish underground/offsite work status or cancelled construction. |
| AWS Richmond County | 2 | 1 | Actual generation start/retirement, permanent-grid acceptance and IT load unavailable; Current administrative docket/stay/amendment not retrieved; Engine-count scope conflict excluded from proposed display; controlling instrument reconciliation required |
| Stargate Michigan / The Barn (Saline Township) | 7 | 5 | Direct primary EGLE/local permit records and current compliance; court appeal disposition; current phase energization, delivered and accepted IT load, commissioning, Oracle service start; actual financing draws, cash spent and project economics. Do not call fully certified until these evidence gaps close. |
| Meta El Paso | 2 | 1 | Verify full venture closing sources-and-uses and contribution transfers; inspect direct air permit conditions and final PUCT order; later verify utility energization, commissioning, customer acceptance and operating capacity. |
| AWS Huechuraba Data Center | 1 | 2 | Current construction and municipal acceptance; any later appeal/stay; original RCA exact date; later-phase power arrangements; site AI equipment, commissioned IT load, utilization, paid capex and attributable revenue remain unverified. |
| Google Canelones Data Center / Proyecto Teros | 1 | 4 | Current environmental operating authorization (AAO), module commissioning, utility acceptance and delivered load; disposition of reported administrative challenge; site AI hardware, utilization, paid expenditure and attributable revenue remain unverified. |
| Digital Realty PDX12 | 1 | 0 | Current delivered/energized IT MW, suite occupancy, AI tenants, liquid-cooling capability, utility service contract/tariff, measured PUE/WUE, phase acceptance and site cash flows remain unverified. The January 2026 tax decision was read; later appeal, payment, subsequent exemption years and tenant recovery were not established. Direct city permit documents were inaccessible. Size figures use different source bases; no expansion is inferred. Map pin remains representative. |
| Bell AI Fabric Sherwood | 2 | 4 | Exact cutoff of CAD150m to-date statement; Exact first receipt amount/payer and remaining receipt timetable; Current realized spending after August disclosure; Phase acceptance, utility energization and operating IT load |
| AWS Warren County / Vicksburg | 1 | 1 | Issued project-specific building/environmental permits; Entergy/utility executed supply and capacity terms; Post-June construction actual, energized/accepted load; Site-level paid expenditure; latest full earnings-call review |
| Bell AI Fabric Hillside / TRU | 1 | 1 | Phase-specific utility supply and occupancy/service acceptance; Hillside-specific capital and current construction actual; Do not conflate existing Kamloops facility with TRU |
| AWS Mexico (Central) | 1 | 1 | Government transcript retrieval403; parcel-specific permits/utility instruments not located. Retrieve Querétaro parcel identity and issued permits, then current service/load evidence. |
| Ascenty Querétaro 1 | 1 | 3 | Querétaro government project-specific search did not locate an accessible QRO1 permit. Retrieve Colón occupancy/electrical certificate and operator reconciliation of21vs25 MW; site capex and current occupancy unknown. |
| AWS New Carlisle / Project Rainier | 1 | 1 | IDEM original document retrieval failed. Obtain campus/phase permit crosswalk, utility acceptance and Indiana-only customer-service quantities. USD 15 billion later Indiana expansion is separate from originalUSD 11 billion scope; no site spend allocation. |
| AWS Madison County | 1 | 1 | County economic-development overview read; issued phase building/occupancy permits and utility acceptance not retrieved. Obtain current Canton and Ridgeland phase certificates, commissioned IT load and campus spending; no whole-county completion. |
| AWS / STACK Northwest Louisiana | 1 | 1 | Final plat is not all building/environmental approvals. Retrieve campus-specific permit IDs, SWEPCO service terms/energization, first customer acceptance and financing/drawdown evidence. |
| AWS Falls Township / Keystone Trade Center, Pennsylvania | 1 | 1 | Retrieve final09-0261 A decision/conditions, occupancy and customer-service certificates, phase-specific PECO acceptance and Falls capex allocation. Backup-generator count is not IT capacity. |
| AWS Louisa IAD-550 campus | 1 | 1 | Retrieve current DEQ74299-2 permit and parcel/site-plan crosswalk (Jefferson Highway versus Haley/Kentucky Road), issued building permits and utility service/commissioning. Full campus identity and actual delivery remain open. |
| AirTrunk JHB2 | 2 | 2 | MIDA page is NST republication, not permit; IFC institutional review is not local authorization. Retrieve JHB2 local building/operating approvals, TNB phase acceptance, customer-service date and disbursements; JHB1 operating scope remains separate. |
| Beale Project Blue / South Houghton campus | 1 | 1 | Retrieve post-Apr 23 inspection/occupancy records, ADWR issued well permits, final court disposition afterSep24 and TEP service acceptance. Current customer, financed/spent capex and operatingIT MW remain unknown. |
| Beale Luckett Road North / South | 1 | 2 | Retrieve final adopted plans, parcel closing, executed ACC-approved TEP/Trico agreements, funding and issued construction/occupancy permits. Site capex not disclosed in reviewed project sources. |
| Buckeye Technology Park | 1 | 1 | Tenant identity, financing terms, infrastructure budget, water and cooling plans, current energized capacity, completion dates and public-company project earnings remain unestablished. Reconcile current 2,019 acres with 2,069-acre acquisition announcement. |
| Meta Sturgeon County | 2 | 3 | Phase schedule, present spending, current power delivery, IT versus total-site interpretation of the 1 GW figure, hardware vendors, contract pricing, remaining supply arrangements and campus-attributable benefits remain unestablished here. |
| STAK Energy Campus | 1 | 2 | No final lease decision, issued entry authorization, verified construction start, operating capacity, funded all-in phase budget, binding gas supplier, turbine award, computing tenant, GPU order, network-service contract or site revenue was established in this review. Late 2028 is an applicant target. We use approximately 1 GW from the linked applicant plan and do not adopt higher capacity figures from secondary summaries without reconciling scope and document version. March12 applicant design states approximately1GW, whereas May12 DNR preliminary decision (attachment161957, page8), citing April28 cumulative impact analysis, describes1–3GW generation. This is an unresolved primary-source/phase-scope conflict, not only a secondary headline discrepancy; retain March1GW as dated applicant design only. |
| Google The Dalles | 1 | 1 | Current IT and facility MW, occupancy-equivalent utilization, workload mix, new-phase budget, hardware orders, tariffs, measured efficiency and campus-attributable revenue or operating savings remain unestablished by the location page. Map coordinates represent the campus area, not a specific server hall. |
| Switch Citadel | 1 | 2 | Current commissioned and billable MW, tenants, lease pricing, new-phase investment, power contracts, measured facility efficiency, supplier awards and site earnings remain undisclosed in the cited pages. The map pin denotes the Tahoe Reno campus area rather than a specific phase. |
| Meta Eagle Mountain | 1 | 1 | Expansion IT MW, standalone budget, completion dates, actual load, equipment orders, utility pricing, battery payment terms and campus-attributable financial benefits remain undisclosed in the cited materials. Map coordinates denote the Eagle Mountain campus vicinity. |
| Meta Stanton Springs | 2 | 0 | Current IT MW, AI workload share, measured utilization, site-specific return, tariff terms, peak water demand, new-phase budget and named equipment contracts remain unestablished in the cited article. The map pin represents the Stanton Springs campus vicinity, with no claim to identify a particular building. |
| Equinix SV11 | 1 | 1 | Current occupied cabinets, IT MW, AI workload mix, current fuel-cell capacity, upgrade spending and site earnings remain undisclosed in the reviewed sources. |
| Empire AI Beta | 2 | 1 | Supplier-specific contract value, hardware allocation, operating budget, actual utilization, maintenance terms and Gamma procurement spending remain unestablished. Scientific benefits are not equated with shareholder profit. |
| Equinix MI6 | 1 | 0 | Current IT MW, utilization, customer mix, AI hardware, pricing, insurance and maintenance costs, upgrade budget and site earnings remain unestablished. |
| Equinix TR6 | 1 | 0 | Current IT MW, billable cabinets, utilization, customer identities, AI mix, pricing, upgrade costs and site profit remain unestablished. No CAD project budget is invented. |
| Compass Hoffman Estates campus | 1 | 2 | Current construction progress, energized MW, tenants, lease pricing, financing terms, allocation of the investment headline and project-specific supplier contracts remain unestablished by the cited announcement. |
| DataBank SNA2 expansion | 1 | 2 | Current occupancy, AI workload share, rental rates, expansion budget, site margins, measured efficiency, tenant identities and incremental service receipts remain undisclosed in the completion release. |
| Vantage Ashburn II (VA2) | 1 | 1 | Current delivery dates, energized and billable capacity, tenant identities, utility arrangements, capital commitments, lease rates, measured efficiency and site-level financing are not established by the operator overview. |
| Edged Aurora expansion | 3 | 1 | Tenant identity, lease terms, project budget, financing, current commissioned second-building MW, measured efficiency and partner contract values remain undisclosed. |
| Vantage Santa Clara III (CA3) | 2 | 1 | Current customer utilization, contracted and billable MW, pricing, site capital cost, lease structure, measured PUE, actual electricity draw and workload-specific cooling approvals remain undisclosed in the cited project account. |
| Compass Loudoun County campus | 1 | 1 | Tenant identities, lease terms, energized and billable MW, delivery schedule, project capital, utility agreements, financing and site earnings remain unknown in the cited entry. |
| Digital Realty ACC6 | 1 | 0 | Current IT MW, occupancy, customer identities, AI workload mix, rent and renewal terms, upgrade budget and facility earnings remain unestablished. Stock valuation requires company-level work beyond this project profile. |
| CyrusOne Aurora campus | 1 | 1 | Post-groundbreaking progress, current energized MW, tenants, preleasing, project budget, completion dates, rental terms and binding utility arrangements remain unverified by the cited release. |
| Digital Realty EWR12 | 1 | 0 | Current occupied and billable capacity, rentable IT space, operating MW, site income, maintenance capital, customer identity, workload mix and project-specific supplier contracts remain undisclosed in the facility listing. |
| Compass Etobicoke campus | 1 | 2 | Current operating status and IT MW, leased capacity, tenant identities, explicit budget currency, final cost, financing, supplier contracts and campus earnings remain unestablished by the reviewed release. |
| Digital Realty YYZ10 | 2 | 1 | Project-specific Markham government evidence remains unread. Appraisal, operator and DCD area/story counts differ. Current metered IT load, AI use, named tenants and site-specific new capital remain unverified. Sourcing: retrieve/read the exact Markham site-plan record; Monitor: read October 22 EGM results and actual closing evidence before changing the dated ownership roles. |
| QTS New Albany 1 | 1 | 0 | Present building status, energized and billable MW, tenants, budget, lease rates, financing, utility capacity agreements and construction awards remain unestablished by the cited listing. Historical DCD144MW/675Beech Road campus plan requires address/phase crosswalk to current DC1/DC2; do not transfer historical envelope automatically. |
| DataBank LGA3 | 2 | 1 | Current occupancy, billable MW, rental rates, tenant identity, site capital cost, operating margin, contractor award economics and LGA4 commitments remain undisclosed in the announcement. |
| QTS Richmond 5 expansion | 1 | 1 | Exact DC5 permit decision, incremental IT MW, tenant and DC4–6 budget remain unresolved; threshold is strictly greater than $200m. $200m is a sponsor threshold assertion for the submitted project, not an exact incremental DC4–6 budget. |
| Meta Rosemount | 1 | 1 | Opening, IT MW, legal property-holding entity and realized spending not established; Xcel historical late-summer-2025 estimate conflicts with 2026 government target. |
| DataBank Red Oak campus | 1 | 2 | Q2 target completion not verified. DFW12 registration estimate is separate from financing total; $800m corporate revolver excluded. Oracle report not promoted to independently checked lease. |
| CyrusOne Allen campus | 1 | 1 | Operating draw, delivered split between DFW3/4, phase opening dates and capital budget undisclosed in read specification. |
| Sabey SDC Seattle expansion | 1 | 2 | Earlier 6MW Dec 2025 target is superseded in later scope and not added to 12MW; completion, utility agreement and project budget unavailable. |
| DataBank SEA2 | 1 | 1 | Capital budget, dated commissioning, consumed/contracted MW and legal property entity unavailable. Historical 2MW expansion video may overlap current 3MW total and is excluded. |
| DataBank BOS1 | 1 | 1 | Capital budget, dated commissioning, consumed/contracted MW and legal property entity unavailable. Building-wide Markley capacity is not assigned to BOS1. |
| Microsoft Mexico Central | 1 | 0 | Read region announcement does not disclose region-specific capex or IT MW. Microsoft $70.7b ecosystem income projection / Google $1.2b LATAM program are not site capex. Region is multiple facilities, not an identified dedicated AI cluster. |
| Google Cloud Querétaro | 1 | 0 | Read region announcement does not disclose region-specific capex or IT MW. Microsoft $70.7b ecosystem income projection / Google $1.2b LATAM program are not site capex. Region is multiple facilities, not an identified dedicated AI cluster. |
| ODATA QR01 | 1 | 1 | No current commissioned MW or phase capital disclosed. QR02 is Amexhe; current site labels Querétaro while 2024 release calls Guanajuato. Exact administrative location remains to reconcile. QR03 and QR04 excluded. |
| ODATA QR02 | 1 | 1 | No current commissioned MW or phase capital disclosed. QR02 is Amexhe; current site labels Querétaro while 2024 release calls Guanajuato. Exact administrative location remains to reconcile. QR03 and QR04 excluded. |
| Equinix MX1 | 1 | 0 | No site-specific IT MW or capex identified in read facility page. Three-site $175m cash and 8.5MW combined built capacity cannot be allocated equally or repeated as each site’s measurement. Current rack utilization/AI hardware not disclosed. |
| Equinix MX2 | 1 | 0 | No site-specific IT MW or capex identified in read facility page. Three-site $175m cash and 8.5MW combined built capacity cannot be allocated equally or repeated as each site’s measurement. Current rack utilization/AI hardware not disclosed. |
| Equinix MO1 | 1 | 0 | No site-specific IT MW or capex identified in read facility page. Three-site $175m cash and 8.5MW combined built capacity cannot be allocated equally or repeated as each site’s measurement. Current rack utilization/AI hardware not disclosed. |
| Vantage Quebec City (QC2) | 1 | 3 | No current metered or accepted MW, completion acceptance, project financing terms or phase spending. QC24 is building 4 at QC2, not Montreal QC4. Source-internal date inconsistency: explicit early2027 target differs from later next-year quotation relative to February2025. Retain explicit early2027 attributed target pending updated commissioning evidence. |
| Vantage Montreal II (QC4) | 1 | 1 | Current overview 50MW differs from older 48MW release/gallery. Retain as versioned issuer design claim; no 2MW delivery event inferred. CAD900m release covers several campuses, not QC4 capital. |
| Equinix MT2 | 1 | 0 | Total IT MW, current utilization and site-specific capital not disclosed in read specification. Space, kVA cabinet minimum, redundancy and global uptime are not total MW or site reliability evidence. Bell acquisition consideration is portfolio-wide. |
| Equinix CL1 | 1 | 0 | Total IT MW, current utilization and site-specific capital not disclosed in read specification. Space, kVA cabinet minimum, redundancy and global uptime are not total MW or site reliability evidence. Bell acquisition consideration is portfolio-wide. |
| Equinix VA1 | 1 | 0 | Total IT MW, current utilization and site-specific capital not disclosed in read specification. Space, kVA cabinet minimum, redundancy and global uptime are not total MW or site reliability evidence. Bell acquisition consideration is portfolio-wide. |
| Google Council Bluffs | 1 | 0 | Current campus IT MW, site-specific new capital, phase acceptance and AI workload mix unavailable. $20b+ Iowa cumulative and $7b statewide program span more than this campus. |
| Google Papillion | 1 | 0 | Current campus IT MW, site-specific new capital, phase acceptance and AI workload mix unavailable. $15b+ Nebraska cumulative, $1.2b three-city program and 2025 community economic activity are not Papillion spending. |
| Meta DeKalb | 1 | 2 | Total current IT MW, equipment mix and phase spending unknown. Mortenson completion must not replace 2023 first traffic; AI-designed construction concrete does not prove onsite training hardware. |
| Vantage Frontier | 1 | 2 | First-building acceptance, utility service milestones, tenant, leases and current load unknown. TDLR TX311 $74m office estimate is not a data-hall budget and excluded from campus comparison. |
| Vantage Lighthouse | 1 | 1 | Replacement docket EIS/completeness/approval, phase energization, customers’ exact contracts and construction financing unresolved. Existing profile says environmental assessment; PSC explicitly requires EIS: proposed correction. $15b+ joint-announcement budget not rechecked directly in this pass. |
| Microsoft Fairwater Atlanta | 1 | 0 | Campus IT MW, capital, installed GPUs and parcel/landlord identity not established. Microsoft source describes network-wide architecture; do not assign whole-network GPU counts to Atlanta. |
| Project Jupiter | 2 | 1 | Final microgrid permit, gas route, installed fuel-cell capacity and current legal partner roles unresolved. September reporting describes force-majeure and partner changes; April roles are historical. |
| Meta Kansas City | 1 | 1 | IT MW, actual expenditure period, current load and dedicated AI share unknown; next-generation AI design elsewhere cannot be transferred to Kansas City. |
| Google Berkeley County | 1 | 0 | No Berkeley-specific capital allocation, expansion MW or commissioning schedule. $13b cumulative statewide investment cannot be added to $9b program as distinct campus spend. |
| Vantage Montreal I / QC1 | 1 | 1 | Capital and opening date not disclosed in current source; 11MW is marketed critical IT envelope, not current consumption. |
| Microsoft Donnacona | 1 | 0 | Site-specific IT MW and capital not disclosed. Quebec-wide investment cannot be allocated. Utility acceptance and operation remain unknown. |
| Microsoft L’Ancienne-Lorette | 1 | 0 | Site-specific IT MW and capital not disclosed. Quebec-wide investment cannot be allocated. Utility acceptance and operation remain unknown. |
| Colossus Memphis — SpaceXAI / xAI | 2 | 0 | Capital and metered IT MW undisclosed in reviewed supplier release. Colossus1 Memphis must remain separate from Colossus2/Tulane and Mississippi generation. Current installed count and permits need site-specific reconciliation. |
| Google West Memphis | 2 | 0 | Site IT MW and campus-only capital allocation unavailable; 600MW solar/350MW battery are grid assets, not IT load. Ratepayer-benefit claims are utility projections. |
| Meta Cheyenne | 1 | 1 | IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates. |
| Meta Kuna | 2 | 1 | IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates. |
| Meta Aiken | 1 | 1 | IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates. |
| Meta Mesa | 1 | 1 | IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates. |
| Meta Los Lunas | 1 | 1 | IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates. |
| Stargate Lordstown | 1 | 0 | IT MW, standalone capital, commissioning, legal property title unresolved. Bundled Lordstown/Milam1.5GW cannot be assigned to Lordstown. Corporate mapping and signed funding instrument remain held; no operating IT MW or finance close inferred. |
| CoreWeave Lancaster | 2 | 2 | 100MW/300MW electrical basis not explicitly IT vs facility in release. CoreWeave up-to$6b equipping commitment separate from developer$4b financing; no spent total or acceptance. |
| Kangerlussuaq Arctic AI proposal | 2 | 0 | Government concession, parcel, funded capital, IT MW, hydro allocation and subsea cable delivery missing. Proposal may involve hydro bidding; MoU not concession. |
| Tusass Qinngorput | 2 | 1 | IT MW undisclosed; DKK155m is building and technical installation budget, not spend. No AI training-cluster role established. |
| Equinix WI1 | 1 | 0 | Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility. |
| Equinix KA1 | 1 | 0 | Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility. |
| Equinix SJ1 | 1 | 0 | Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility. |
| Equinix OT1 | 1 | 0 | Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility. |
| KIO HER1 | 1 | 0 | IT MW, site capital, occupancy and dated opening evidence unestablished in primary page. UPS kVA and redundant generator kW cannot be summed into usable ITMW. Design PUE not annual measured efficiency. |
| KIO MER1 | 1 | 0 | IT MW, site capital, occupancy and dated opening evidence unestablished in primary page. UPS kVA and redundant generator kW cannot be summed into usable ITMW. Design PUE not annual measured efficiency. |
| Google Lenoir | 1 | 2 | Current commissioned IT MW and campus-only paid capital are not disclosed in reviewed pages; $4B+ is region/state cumulative, not site basis. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. Current Google timeline retrospectively says$1.2b announcement in2007, whereas contemporaneous NC Commerce April19 2013 says$600m original and$600m additional2013; preserve source conflict, do not certify original$1.2b. |
| Google Montgomery County / Clarksville | 1 | 1 | Current campus IT MW and paid phase spending unavailable; $6B+ Tennessee total cannot be assigned wholly here. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Google Douglas County | 1 | 1 | Current commissioned IT MW and paid expansion spending are not disclosed; $3B+ Georgia commitment excludes site-only allocation. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Google Henderson | 1 | 0 | IT MW and current site-only capital unavailable; $6B+ Nevada cumulative is multi-site. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Google New Albany | 1 | 0 | Current site IT MW and capital deployment unavailable; $20B+ statewide investment spans multiple sites. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Huntsville | 1 | 0 | Current MW and total paid campus cost unavailable; city and company historical spending scopes differ and must be reconciled. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Montgomery | 1 | 1 | Site IT MW not disclosed. 227 MW cited by Meta concerns new Alabama renewable projects, not campus load. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Forest City | 1 | 1 | Current campus IT MW and paid capital unavailable; historical $450m proposal not actual spending. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Fort Worth | 1 | 0 | Current IT MW, current paid campus capital and expansion acceptance not disclosed in reviewed operator page. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Lebanon | 1 | 2 | 1 GW is design capacity target; basis not certified as IT versus facility electrical. Actual delivered load/spending undisclosed. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Bowling Green | 1 | 1 | Campus IT MW not disclosed. Toledo Edison named planning counterparty does not establish energized contracted MW. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Altoona | 1 | 0 | IT MW not disclosed; $2.5B+ current sheet explicitly labels Iowa investment rather than audited campus spending. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Gallatin | 1 | 1 | Current MW not disclosed by reviewed operator post. $1.5B is attributed campus investment, not audited disbursement; tent MW and overlap unresolved. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. Tent planning approval does not establish delivered tent computing capacity; keep permanent and rapid-deployment phases separate. |
| Google Lincoln | 1 | 0 | KOLN reports 52.65 MW peak demand from submitted report; underlying return not yet retrieved, so measurement held and excluded from aggregates. $15B+ Nebraska spans three sites. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. KOLN-reported52.65MW peak electrical demand is available as attributed reporting; original Agate return and measurement interval remain unresolved. Department public viewer returned JS shell; DocumentCloud embed retrieval failed. |
| Meta Temple | 1 | 1 | Current IT MW not disclosed. 9,000 MW Texas clean-energy portfolio is not Temple IT capacity; $1.2B+ remains issuer investment claim. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Sarpy | 1 | 0 | Current commissioned IT MW unavailable; $2.5B+ sheet labels Nebraska-wide investment and cannot establish each campus phase. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Henrico | 1 | 0 | IT MW unavailable; $1B+ state sheet and original $750m data-center plus $250m solar commitment are different scope components. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Meta Jeffersonville | 1 | 1 | Current IT MW not disclosed; $800m+ is prospective campus investment upon completion, not verified spending. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Google Jackson County | 1 | 1 | IT MW not disclosed; $2B+ Alabama cumulative and new $1.5B 2026-27 expansion overlap not established. 300MW new generation is regional power procurement, not IT load. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Google Loudoun County | 1 | 0 | IT MW and site-only capital allocation unavailable; statewide program must not be allocated to Loudoun alone. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Google Mesa | 1 | 0 | Current IT MW and paid capital not disclosed; phase-specific completion requires occupancy/service documents. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Vantage Phoenix / AZ1 | 1 | 1 | 176MW is full-development critical IT envelope. $675m 2019 financing spans multiple campuses/acquisition, not AZ1 budget. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Vantage Quincy / WA1 | 1 | 3 | Actual tenant-accepted or billable MW and metered load undisclosed; 89MW campus and 64MW WA13 overlap and cannot be summed. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. |
| Equinix DC21 | 1 | 1 | Current IT MW unavailable. 39,665 ft² is space not MW; $95m historical first phase differs from $200m DC metro total. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. Shared DC21/DC22 air-registration identity is not promoted without the exact underlying DEQ record. |
| Equinix CH4 | 1 | 0 | Facility capital, critical IT MW, metered load, opening date and occupied cabinets undisclosed. Government/permit and independent site-specific search attempted; no matched commissioning decision obtained. CH4 must remain floor-specific; TR7 separate from TR6. |
| Equinix TR7 | 1 | 0 | Facility capital, critical IT MW, metered load, opening date and occupied cabinets undisclosed. Government/permit and independent site-specific search attempted; no matched commissioning decision obtained. CH4 must remain floor-specific; TR7 separate from TR6. |
| Equinix DA11 | 1 | 1 | Tower 2 211,819 ft2 addition differs from operator colocation area. Estimated construction cost is not incurred capex. Independent directory search returned conflicting location/operator labels and was not used. |
| Sabey SDC Quincy | 1 | 1 | Reconcile current123MW marketed capacity headline,50–60MW aggregate delivered body and2023 >85MW planned addition, including overlap and phase definitions. DCD completion language differs from primary issuer future tense. No metered load, capex, utility customer allocation or occupancy certified. |
| CyrusOne Chandler / PHX1–PHX8 | 1 | 0 | Building-level occupancy, MW, capex and dated customer acceptance unavailable. City brochure text extraction does not expose map label; prior audit map attribution is not independently renewed. |
| Mistral AI Bruyères-le-Châtel | 1 | 2 | Do not count financing as cash spent. 200 MW Europe 2027 is portfolio scope, excluded. Eclairion government register found, but legal/phase linkage to Mistral cluster requires verification; operating MW unavailable. |
| Data4 Escaudain / Les Soufflantes | 1 | 2 | 700 MW is ultimate planned campus/service scope, not IT load. Company four-building wording versus report initial plus four additional buildings requires reconciliation; no spent capital. |
| QTS Calatorao / Project Rhodes | 1 | 1 | Power volume/basis, phase finance, actual spent capex, construction acceptance and tenant unknown. 223.4ha official versus rounded 224ha operator retained. |
| Compass Meridian, Mississippi | 1 | 2 | Nearly 500 MW is service-agreement volume, not IT delivered. $10bn includes future tenants equipment, not developer-only capex; no paid expenditure. |
| Kao Data Harlow AI campus / KLON-03 | 1 | 2 | 17.6 MW building design versus 22 MW campus lease must not be equated/summed. 152 MW permit figure is thermal backup input, excluded from IT. Project capex unavailable; Nebius UK-wide budget excluded. |
| VIRTUS Marienpark / BERLIN1 campus | 1 | 2 | Current 62.6 MW operator versus 57.6 MW dated utility/independent plans unresolved; neither operating load. No campus capital disclosed in selected scope. Exclude separate Wustermark project. |
| Data4 Frankfurt-Hanau / Großauheim campus | 1 | 2 | 180 MW operator power basis not automatically IT. Permit 457 MW is thermal generator input for partial scope, not IT or grid. Full 128-generator plan differs from initial 64; no metered load/spending. |
| Meta Beaver Dam | 1 | 1 | IT MW, phase-specific contracted grid volume, expenditure and customer/service start unverified. Renewable matching is not continuous carbon-free supply. |
| Google Dorchester County campuses | 1 | 1 | County fact sheet returned 403; government class attempted. Two-campus boundary, operating MW and phase spend unresolved. Statewide $3.3bn is not Dorchester-only. |
| Google Fort Wayne / Project Zodiac | 1 | 1 | Actual IT MW, accepted building count, capex spent and load ramp unverified. Future additional buildings not treated as operating. |
| Meta Davenport / Vemerald | 1 | 1 | No IT MW, current paid expenditure or actual handover confirmed; asset valuation and planned capex are separate. Company-specific page not in current cited sources; company class search limited to operator attribution in state record. |
| Microsoft Villamayor de Gállego campus | 1 | 0 | EUR5.356bn execution budget covers all three sites; EUR6.69bn older regional plan separate. No defensible Villamayor-only capital or power amount; none promoted. |
| Google Waltham Cross | 1 | 0 | Site-specific cost and operating IT MW unavailable in read sources. UK energy-management agreement not site-only electricity volume. |
| Goodman TYO05 Tsukuba | 1 | 1 | Current Goodman pipeline extraction omitted project details; search index shows TYO05 50 MW leased/1,000 MW secured. TKO05 vs TYO05 spelling needs reconciliation. Land sale JPY11.029bn is mixed-use land, excluded from DC capex. Latest Reuters October 7 access failed; indexed report flags opposition, not cancellation. |
| Goodman Project Pluto | 1 | 2 | 126 MW portal load capacity versus applicant 68 MW total consumption requires final consent/technical reconciliation. Capital not disclosed in read portal/submission scope; no incurred capex or commissioning evidence. Directory 2028 target not accepted. |
| Edged Project Atlas, South Whitehall | 1 | 1 | Three underlying documents now recorded, including the project-specific DEP notice; a fourth relevant accessible document is still required. Final permits, executed power allocation, financing, customer acceptance and delivered capacity remain unverified. Monitor: check the November 23 hearing and later permit disposition; Sourcing: obtain a readable current revised-plan/applicant document. The earlier $9bn six-building concept is not the revised three-building budget. |
| Stonebridge Fort Meade / Project Cumulus | 1 | 2 | County 1.925m ft2 vs Commerce 4.4m ft2 unresolved; entity relationship Florida Ecopark needs documents. No power amount, financing close or incurred capex. |
| Project Swan, Lakeland | 1 | 0 | Commercial owner/operator remains unidentified in primary material. Consultant Kimley-Horn role independently attributed in DCD and FOX13, not promoted to operator. No capital or power amount disclosed in reviewed municipal/independent scope. August 3/4 moratorium date discrepancy unresolved. |
| HostDime SuperNova, Eatonville | 1 | 1 | Operating MW, occupancy certificate, delivered utility volume, financing and actual spend unavailable. WKMG date sequence contains apparent 2020/2025 inconsistency; do not infer revised legal deadline. WFTV blocked by location. |
| University of Florida East Campus / HiPerGator | 2 | 1 | No project-specific executed utility agreement, tariff, measured IT MW, current GPU utilization, final funding reconciliation or operating budget was established. A research portfolio supported by the system is not computing revenue. Public value and supplier economics require different measures. |
| Global AI Weld / former Kodak campus | 1 | 1 | Current power duration, executed water terms, issued building/environmental permits, funding, equipment orders, tenants and delivered computing remain unknown. |
| RAEDEN Project Taurus | 2 | 1 | Final appellate land-use outcome, exact conditions, IT-versus-total load, customer identity, actual utility cost allocation, capex and financing are unresolved. |
| Gemini / Sioux Falls Technology Park | 1 | 1 | Tenant, executed supply agreement, MW, utility upgrades and allocation of costs, capex, financing, building permits and completion schedule are unknown. |
| Intel Mission Campus / Santa Clara enterprise data centers | 2 | 1 | Executed agreement, construction/procurement progress, actual spend, current IT load/hardware, fuel-cell fleet and incremental-power delivery remain unknown. |
| Flexential Parker / Compark | 2 | 1 | Executed power terms, energization, current delivery date, committed tenants, lease rates, debt, utilization and site margin unknown. |
| CoreSite DE3 / Race Street campus | 3 | 2 | Current executed JV terms, funding drawdowns, tariff/service terms, operating MW, tenant contracts, occupancy and future-building approvals unknown. |
| QTS Aurora–Denver DEN1 | 1 | 1 | Direct state air application/decision, phase-specific campus occupancy, utility agreement/tariff, energization, AI customers, operating capacity and financing unknown. |
| DataBank Centennial Campus / DEN5 | 1 | 1 | Campus permits/occupancy certificates, measured IT load, named AI customers, lease-up, specific financing and power commercial terms unknown. |
| CleanArc VA1 / Caroline County | 1 | 1 | Final construction/air permits, current funding close and debt terms, executed leases, verified delivered electrical and IT MW, occupancy, measured utilization, current schedule and site earnings remain unknown. |
| Google Wilbarger County / Project Rise | 2 | 0 | Campus IT and electrical MW, exact phase boundaries, current utility acceptance, occupancy, contract prices, actual spend, financing close, generation commissioning and site earnings remain unknown. |
| Blockfusion / CoreWeave Niagara Falls | 2 | 1 | Final AI phase permits, financing close, current conversion works, incremental power agreement, expansion activation, acceptance and rent commencement are not established. |
| Stream STAMP / Project Double Reed | 1 | 1 | Named tenant, final incentive award, DEC wetlands determination, land/substation closing completion, funded phase budget, campus service agreement and delivered load remain unverified. |
| NCCS / NYDIG Massena AI conversion | 1 | 1 | Original NYISO decisions, approved service terms, state exemption, executed host terms, financing close, named tenant, final permits and delivered AI load remain unknown. |
| H5 Buffalo I & II / former Yahoo Lockport | 2 | 1 | Current NYPA allocation terms, actual IT load, rent, financing details, current lease maturity and named AI workloads are not established. |
| JPMorgan Chase Orangeburg / Datacenter II | 1 | 0 | Power counterparty/service agreement, electrical and IT MW, current phase permits, incentive utilization, occupancy, GPU deployment and project-level returns remain unknown. |
| Dakota State Applied Research Lab, Sioux Falls | 2 | 1 | Utility terms, IT capacity, equipment suppliers, occupancy certificates, security accreditation, named tenant contracts, realized spending and earnings unknown. |
| Microsoft India South Central / Hyderabad | 1 | 0 | Region-specific accepted IT capacity and hardware configuration; Actual region utilization and incremental cash economics; Project-matched environmental, building and electrical acceptance records |
| Reliance–Meta Jamnagar AI data center | 2 | 1 | Project-specific permits, environmental approvals and service agreements; Exact parcel and construction evidence; Lease value, financing close, return and accepted IT load; Relationship to separately announced Reliance 120 MW sovereign-AI deployment and wider multi-GW campus |
| SK–AWS Ulsan AI Zone | 2 | 1 | Exact current financed phase and contract values; Project-specific permits, direct-power authorizations and tariffs; Accepted IT load and GPU inventory; Construction percentage, commissioning and site earnings |
| Scala AI City — Eldorado do Sul | 1 | 1 | No operating IT load, utilization or site earnings verified. See profile for legal, permit and location limits. |
| HyperDC MBL1 Moorabool | 1 | 1 | Planning decision, grid agreement and delivery date, customer or tenant, financing, EPC scope, construction start, cooling conditions and operating IT load remain unresolved. |
| Microsoft Espoo / Hepokorpi campus | 1 | 1 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. |
| Microsoft Kirkkonummi / Kolabacken campus | 1 | 0 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Direct final phase-two permit conditions and current compliance disposition require retrieval. |
| Microsoft Vihti / Huhmari campus | 1 | 1 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Current reconsideration/appeal disposition and final building compliance remain open. |
| Google Hamina / Summa campus | 1 | 1 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Hamina’s allocation of the Finland programme and new-land construction/commissioning remain unknown. |
| Google Skien / Gromstul campus | 1 | 2 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Exact allocation boundary, phased energization and final operating date remain open. |
| Google Winschoten / Hoogebrug campus | 1 | 1 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. DC1A legal-entity ownership chain, cable/phase scope and current appeal/utility acceptance remain unverified. |
| Meta Talavera de la Reina / Torrehierro campus | 1 | 1 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Direct 2026 reparcelation/guarantee files, final permits, legal-entity chain and current construction commencement need verification. |
| QTS Cambois / Blyth AI campus | 1 | 3 | Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Final detailed permissions, grid/IT basis reconciliation, funded phase budgets, tenant acceptance and actual spend remain open. |
| DeepGreen Western Passage subsea-compute proposal | 1 | 1 | Construction licensing, any issued preliminary permit, final ordinance applicability to the offshore design, continuous power and compute performance, installed or operating IT MW, funding commitments, paying customers, equipment contracts, ownership chain and public financial disclosures remain unverified. |
| Verne Keflavík VDC04 expansion | 2 | 1 | Actual construction start, issued building-permit conditions, phase-specific contracted and energized supply, commissioned IT capacity, site budget and spending, and customer commitments remain unverified. |
| Beyond.pl Poznań AI Factory / F.I.N. | 4 | 6 | No verified operating AI IT MW or energy measurement; No verified current installed GPU total; No audited final F.I.N. capex or attributable supplier revenue; No verified utilization, customer occupancy or recurring project earnings; Historic permits establish the host, not a new 2025 AI-specific approval. |
| Related Digital Cheyenne | 4 | 3 | Exact parcel ownership and campus coordinates, permit conditions, commissioned IT load, tenant acceptance, paid capital, project financing and lease economics remain unverified. The 420 MW capacity basis remains unresolved. No actual operating-power or spending total is established. |
| Visionbay Xiaogang–Linhai AI Data Center — Phase One | 2 | 2 | Exact site / permit: Original building permit, permit number, parcel schedule and lease boundary. Power: Direct Taipower letter with addressee, date, quantity basis, conditions, upgrades and energization milestones. BOO execution: Final selection/negotiation result and signed investment contract. Delivery / actual AI use: Site-specific construction inspection, installed hardware, commissioning and customer acceptance. Capital / earnings: Site budget allocation, financing close, drawdown/paid expenditure and revenue. Environmental / other utilities: Current water, sewer/discharge, fire and energy-use approvals where applicable. Company / hardware bridges: Xiaogang-specific supplier/customer contracts and a primary bridge to other Kaohsiung/program names. |
| Prometheus Hyperscale Evanston Data Center Campus | 1 | 1 | Full project delivery remains uncertified: no verified construction start; complete Wyoming Industrial Siting Act, DEQ/EPA air and other applicable permits; detailed campus/site plan; primary county resolution and separate power CUP instrument; power-plant design/fuel/emissions; financed/spent capital; tenant/customer; energized capacity; commissioning; operating IT load; metered water; or recognized project revenue. Public developer capacity figure lacks an IT-vs-facility-power basis. The August judicial dismissal was procedural/standing-based, not a merits ruling on environmental claims. |
Claim-specific company roles
nebius-lappeenranta · NBIS
AI-cloud operator identified by municipality; project sponsor described by Nebius and independent Yle construction reporting. Land ownership, supplier economics and site revenue are not established.
claim-specific role checked against company, municipal and independent reporting · Scoped check 2026-10-13
abilene · ORCL
Oracle is the customer and operator of computing at the existing Abilene campus. On its Sept. 10, 2026 earnings call, management reported six of eight buildings / 618 MW delivered to the customer; site economics and independently metered operating capacity are not established.
Issuer-stated customer / operator role and delivery milestone; delivery quantity not independently measured · Scoped check 2026-10-16
abilene · NVDA
Crusoe reports Oracle delivered GB200 racks; hardware supplier relationship, not disclosed site procurement revenue.
Issuer-reported deployment; supplier economics unknown · Scoped check 2026-10-13
nebius-modiin · NBIS
AI-cloud operator; government confirms national computing service, while company and Globes identify Modiin colocation.
Role sources rechecked October 13; no earnings or current load certification · Scoped check 2026-10-13
nebius-modiin · NVDA
Blackwell hardware and networking identified by operator; B200 program allocation confirmed by authority.
Role sources rechecked October 13; no earnings or current load certification · Scoped check 2026-10-13
qts-phoenix-3 · BX
QTS platform owned by affiliated Blackstone funds, not a direct campus-specific earnings allocation. QTS identifies Phoenix 3 location.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
google-visakhapatnam · GOOGL
AI-hub sponsor; commitment includes data-center, energy and connectivity components.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
google-visakhapatnam · ADANIENT
Participation via 50:50 AdaniConneX joint venture with EdgeConneX; partnership for campus and energy development.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
nebius-independence · NBIS
AI factory developer/sponsor; company describes building and phased contractor work, DCD reports groundbreaking.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
bytedance-omnia-pecem · PAX
Reuters identifies Omnia as Patria Investments platform building for ByteDance; government recommendation addresses Omnia WN. Specific equity economics unverified.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
voltalia-pecem · VLTSA
Issuer reports grid-use agreement; federal summary identifies Voltalia Energia do Brasil as proponent. Retained site economics unknown.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
voltalia-pecem · SAN
Reuters reports Santander retained to seek offtake; not confirmation of lending, ownership or a tenant.
Single independent report; bank confirmation pending · Scoped check 2026-10-13
nebius-bethune · NBIS
AI-cloud participant planning full deployment near Lille; DCD identifies Béthune redevelopment. Exact lease economics unknown.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
tsmc-arizona · TSM
Arizona foundry-campus sponsor/operator; official corporate and state disclosures distinguish production from expansion plans.
Scoped source check; not full-project recertification · Scoped check 2026-10-13
hyperion · META
Meta identifies itself as sponsor of Hyperion and the expanded Richland Parish campus.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
hyperion · ETR
Entergy Louisiana, an Entergy subsidiary, describes planned utility infrastructure for Meta. No project earnings allocation established.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
iren-childress · IREN
IREN reports delivery of Horizon 1 and development of the remaining Horizon phases.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
iren-childress · MSFT
Microsoft is the customer named in IREN’s Horizon 1 delivery disclosure. Independent acceptance evidence pending.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
fairwater · MSFT
Microsoft reports its first Mount Pleasant facility operational; second facility remains a separate construction scope.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
nscale-narvik · MSFT
Nscale identifies Microsoft as compute customer; DCD corroborates the changed customer scope.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
nscale-narvik · NVDA
NVIDIA Rubin is the announced future hardware platform; installed units and supplier revenue are unverified.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
start-campus-sines · MSFT
Microsoft is the compute customer identified in Nscale’s Sines agreement and DCD reporting.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
start-campus-sines · NVDA
NVIDIA hardware is specified for the future expansion; installed quantity and procurement revenue remain unverified.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
polaris-forge-1 · APLD
Applied Digital reports ownership/development and operational delivery at Polaris Forge 1.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
polaris-forge-1 · CRWV
CoreWeave is the customer named for Polaris Forge 1 in Applied Digital’s disclosure; lease economics remain separately scoped.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
polaris-forge-2 · APLD
Applied Digital’s subsidiary issued notes for Polaris Forge 2 development. Tenant identity remains undisclosed in checked documents.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
core-muskogee · CORZ
Core Scientific identifies the original Muskogee subsidiary and acquisition-led expansion.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
core-muskogee · CRWV
CoreWeave is the filing-named customer for the original Muskogee allocation; not inferred for every future expansion.
Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13
qts-fayetteville · BX
Owner of QTS; project-level earnings and capital contribution not disclosed
Primary-document role attribution checked · Scoped check 2026-10-13
qts-fayetteville · SO
Parent of Georgia Power, named electric provider for ATL2 East; service terms and project earnings not disclosed
Primary-document role attribution checked · Scoped check 2026-10-13
qts-fayetteville · MSFT
Tenant identified in AFII financial research; original lease and current accepted capacity not reviewed
Attributed independent-research tenant identity; original lease unreviewed · Scoped check 2026-10-13
core-denton · CORZ
Denton facility licensor on city-owned leased land; issuer reports billing capacity, not current measured IT utilization
Issuer/regulatory disclosure role checked; not independent earnings verification · Scoped check 2026-10-13
core-denton · CRWV
Contracted computing customer; site-specific cloud revenue and utilization undisclosed
Issuer/regulatory disclosure role checked; not independent earnings verification · Scoped check 2026-10-13
google-pine-island · GOOGL
Google announced the Pine Island data center and an arrangement under which Google pays costs associated with its electric service; legal site ownership, project-specific capital allocation, and site earnings are not disclosed.
claim-specific primary-source role check; no project-level earnings attribution · Scoped check 2026-10-14
google-pine-island · XEL
Xcel Energy is the electric-service provider and counterparty to the Clean Energy Accelerator Charge; the Minnesota PUC lists its agreement with Google subsidiary Echo Zone as under review. Agreement economics and project-specific utility earnings are not established.
claim-specific primary-source role check; no project-level earnings attribution · Scoped check 2026-10-14
microsoft-bergheim · MSFT
Microsoft sponsors the Bergheim campus; Microsoft Deutschland MCIO GmbH is the state-record applicant. No site revenue or operating acceptance established.
Claim-specific primary-source role check · Scoped check 2026-10-14
microsoft-bergheim · RWE
RWE reports selling Bergheim land to Microsoft in April 2024. Historical land vendor only; no verified campus utility contract, recurring revenue or disclosed transaction amount.
Claim-specific primary-source role check · Scoped check 2026-10-14
google-pryor · GOOGL
Google / Alphabet is the owner-user operator; current Google location page explicitly identifies the operating Pryor campus. No campus revenue or earnings allocation.
Claim-specific operator identity and existing-campus readiness checked · Scoped check 2026-10-14
google-midlothian · GOOGL
Owner-user campus operator supported by operating-site evidence; no project-specific earnings or currently delivered IT MW verified.
Claim-specific owner-user role and existing-campus readiness checked · Scoped check 2026-10-14
meta-prineville · META
Owner-user campus operator supported by operating-site evidence; no project-specific earnings or currently delivered IT MW verified.
Claim-specific owner-user role and existing-campus readiness checked · Scoped check 2026-10-14
airtrunk-jhb2 · BX
Shareholder identified in IFC project52336; fund ownership, not site-specific recognized BX earnings.
IFC-identified shareholder; scope checked · Scoped check 2026-10-14
qscale-q01 · HPE
Named anchor tenant and AI Cloud customer at Q01; QScale's customer case study reports successful launch. No site-level HPE rent, current draw, or utilization is disclosed.
Claim-specific tenant and customer-delivery role checked · Scoped check 2026-10-14
iren-prince-george · IREN
Owner-operator of the Prince George campus and AI Cloud service provider; issuer reports site-specific contracted ARR but does not allocate current recognized revenue or commissioned IT MW to individual halls.
Claim-specific owner-operator and site-demand role checked · Scoped check 2026-10-14
salem · TLN
Regional AWS power supplier; not campus computing operator
Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16
salem · PPL
PPL Corporation subsidiary PPL Electric Utilities: transmission/delivery role attributed to Talen in June 2025 reporting; completed current configuration and site revenue unverified
Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16
avaio-brandon · ETR
Entergy Mississippi service agreement reported by issuer; no delivered load or campus profit certified
Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16
aws-richmond · AMZN
Announced Richmond campus sponsor
Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16
aws-richmond · DUK
Duke Energy Progress temporary bridge-power permittee, not quantified campus earnings
Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16
stargate-saline · ORCL
Oracle is the intended customer and project operator/service provider. MPSC identifies Green Chile Ventures LLC as Oracle subsidiary and DTE customer; Oracle reports construction and intended customer delivery. Actual acceptance, service commencement and site revenue remain unverified.
Identity/customer role checked against regulator and Oracle sources; operations and economics unverified · Scoped check 2026-10-16
stargate-saline · OPENAI
OpenAI is named as a project/compute partner in the original site announcement and Oracle/Related construction announcements. Exact lease, capacity reservation, payment and operating role are not public in the reviewed evidence.
Project partnership role checked against issuer announcements; contract economics unresolved · Scoped check 2026-10-16
stargate-saline · RELATED_DIGITAL
Related Digital is the developer/sponsor and announced the financing package; project construction reports identify it as development partner.
Developer/sponsor role checked against sponsor and project-team announcements · Scoped check 2026-10-16
stargate-saline · BX
Related’s financing announcement identifies equity from funds affiliated with Blackstone. Treat as affiliated-fund investment; do not infer that Blackstone corporate balance sheet owns all assets or that the firm alone funds the project.
Fund-affiliate investment role checked against sponsor and project-team announcements · Scoped check 2026-10-16
stargate-saline · PIMCO
Related identifies PIMCO-managed funds and accounts as anchors of fixed-rate long-term project debt. This is managed-account/fund exposure, not proof that PIMCO corporate balance sheet is lender.
Managed-fund debt role checked against sponsor announcement; final closing/draws unresolved · Scoped check 2026-10-16
stargate-saline · DTE
DTE Electric is the regulated utility with MPSC-approved special contracts for Green Chile Ventures; DTE is also assigned to develop, own and operate approved storage facilities for grid benefit.
Regulated utility / storage developer role checked against MPSC disclosures · Scoped check 2026-10-16
stargate-saline · WALBRIDGE
Walbridge is identified in Oracle’s project-team releases as a construction partner; Oracle’s September 2026 labor update references a Walbridge safety manager on site.
Construction contractor relationship checked against project-team releases · Scoped check 2026-10-16
meta-el-paso · META
Meta announced the project as the campus developer and sole initial occupant / lessee; the July announcement describes a 2028 delivery target. Construction is independently reported as underway Oct. 14, 2026.
Issuer announcement and independent construction reporting; project role scoped, no operating capacity verified · Scoped check 2026-10-16
meta-el-paso · BLK
Meta describes an 80% venture interest for funds managed by BlackRock. Reuters reports a project-linked bond sale; this does not establish the venture’s complete funding or BlackRock corporate balance-sheet exposure.
Issuer-described fund-managed ownership plus independently reported debt issuance; full sources-and-uses not verified · Scoped check 2026-10-16
aws-huechuraba · AMZN
AWS sponsor through Servicios Amazon Data Services Chile SpA, named project holder. The wider Chile AI/cloud plan does not establish site-specific AI hardware, capacity, customers or earnings.
Claim-specific primary-source role check · Scoped check 2026-10-16
google-canelones · GOOGL
Google sponsors the Canelones / Teros digital and AI-supporting campus; Eleanor Applications is the environmental applicant. No site-level Google Cloud revenue, hardware contract, utilization or return is established.
Claim-specific primary-source role check · Scoped check 2026-10-16
digital-pdx12 · DLR
Colocation operator; Beaver Ventures LLC ownership chain documented in court decision. Site revenue and tenant cost recovery undisclosed.
Claim-specific operator and ownership chain checked; no site earnings or acceptance certification · Scoped check 2026-10-16
bell-sherwood · BCE
Bell/BCE campus developer/operator and capital-plan sponsor; source-attributed financial actuals, not guaranteed project returns.
Attributed claim-specific role; site revenue and acceptance unverified · Scoped check 2026-10-16
bell-sherwood · CRWV
Named future compute tenant in BCE Sherwood project paragraph; no attributable site revenue, utilization or identification as the prepayment payer.
Attributed claim-specific role; site revenue and acceptance unverified · Scoped check 2026-10-16
aws-warren · AMZN
Amazon/AWS is the announced investor and intended cloud operator for the Warren County/Vicksburg campus. Sponsor identity is supported by Amazon, the state announcement and original local reporting. No current operating acceptance or site earnings established.
Claim-specific sponsor/platform role source checked; no current commercial acceptance · Scoped check 2026-10-16
bell-tru-kamloops · BCE
Bell AI Fabric is the named platform partner for Hillside at 1452 McGill Road, supported by Bell, TRU Community Trust and original CFJC reporting. This scoped check does not establish legal asset ownership, current operations or site revenue.
Claim-specific sponsor/platform role source checked; no current commercial acceptance · Scoped check 2026-10-16
aws-mexico · AMZN
Amazon/AWS operates the Mexico (Central) cloud region; region-level role only, no parcel ownership or site earnings inferred.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
ascenty-qro1 · DLR
Ascenty is the named facility operator; Digital Realty shareholder backing is identified by Ascenty and DCD. No ownership percentage or site cash distributions established.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
aws-new-carlisle · AMZN
Amazon/AWS is the announced St.Joseph County campus investor and Rainier operator; Anthropic use is Rainier-wide and not allocated to Indiana.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
aws-madison · AMZN
Amazon/AWS is sponsor and cloud operator for the Madison County program; Canton operating statement and Ridgeland construction must remain separate.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
aws-northwest-louisiana · AMZN
Amazon/AWS is the announced cloud participant/investor; STACK is named developer/owner of the three campuses. No AWS freehold ownership or STACK revenue amount inferred.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
aws-falls · AMZN
Amazon/AWS is the named campus cloud investor/operator; NorthPoint is developer at Keystone. PECO coordination does not establish accepted campus computing load.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
aws-louisa-iad550 · AMZN
AWS is the Louisa two-campus program sponsor. Historical IAD550 comparison record identifies Amazon Data Services; no new parcel/legal equivalence to Lake Anna inferred.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
airtrunk-jhb2 · AirTrunk
AirTrunk Malaysia Sdn.Bhd. is IFC project52336 company; AirTrunk develops JHB2. This operator/developer role is distinct from the already recorded Blackstone shareholder role.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
beale-project-blue · Beale
Beale is the campus developer; Bobcat B1 land transaction and Bobcat Tucson Water linkage are project entities, not identified end customers or revenue counterparties.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
beale-luckett-marana · Beale
Beale is the Luckett Road developer; AZPM identifies Fremont Peak Properties LLC as its subsidiary/applicant. Landowners and utility pathways do not identify the final tenant.
Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16
buckeye · Tract
Land owner and technology-park developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sturgeon · META
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sturgeon · CPX
Disclosed capacity-and-energy supplier under >10-year ESA, not confirmed current delivery
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
stak · STAK Energy Corporation
Applicant and proposed developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-dalles · GOOGL
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
switch-citadel · Switch
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-eagle-mountain · META
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-stanton-springs · META
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-stanton-springs · Newton County Water and Sewerage Authority
Water service provider attributed by Meta with quoted authority executive; contract and allocation not independently retrieved
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sv11 · EQIX
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
empire · Empire AI
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
empire · NVDA
NVIDIA-powered Beta system named by hosting University; contract size not disclosed
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
mi6 · EQIX
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
tr6 · EQIX
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
hoffman · Compass Datacenters
Project developer / colocation provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sna2 · DataBank
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
va2 · Vantage Data Centers VA2 LLC
Project developer / colocation provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
edged · Edged US
Project developer / colocation provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
edged · FCL Builders
Construction partner named by Edged for second Aurora building
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
edged · ThermalWorks
Cooling-system provider named in second-building announcement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
ca3 · Vantage Data Centers
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
ca3 · DPR Construction
Project contractor reporting CA3 physical scope and October2024 customer opening
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
compassva · Compass Datacenters LLC
Project developer / colocation provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
acc6 · DLR
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
cyrusaurora · CyrusOne
Project developer / colocation provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
ewr12 · DLR
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
etobicoke · Compass Datacenters LLC
Project developer / colocation provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
yyz10 · DLR
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
qtsnal · QTS
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
lga3 · DataBank
Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
lga3 · AECOM/Tishman
General contractor identified by DataBank opening release
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
ric5 · QTS Richmond V, LLC
Sponsor / proposed campus developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
rosemount · META
Owner-user / developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
redoak · DataBank
Developer / construction financing borrower
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
allen · CyrusOne
Campus operator / developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sdcseattle · Sabey Data Centers
Campus developer / operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sea2 · DataBank
Colocation facility operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
bos1 · DataBank
Colocation facility operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
azure-mexico · MSFT
Cloud region operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-mexico · GOOGL
Cloud region operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
odata-qr01 · ODATA
Campus operator / developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
odata-qr02 · ODATA
Campus operator / developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-mx1 · EQIX
IBX colocation operator; acquirer from Axtel
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-mx2 · EQIX
IBX colocation operator; acquirer from Axtel
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-mo1 · EQIX
IBX colocation operator; acquirer from Axtel
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-qc2 · Vantage Data Centers
Campus developer / operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-qc4 · Vantage Data Centers
Montreal II campus developer / operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-mt2 · EQIX
IBX colocation operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-cl1 · EQIX
IBX colocation operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-va1 · EQIX
IBX colocation operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-council-bluffs · GOOGL
Data center owner / operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-papillion · GOOGL
Data center owner / operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-dekalb · META
Data center owner / operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-frontier · Vantage Data Centers
Campus developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-lighthouse · Vantage Data Centers
Lighthouse campus developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
fairwater-atlanta · MSFT
Named developer/operator of this data center in operator construction/operation disclosure
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
project-jupiter · ORCL
Announced cloud-campus customer and bearer of energy costs, as of April27 2026 attribution
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
project-jupiter · BE
Announced fuel-cell supplier, up to 2.45GW planned; installation unverified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-kansas-city · META
Named owner-user/developer of this campus in dated operator announcement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-berkeley · GOOGL
Named owner-user/developer in project disclosure
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-qc1 · Vantage Data Centers
Operator marketing Montreal I QC1 colocation and critical IT capacity
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
microsoft-donnacona · MSFT
Named developer/operator of this data center in operator construction/operation disclosure
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
microsoft-lancienne · MSFT
Named developer/operator of this data center in operator construction/operation disclosure
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
xai-colossus · X.AI Corp.
Builder/operator and Grok workload user as of Oct2024
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
xai-colossus · NVDA
Hopper GPU and SpectrumX networking supplier as of Oct2024
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-west-memphis · GOOGL
Named owner-user/developer in project disclosure
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-west-memphis · Entergy Arkansas LLC
Announced electricity supplier
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-cheyenne · META
Named owner-user/developer of this campus in dated operator announcement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-aiken · META
Named owner-user/developer of this campus in dated operator announcement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-mesa · META
Named owner-user/developer of this campus in dated operator announcement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-los-lunas · META
Named owner-user/developer of this campus in dated operator announcement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
stargate-lordstown · 9984
Developer of small Lordstown proof-of-concept, clarified in village-recorded company response
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
coreweave-lancaster · CRWV
Announced tenant and equipment investor
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
coreweave-lancaster · Chirisa Technology Parks
Co-developer with Machine Investment Group
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
greenland-arctic-ai · AmForge Corporation
MoU development partner; future operation intention
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
greenland-arctic-ai · Inuit Development Company
MoU development partner; not awarded concession verified
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
tusass-nuuk · Tusass A/S
Project owner/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
tusass-nuuk · Permagreen Grønland A/S
Main building contractor
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-wi1 · EQIX
Current branded facility operator;2020 Bell acquisition context
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-ka1 · EQIX
Current branded facility operator;2020 Bell acquisition context
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-sj1 · EQIX
Current branded facility operator;2020 Bell acquisition context
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-ot1 · EQIX
Current branded facility operator;2020 Bell acquisition context
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
kio-her1 · KIO Data Centers
Named facility operator, regional enterprise/edge service
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
kio-mer1 · KIO Data Centers
Named facility operator, regional enterprise/edge service
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-lenoir · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-clarksville · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-douglas · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-henderson · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-new-albany · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-huntsville · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-montgomery · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-forest-city · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-fort-worth · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-lebanon · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-bowling-green · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-altoona · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-gallatin · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-lincoln · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-temple · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-sarpy · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-henrico · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-jeffersonville · META
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-jackson · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-loudoun · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-mesa · GOOGL
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-az1 · Vantage Data Centers
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
vantage-wa1 · Vantage Data Centers
developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-dc21 · EQIX
colocation facility operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-ch4 · EQIX
Named IBX colocation operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-tr7 · EQIX
Named IBX colocation operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
equinix-da11 · EQIX
Equinix LLC owner of Tower 2; operator of DA11
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sabey-quincy · Sabey Data Centers
Quincy campus developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
cyrus-chandler · CyrusOne
PHX1–PHX8 Chandler campus operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
mistral-bruyeres · Mistral AI
Borrower and GPU-compute capacity sponsor at Bruyères-le-Châtel
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
data4-escaudain · Data4
Escaudain Les Soufflantes campus developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
qts-calatorao · QTS
Developer and intended operator of Calatorao/Project Rhodes
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
compass-meridian · Compass Datacenters
Meridian eight-building campus developer; Mississippi Power is named electricity counterparty
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
kao-harlow · Harlow Operations Limited
Kao Harlow campus operator; developer of KLON-03
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
virtus-marienpark · VIRTUS Data Centres
Marienpark campus developer/operator; DATA2HEAT planned heat reuse partner
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
data4-hanau · Data 4 Germany S.à.r.l.
Hanau campus applicant; Data4 developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-beaver-dam · META
Beaver Dam campus sponsor/operator; Mortenson named general contractor
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-dorchester · GOOGL
Google developer/operator of Dorchester campuses
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-fort-wayne · GOOGL
Fort Wayne/Project Zodiac owner/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
meta-davenport · Vemerald
Wholly owned Meta subsidiary and Davenport project developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
microsoft-villamayor · MSFT
Developer of Villamayor campus within three-campus Aragón cloud region
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-waltham-cross · GOOGL
Waltham Cross data-centre developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
goodman-tsukuba · Goodman Japan Tsukuba TMK
Land purchaser/development vehicle; Goodman sponsor
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
goodman-project-pluto · Goodman Property Services (Aust.) Pty Ltd
SSD-69223466 applicant identified by Urbis submissions report; no inference of end operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
edged-project-atlas · CDE Acquisitions LLC
Edged development affiliate for Project Atlas, per independent project reporting
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
stonebridge-fort-meade · Fort Meade DC LLC
County incentive applicant; Stonebridge developer per independent report
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
project-swan-lakeland · Kimley-Horn
Reported engineering consultant; not established as developer/operator
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
hostdime-supernova · HostDime
Developer/intended operator of SuperNova at 1 Innovative Pl
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
uf-hipergator · University of Florida
Owner/operator of HiPerGator East Campus system
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
uf-hipergator · NVDA
Installed DGX B200 technology supplier; contract revenue unknown
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
global-ai-weld · Global AI (Colorado), LLC
USR26-0019 project applicant
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
raeden-project-taurus · RAEDEN
Applicant/developer of Corporate Ridge Filing 1 Lot 4 modification
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
raeden-project-taurus · 3G Venture II, LLC
Site owner identified by city docket
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
gemini-sioux-falls · Gemini Data Center SD LLC
Landowner/applicant preparing Sioux Falls Technology Park; future operator unnamed
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
intel-santa-clara · INTC
Computing-site owner/customer funding Juliette expansion at 3750 Juliette Lane
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
intel-santa-clara · Silicon Valley Power
Owner/operator of Juliette substation under proposed agreement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
flexential-parker · Flexential
Developer and prospective operator of Parker fifth Denver facility
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
flexential-parker · CORE Electric Cooperative
Named planned electricity provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
coresite-de3-denver · CoreSite
Developer/operator of DE3
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
coresite-de3-denver · Stonepeak
Reported 85% JV investor in DE3 development
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
qts-aurora-denver · QTS
Developer/operator of Denver 1 Aurora campus
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
databank-centennial · DataBank
Owner/operator of adjacent DEN2 and DEN5 Centennial campus
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
cleanarc-va1-caroline · CleanArc Data Centers Operating LLC
Campus developer/operator through county-described subsidiary
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-wilbarger-rise · GOOGL
Developer/customer of Wilbarger data center under construction
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
google-wilbarger-rise · AES
Contracted co-located generation/powered-land developer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
blockfusion-niagara · North East Data, LLC
Landlord/owner under executed Niagara lease
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
blockfusion-niagara · CRWV
Tenant/customer under executed agreement reported September 2026
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
stream-stamp-double-reed · Stream U.S. Data Centers LLC
Applicant/developer of Project Double Reed at STAMP
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
nccs-nydig-massena · North Country Colocation Services
Existing site operator and proposed expansion applicant
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
h5-lockport-yahoo · H5 Data Centers
Real-estate acquirer/colocation marketer for Buffalo I/II
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
h5-lockport-yahoo · Yahoo
Continuing operating tenant under reported sale-leaseback
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
jpmorgan-orangeburg · JPMorgan Chase Bank, National Association
Owner/applicant for JPMC Datacenter II expansion and incentive agreement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
dsu-sioux-falls-arl · Dakota State University
Public-university project sponsor/user of Sioux Falls Applied Research Lab
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
dsu-sioux-falls-arl · IMEG
Mechanical/electrical/structural/technology/security design engineer
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
microsoft-hyderabad-south-central · MSFT
Operator of India South Central cloud region in Hyderabad
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
reliance-meta-jamnagar · Reliance Industries Limited
Build-to-suit developer and lifecycle services provider
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
reliance-meta-jamnagar · META
Prospective lessee/customer for announced 168 MW phase
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sk-aws-ulsan · SK Group
Ulsan AI data center partnership/development sponsor
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
sk-aws-ulsan · AMZN
AWS cloud/AI-zone partner in 15-year arrangement
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
scala-ai-city-eldorado-do-sul · Scala Data Centers
Announced AI City developer in Eldorado do Sul
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
hyperdc-mbl1-moorabool · Hyper DC Pty Ltd
Applicant for PA2604671 at 715 Ballan Road, Moorabool
Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16
microsoft-espoo · MSFT
Microsoft develops the Espoo campus; Microsoft 3465 Finland Oy is the municipal land purchaser. Fortum has a separate heat-recovery role; no site earnings allocation established.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
microsoft-kirkkonummi · MSFT
Microsoft develops the distinct Kolabacken campus. Fortum’s associated heat-recovery infrastructure is separate from Microsoft’s computing operations.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
microsoft-vihti · MSFT
Microsoft develops Vihti; Microsoft 3465 Finland Oy is the named permit applicant. Mercury is an issuer-identified contractor, with no contract economics established.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
google-hamina · GOOGL
Google operates Hamina; Alphabet is its public parent. The newly acquired land is potential expansion, not accepted incremental compute.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
google-skien · GOOGL
Google sponsors the Gromstul campus. ZAUNERGROUP reports a fit-out award; no contract value or site supplier revenue is established.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
google-winschoten · GOOGL
Google identifies Winschoten as its Dutch cloud/AI-supporting site. The provincial notice names Green Box Computing B.V. at Hoogebrug III; this is a location/permit match, not a reviewed corporate ownership chain.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
meta-talavera · META
Municipal records identify Meta’s campus; Europa Press identifies Zarza Networks S.L. as Meta’s subsidiary, attributed to the regional government. No campus operating revenue is established.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
qts-cambois · BX
QTS develops and will operate Cambois; Renaissance Land and Blackstone-affiliated fund ownership are distinct from listed Blackstone’s direct corporate ownership or attributable site earnings.
Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16
meta-kuna · META
Campus owner-user/developer and issuer-reported operator
Claim-specific attributed role checked; no site earnings or full certification · Scoped check 2026-10-17
meta-kuna · IDA
Idaho Power Brisbie electric-service counterparty; IDACORP corporate financial context, not campus owner
Claim-specific attributed role checked; no site earnings or full certification · Scoped check 2026-10-17
coresite-de3-denver · XEL
CoreSite names Xcel Energy as electricity provider for planned DE3 compute capacity; executed service terms, actual load and attributable earnings unestablished.
Claim-specific attributed role checked; no site earnings or full certification · Scoped check 2026-10-17
polaris-forge-2 · ABBN
Documented low/medium-voltage power architecture, UPS and switchgear supplier; no order value, site revenue or delivery acceptance inferred.
Exact supplierrole checked; amount/deliverynotdisclosed. · Scoped check 2026-10-17
deepgreen-western-passage · DeepGreen Western Passage SPV LLC
Named applicant for preliminary feasibility priority in FERC P-15424-000; ownership chain, committed funding, technology suppliers and customers remain unverified.
Claim-specific government-record applicant identity; ownership and commercial roles unverified · Scoped check 2026-10-17
verne-keflavik-vdc04 · Verne
Developer and operator; Verne Global ehf. is the municipal applicant for VDC04.
Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17
verne-keflavik-vdc04 · Ardian
Private shareholder: acquisition of Verne completed in March 2024; platform backing does not establish VDC04 funding drawn or spent.
Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17
beyond-pl-poznan-ai-factory · Beyond.pl
Developer, investor and operator; legal entity Beyond.pl Sp. z o.o., KRS 0000237620.
Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17
beyond-pl-poznan-ai-factory · Kulczyk Investments
Private owning group; official portfolio reports100% ownership of Beyond.pl. No phase-specific equity amount verified.
Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17
beyond-pl-poznan-ai-factory · NVDA
Disclosed DGX B200 compute and networking technology supplier/technical collaborator. No project contract value or attributable revenue verified.
Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17
beyond-pl-poznan-ai-factory · P
Disclosed FlashBlade storage supplier/technical collaborator. Everpure, Inc. is the current legal name; project disclosures used Pure Storage. No project contract value or attributable revenue verified.
Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17
related-digital-cheyenne · Related Digital
Developer
Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18
related-digital-cheyenne · CRWV
First-phase anchor tenant
Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18
related-digital-cheyenne · Clayco
Construction manager
Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18
related-digital-cheyenne · BKH
Initial-phase electric-service provider via Black Hills Energy
Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18
visionbay-xiaogang · Visionbay
Legal BOO applicant and proposed AI computing-service operator
Claim-specific source check; not current operation or site economics · Scoped check 2026-10-19
visionbay-xiaogang · 2317
Listed parent of applicant at latest June 30 reporting date
Claim-specific source check; not current operation or site economics · Scoped check 2026-10-19
yyz10 · DCRU
Reported 90% interest at June 30, 2026; proposed seller in the October 7 circular. A closed transfer has not been verified.
Dated issuer ownership disclosure checked; current closing not certified · Scoped check 2026-10-19
prometheus-evanston · PRIVATE:Prometheus-Hyperscale
Prometheus Hyperscale is the private developer/sponsor named in its project release and local coverage. No public-company ticker, attributable revenue or investor exposure is established.
Claim-specific role check; public-market exposure not identified · Scoped check 2026-10-19
Source-checked capital and power
| Project | Quantity | Measurement basis | Status | Exclusion / source |
|---|---|---|---|---|
| nebius-lappeenranta | 310 MW | Company-disclosed AI factory capacity; electrical versus IT-load basis not explicitly resolved | Company-announced upper bound | Power basis unresolved; not verified operating load Source |
| nebius-bethune | 240 MW | Company-disclosed full-deployment AI factory capacity; electrical versus IT-load basis unresolved | Company-announced target | Power basis and current delivered phase unresolved Source |
| tsmc-arizona | 2.65e+11 USD | Announced Arizona semiconductor manufacturing and packaging investment envelope | Announced investment; not actual spending or closed financing | Mixed manufacturing asset category, phase overlap and spending status; not an AI-data-center capital total Source |
| abilene | 1,200 MW | Planned total campus capacity; not current IT load | Announced full buildout | Adjacent Microsoft campus excluded; exact electrical basis and current delivery unresolved Source |
| abilene | 336 MW | Designed critical IT load per building | Design target | Separate neighboring campus; not assigned to original tracked campus or operating totals Source |
| nebius-modiin | 8 MW | Reported colocation site capacity; IT versus electrical basis unconfirmed | Independent report of site capacity | Not all government computing allocation; expansion and other Israeli sites excluded Source |
| qts-phoenix-3 | 750 MW | Reported planned critical capacity | Historical company-plan attribution in DCD | Original current primary capacity statement not established; current delivered load unknown Source |
| nebius-lappeenranta | 70 MW | Substation capacity; not IT load | Contractor-announced design | Infrastructure component overlaps campus; not additive to 310 MW Source |
| nebius-lappeenranta | 1.5e+07 EUR | Substation design/construction agreement | Approximately signed contract value | Not full-campus capex, spending or recognized supplier revenue Source |
| google-visakhapatnam | 1.5e+10 USD | Campus, energy and connectivity program commitment | Company-announced investment commitment | Mixed infrastructure components; not data-center-only expenditure Source |
| google-visakhapatnam | 1,000 MW | Government-described hyperscale data-center capacity; IT basis unconfirmed | Announced planned capacity | Government ceremony statement is not commissioning or metered IT load Source |
| nebius-independence | 1,200 MW | Historical planned campus capacity cited by DCD | Historical issuer target | Current engineering/phase scope unresolved; not metered operating power Source |
| bytedance-omnia-pecem | 2e+09 USD | 20-year energy supply agreement value | Company statements reported by Reuters | Not campus investment or financing close; exclude from capex totals Source |
| voltalia-pecem | 322 MW | Transmission-system-use agreement connection capacity | Issuer reports signed CUST with ONS | Actual agreement not independently inspected; not energized IT load Source |
| voltalia-pecem | 322.5 MW | Projected data-center capacity reported by Reuters | Projected capacity | Different quantity from 322 MW connection; exact IT/electrical basis and locality unresolved Source |
| voltalia-pecem | 1.817e+11 BRL | Projected total investment attributed to government by Reuters | Projected investment | Direct complete instrument, allocation and closed funding not verified Source |
| hyperion | 5,000 MW | Meta announced compute capacity; electrical/IT definition unresolved | Planned | Not delivered or metered power; no utilization inference Source |
| hyperion | 5e+10 USD | Lower bound of announced regional investment, includes infrastructure and workforce | More than this amount announced | Not campus-only paid expenditure Source |
| hyperion | 5,200 MW | Lower bound of planned gas generation | More than this amount planned | Generation is not data-center IT load; approval/service status not established Source |
| iren-childress | 50 MW | Issuer-reported critical IT deployment delivered to Microsoft | Delivery reported August 2026 | Delivery is not independently metered utilization or current accepted service revenue Source |
| iren-childress | 200 MW | Four stated 50 MW critical IT deployments | Program total; later phases incomplete at disclosure | Includes first tranche; never add to Horizon 1; not 750 MW site envelope Source |
| fairwater | 4.7e+09 USD | Estimated Wisconsin hyperscale construction spending across 2024–2028 | Issuer forecast | Not first-facility cost, GPU budget or spending already paid Source |
| nscale-narvik | 230 MW | Announced campus capacity; IT/electrical basis unresolved | Planned | Not operating load or proof of energized capacity Source |
| nscale-narvik | 100 MW | Contractor-stated capacity across three CSA building packages | Works underway; 2027 target | Building package is not metered IT load; overlaps campus plan Source |
| nscale-narvik | 7.9e+08 USD | Issuer-reported committed project financing | Committed, not evidenced as drawn | Exclude separate equally sized uncommitted accordion and corporate rounds Source |
| nscale-narvik | 7.9e+08 USD | Uncommitted expansion financing option | Uncommitted | Not available cash or closed funding; do not combine with committed amount Source |
| start-campus-sines | 200 MW | Announced second-building capacity; IT basis unresolved | Planned | Not SIN01 delivered load or entire 1.2 GW campus Source |
| start-campus-sines | 2.3e+08 EUR | Announced additional shared-infrastructure allocation | Announced investment | Not verified expenditure or all computing hardware Source |
| start-campus-sines | 4.65e+08 EUR | Announced second-building allocation | Announced investment | Separate allocation; not whole-campus capex or Microsoft spending Source |
| start-campus-sines | 26 MW | DCD-reported SIN01 capacity; metered IT definition unresolved | First building reported launched January 2025 | Operating milestone does not certify 26 MW utilization Source |
| polaris-forge-1 | 250 MW | Issuer-reported operational critical IT | Ready for Service reported | Not independently metered utilization; includes latest 75 MW Source |
| polaris-forge-1 | 400 MW | Contracted full-buildout critical IT | Contracted future scope | Overlaps operational tranche; not all delivered Source |
| polaris-forge-2 | 200 MW | Disclosed contracted critical IT program | Development scope | Financing does not prove delivered service Source |
| polaris-forge-2 | 2.15e+09 USD | Senior secured notes face value; issued at 98% of par | Offering reported complete | Not net cash proceeds or capital already spent; fees and discount separate Source |
| core-muskogee | 70 MW | Filing-disclosed CoreWeave critical IT allocation | Contracted allocation | Not a current delivery certificate; separate from acquired grid scope Source |
| core-muskogee | 100 MW | Estimated maximum demand under disclosed OG&E service agreement | Contract service scope | Not customer IT or metered use; utility consents require follow-up Source |
| core-muskogee | 440 MW | Approximate in-service gross grid capacity used by acquired Polaris DS | Issuer-reported in-service grid capacity | Not energized AI IT or proof of customer acceptance; overlap with original scope unresolved Source |
| core-muskogee | 1,500 MW | Approximate planned gross power | Planned grid and behind-the-meter combination | Not delivered capacity; includes future development Source |
| core-muskogee | 4.44e+08 USD | Approximate cash acquisition purchase price | Issuer-reported completed acquisition | Acquisition consideration is not AI campus construction spending; no spending aggregate Source |
| qts-fayetteville | 3e+09 USD | Estimated build-out value in ATL2 East DRI | Applicant/government-filed estimate, not capital commitment | Funding versus estimated value; scope overlap unresolved; not spent capital Source |
| qts-fayetteville | 4.6e+09 USD | Secured-notes offering disclosed by transaction counsel | Financing transaction, not paid construction capex | Funding versus estimated value; scope overlap unresolved; not spent capital Source |
| core-denton | 262 MW | Critical IT allocation | April contractual scope | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| core-denton | 260 MW | Approximate issuer-reported billing capacity, not metered IT draw | Dated issuer billing disclosure | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| core-denton | 394 MW | Potential PPA electrical load | Dated contractual potential | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| core-denton | 297 MW | Existing electrical load conditionally approved, issuer description | Conditional ERCOT status reported by issuer | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| core-denton | 74 MW | Additional electrical load to be energized | Validated study case per issuer; not energized | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| core-denton | 6.1e+09 USD | City forecast real-property investment by hosted tenant; broader scope | Expected investment, not verified spent | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 72 MW | Operator first-building IT specification | Dated source-attributed scope | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 24 MW | Executive-reported inaugural module | Dated source-attributed scope | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 300 MW | Planned IT load at full build-out | Dated source-attributed scope | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 200 MW | Issuer-reported substation/transmission infrastructure, not operating IT | Dated source-attributed scope | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 400 MW | Planned electrical infrastructure expansion, not operating IT | Dated source-attributed scope | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 3.3e+09 USD | Issuer investment headline; financing/spending basis unresolved | Announced estimate | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 3e+09 USD | Investment greater than USD 3 billion; lower bound, not exact spending | Announced lower bound | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| odata-qr03 | 6.3e+08 USD | Combined QR03/SP04 first-phase program, not QR03-only capital | Issuer combined investment figure; allocation unknown | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| nebius-modiin | 16 MW | Reported planned colocation expansion; IT/electrical basis unconfirmed | Expansion plan, not delivered load | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| nebius-modiin | 5e+08 NIS | Government-announced national computing investment above NIS 500 million | Projected investment, not paid capex | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| nebius-modiin | 1.6e+08 NIS | Government support included in investment, not additive; disbursement unknown | Announced support | Dated issuer/government scope; current utilization, paid spending or overlap not certified Source |
| google-pine-island | 1,400 MW | Announced wind generation capacity added to Xcel grid; not campus load | Company-announced commitment | Not campus IT capacity; not verified commissioned generation; avoid grid/campus and timing conflation Source |
| google-pine-island | 200 MW | Announced solar generation capacity added to Xcel grid; not campus load | Company-announced commitment | Not campus IT capacity; not verified commissioned generation Source |
| google-pine-island | 300 MW | Form Energy iron-air grid storage power rating; Xcel also reports 30 GWh energy capacity and 100-hour design duration | Announced storage project; not verified commissioned | Grid storage is a separate asset class from campus load and generation; commissioning and discharge performance unverified Source |
| google-pine-island | 5e+07 USD | Google-announced contribution to Xcel Capacity*Connect distributed battery program; not campus capex | Announced contribution; cash payment not verified | Not project construction spending or campus investment; do not attribute to site capex or Xcel earnings Source |
| microsoft-bergheim | 297.4 MWth | Phase-one backup-generator combustion thermal input under application | Applied-for authorization; final decision not established | Thermal fuel input is not electrical supply, IT load, or delivered computing. Source |
| microsoft-bergheim | 3.2e+09 EUR | 2024 Germany-wide investment package; contextual parent-program value | Announced envelope; no Bergheim allocation | Multi-site parent budget; not campus-specific capex, financing or spending. Exclude from project sums and prevent overlap. Source |
| meta-prineville | 11 buildings | City management-reported completed construction count | Reported completed in FY2024 report | Building completion is not individual server commissioning or IT capacity. Source |
| meta-prineville | 1.37532e+06 MWh | Operator-reported annual facility electricity consumption | Reported consumption | Energy is not IT nameplate MW, peak draw or utilization percentage. Source |
| meta-prineville | 1.72829e+06 MWh | Operator-reported annual facility electricity consumption | Reported consumption | Energy is not IT nameplate MW, peak draw or utilization percentage. Source |
| meta-prineville | 196.754 MW | FJI arithmetic derivation from annual facility energy | Derived annual average, not current/peak or IT load | Excluded from operating-IT totals; includes facility overhead and period-specific scope. Source |
| google-midlothian | 4.91727e+08 USD | Current state registered estimated construction cost | Filed estimate, not spent or financed | Conflicts with earlier USD 880 million reporting; no revision date or cost savings inferred. Source |
| google-midlothian | 288,000 sq ft | Registered construction floor area | Registered design scope | Not delivered IT capacity or current occupied computing. Source |
| google-midlothian | 3.5e+08 USD | State registered estimated construction cost | Filed estimate; accessibility registration closed | Register closure does not certify actual spending or computing acceptance. Source |
| google-midlothian | 1.12 PUE | Operator reported quarterly facility/IT energy ratio | Reported quarterly ratio | PUE is not utilization or nameplate capacity; cannot derive IT MW without compatible energy scope. Source |
| google-midlothian | 1.11 PUE | Operator reported trailing-twelve-month facility/IT energy ratio | Reported TTM ratio | Ratio-only evidence; no current IT capacity or utilization derived. Source |
| airtrunk-jhb2 | 2.325e+09 USD | Issuer-reported green financing secured, not expenditure | attributed financing announcement | Not operating capacity or paid spending; drawn/deployed unavailable Source |
| qscale-q01 | 114 MW | Operator-listed protected customer IT-load capacity; not measured consumption | Published maximum/specification; current energized, accepted and utilized load unknown | Operator capacity specification cannot be treated as current delivered or utilized IT MW; 142 MW campus power capacity and 60 MW Building B expansion have separate scopes. Source |
| iren-prince-george | 10 MW | Company-described IT load of one liquid-cooled installation; distinct from the 50 MW campus power figure | Under construction in August 2025; current commissioning status not established by the 2026 review | Historical construction evidence is not proof of present commissioning, customer acceptance, or measured IT draw. Source |
| polaris-forge-1 | 175 MW | Issuer-reported operational critical IT | Ready for Service reported | Cumulative same-campus observation; not independently metered utilization Source |
| polaris-forge-2 | 300 MW | Issuer-reported two-building construction capacity; not operating load | Under construction per October 7 filing | Overlaps 200 MW contracted subset; no independently accepted operating load Source |
| aws-richmond | 57 engines | Agency-issued temporary bridge-generation design authorization; not installed/operating count or IT MW | Agency announced air permit issued August 28, 2026 | Authorization is not delivered power or computing capacity; backup/bridge equipment must not be combined into an IT total Source |
| stargate-saline | 1,000 MW | Lower bound of sponsor-announced >1 GW campus capacity; IT versus utility basis not independently specified | Announced planned capacity lower bound | Greater-than quantity is a lower bound; basis and completed/operating status unresolved; not IT load or delivered phase capacity Source |
| stargate-saline | 1,383 MW | Maximum contracted utility load for Green Chile Ventures; not IT load | Conditionally approved special-contract load; delivery not verified | Utility maximum-load contract is not delivered or metered capacity and must not be combined with storage capacity Source |
| stargate-saline | 332 MW | Nameplate energy-storage capacity in first approved tranche; not generation or data-center load | MPSC-approved contracts; construction/operation unverified | Storage is a separate grid asset and not additive to data-center or delivered IT capacity Source |
| stargate-saline | 1.6e+10 USD | Sponsor-announced project financing package | Financing package closed April 30, 2026; draws and spending unverified | Closing date is reported by two transaction-counsel firms; drawdowns, capital deployed and realized project spending are not disclosed in reviewed sources Source |
| stargate-saline | 1,383 MW | Maximum contracted utility load covered by emergency load-shedding rule; not site actual power | Regulatory emergency operating procedure approved Aug. 27, 2026 | Emergency load rule is not a delivery or consumption measurement; maximum contract load is not IT load Source |
| abilene | 618 MW | Oracle management described 618 MW as 75% of stated total campus capacity represented by six of eight buildings delivered to customer; not independently measured IT load | Company-reported delivered-to-customer milestone as of Q1 FY2027 earnings call (Sept. 10, 2026) | Issuer-reported and not independently verified; electrical / IT basis and energized status not established; do not add to the 1.2 GW planned envelope Source |
| meta-el-paso | 12.3 USD billion | Reuters reported banks managed project-linked bond sale, citing a term sheet; distinct from announced equity / asset contributions and total project development cost | Reported debt sale (Aug. 10, 2026) | Not sources-and-uses reconciliation or evidence of cash spent; do not add to project cost or announced capital contributions Source |
| aws-huechuraba | 2.05e+08 USD | Environmental project investment estimate | Estimated; financing and spending unverified | A project estimate is not verified funding close, expenditure or asset value. Source |
| aws-huechuraba | 4e+09 USD | More than USD 4 billion Chile-wide program over fifteen years | Planned country program; no campus allocation | Overlapping regional context; not Huechuraba capex or spending. Excluded from project sums. Source |
| google-canelones | 8.5e+08 USD | Announced investment exceeding USD 850 million | Announced project investment; spending unverified | Announced investment is not financing closed, cash spent or site revenue. Source |
| google-canelones | 560 GWh/year | Final-stage modeled annual electricity use, below 560 GWh/year | Planning estimate; not metered usage | Annual energy cannot be relabeled as IT MW or delivered electrical capacity. Source |
| google-canelones | 420 GWh/year | Initial UTE annual-energy agreement as reported in the technical assessment | Documented planning-file agreement scope; current delivery unverified | Annual allowance is not current load; not additive with final-stage annual demand. Source |
| google-canelones | 48.1 m³/day | Estimated site water demand, principally personnel | Planning estimate; no metered actual | Water-demand estimate is neither operating use nor computing capacity. Source |
| bell-sherwood | 1.5e+08 CAD | Issuer-reported capital expenditures and associated cash outflows, approximately; not independently audited by this review | Reported to date in August5 MD&A; exact cutoff unspecified | Historical issuer-attributed scope; cutoff, phase overlap and current spend not certified Source |
| bell-sherwood | 1.3e+09 CAD | Expected 2026 capital expenditure | Forecast as of August5,2026; not paid expenditure | Plan, not actual Source |
| bell-sherwood | 1.7e+09 CAD | Expected incremental development capital expenditure | Project plan; no project-finance closing certified | Plan, not closed/drawn/spent funding; overlaps annual plan Source |
| bell-sherwood | 4e+08 CAD | Approximate setup fees/prepayments package, not total collected or recognized revenue | Package described August6; first Q2 receipt just below CAD100m | Receipts are not capex or site revenue; full package not all received Source |
| aws-warren | 3e+09 USD | Announced minimum planned investment; not actual spending | At least USD 3 billion planned; expenditure unverified | Planned amount, not financed/drawn/spent actual; no paid-spending aggregate. Source |
| bell-tru-kamloops | 26 MW | Bell-disclosed planned capacity; electrical versus IT basis not resolved | Planned; energization and customer acceptance unverified | Unresolved power basis and future facility scope; not operating IT load. Source |
| aws-mexico | 5e+09 USD | More-than lower bound; country/region investment plan over 15 years | Not site spending or financed capital | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| ascenty-qro1 | 25 MW | Operator-listed total site power, not customer IT load | Specification; delivered IT MW unverified | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| ascenty-qro1 | 21 MW | Historical total power at opening; not comparable to IT load | Historical specification;25 MW reconciliation open | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| ascenty-qro1 | 1e+09 BRL | Issuer-reported historical investment across two Mexican facilities | Not QRO1 allocation or independently audited paid spending | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| aws-new-carlisle | 1.1e+10 USD | Announced development investment, not Rainier-only budget or spent actual | 2024 plan over following decade; no current paid actual | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| aws-madison | 2.1e+10 USD | Madison County planned investment envelope; original10 billion+additional11 billion | Plan across campuses; not spent actual or statewide25 billion | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| aws-northwest-louisiana | 1.8e+10 USD | Announced three-campus regional investment plan | Aug 18 revised plan supersedes12 billion envelope; not additive spending | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| aws-falls | 2e+10 USD | At-least statewide investment lower bound; shared with Salem and potential other sites | Not Falls-only, financed or spent amount; overlap with Salem | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| aws-louisa-iad550 | 1.1e+10 USD | County-announced two-campus plan through 2040; no IAD550 allocation | Plan only, not IAD550 paid expenditure | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| airtrunk-jhb2 | 270 MW | 270+ lower-bound campus plan; IFC definition not commissioned IT draw | Greenfield plan; not operatingMW | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| beale-project-blue | 3.6e+09 USD | County up-to capital investment forecast; not funding close or spending | Forecast only; county land proceeds are a separate transaction | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| beale-luckett-marana | 550 MW | Lower bound estimated electrical demand per parcel; not service commitment or IT load | Town planning estimate550–750 MW per parcel | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| beale-luckett-marana | 750 MW | Upper bound estimated electrical demand per parcel; not IT load | Town planning estimate550–750 MW per parcel | Incompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates. Source |
| buckeye | 1,800 MW | developer-listed potential site power; not energized IT | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sturgeon | 1,000 MW | announced campus envelope; IT/site basis not defined | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sturgeon | 1.3e+10 CAD | more-than lower bound announced expected investment at full build-out; not spending incurred | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sturgeon | 250 MW | contracted capacity and energy; supply agreement >10 years | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| stak | 1,000 MW | approximately planned onsite gas generation; not IT load | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| stak | 5e+08 USD | site evaluation/preparation/engineering, gravel roads/pad and initial camp/support; not all-in generation/GPU budget | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-dalles | 7e+09 USD | more-than cumulative Oregon investment; excludes campus-only interpretation | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| switch-citadel | 130 MW | up-to historical building power design ceiling; not actual IT load | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| switch-citadel | 650 MW | up-to historical campus power design; overlaps building and later expansion | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-eagle-mountain | 3e+09 USD | more-than cumulative Utah investment after expansion; not expansion-only budget | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sv11 | 1.42e+08 USD | announced initial-phase development capex; not paid-cost verification or lifetime full-building cost | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| empire | 4e+07 USD | Beta supercomputer phase amount; not entire consortium budget or NVIDIA order value | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| hoffman | 1e+10 USD | approximate local investment once operational; not funded Compass capex | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| hoffman | 200 MW | operator-listed campus envelope; power basis not explicitly IT | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sna2 | 4 MW | added critical IT capacity, issuer reports expansion completed; overlaps8MW total | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sna2 | 8 MW | total critical IT capacity after expansion; not current utilization | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| va2 | 96 MW | future-tense campus critical IT design capacity; not commissioned load | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| edged | 72 MW | planned critical capacity, fully preleased per issuer; not operational | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| ca3 | 64 MW | more-than contractor-reported critical IT capacity; design/offered capacity, not utilization | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| compassva | 79 MW | operator-listed campus scale; IT versus gross power basis unlabelled | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| cyrusaurora | 40 MW | initial IT capacity announced; not current delivery | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| etobicoke | 30 MW | planned first-building critical IT design | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| etobicoke | 10 MW | planned initial critical IT tranche; subset of30MW | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| lga3 | 20 MW | operator-listed critical IT capacity; not utilized demand | attributed source claim; not independently metered | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| ric5 | 2e+08 USD | Sponsor assertion that total capital investment will well exceed FAST41 $200m minimum; threshold, not exact budget, funding or spend | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| rosemount | 8e+08 USD | announced investment lower bound; not final/spent | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| redoak | 2.65e+09 USD | closed construction financing commitments, not drawn debt/spending | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| redoak | 60 MW | incremental IT capacity planned | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| allen | 77 MW | operator-listed IT capacity, not measured utilization | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sdcseattle | 12 MW | preleasing expansion planned power; not metered IT consumption | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sdcseattle | 3.5 MW | then-marketed availability; not total campus capacity | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sea2 | 3 MW | operator-listed critical IT specification, not metered use | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| bos1 | 0.5 MW | operator-listed critical IT specification, not metered use | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| odata-qr01 | 32 MW | full-build announced campus capacity; precise utility/IT basis not defined in release | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| odata-qr02 | 30 MW | full-build announced campus capacity; precise utility/IT basis not defined in release | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-qc2 | 32 MW | announced incremental IT capacity | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-qc2 | 86 MW | announced full-campus IT capacity including QC24 | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-qc2 | 5e+08 CAD | announced development investment, not audited spending | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-qc4 | 50 MW | current operator-marketed full-development critical IT capacity; unresolved 48MW older figure | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-dekalb | 1e+09 USD | announced lower-bound investment at full operation, not audited spent | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-dekalb | 300 MW | contracted added renewable generation in Illinois; excluded from campus IT | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-frontier | 2.5e+10 USD | announced lower-bound investment; not financing or spending | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-frontier | 1,400 MW | Planned full-campus GPU-compute capacity as described by issuer; precise IT-versus-facility electrical boundary not independently established; not metered consumption | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-lighthouse | 902 MW | planned full-campus critical IT load, not transmission-system size/current consumption | issuer-announced | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| project-jupiter | 2.45 GW | Planned maximum fuel-cell generation nameplate; not IT load | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-kansas-city | 1e+09 USD | Greater-than campus investment disclosure; not annual spending | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-qc1 | 11 MW | Operator marketed critical IT capacity; not metered load | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-cheyenne | 8e+08 USD | Attributed campus investment greater than threshold; not audited cash spending | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-kuna | 1.2e+09 USD | Attributed campus investment greater than threshold; not audited cash spending | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-aiken | 8e+08 USD | Attributed campus investment greater than threshold; not audited cash spending | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-mesa | 1e+09 USD | Attributed campus investment greater than threshold; not audited cash spending | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-los-lunas | 2e+09 USD | Attributed campus investment nearly; historical2021 buildout | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| coreweave-lancaster | 6e+09 USD | Up-to intended equipment investment; not spent or construction budget | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| coreweave-lancaster | 100 MW | Initial announced data-center capacity; IT vs facility undefined | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| tusass-nuuk | 1.55e+08 DKK | Announced construction budget building plus technical installations; not actual spend | attributed-source-checked | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-lenoir | 6e+08 USD | historical government-reported original investment; not independently audited paid capital | source-checked government-reported amount | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-lenoir | 6e+08 USD | announced additional expansion commitment; not paid spend | source-checked government-reported amount | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-clarksville | 6e+08 USD | announced original project investment, government disclosure | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-douglas | 3e+08 USD | announced expansion commitment, not paid spend | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-montgomery | 1.5e+09 USD | more-than lower bound announced enlarged campus investment | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-forest-city | 4.5e+08 USD | approximately proposed initial investment, not actual disbursement | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-lebanon | 1e+10 USD | more-than lower bound expected investment once complete | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-lebanon | 1,000 MW | design capacity; IT versus facility boundary unresolved | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-bowling-green | 8e+08 USD | more-than lower bound expected investment once complete | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-gallatin | 1.5e+09 USD | issuer-described campus investment, not audited spending | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-temple | 1.2e+09 USD | more-than lower bound issuer investment claim at traffic launch | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-jeffersonville | 8e+08 USD | more-than lower bound prospective investment upon completion | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-jackson | 1.5e+09 USD | announced incremental expansion commitment | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-az1 | 176 MW | critical IT full-development envelope, not delivered MW | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-wa1 | 89 MW | campus IT specification following claimed final building delivery, not metered load | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-wa1 | 64 MW | WA13 stated IT capacity, subset of 89MW campus | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| vantage-wa1 | 1e+09 USD | more-than issuer cumulative campus investment claim since entering market | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| equinix-dc21 | 9.5e+07 USD | reported first-phase project cost; not whole-campus current paid capital | source-checked attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| equinix-da11 | 1.8e+08 USD | registered estimated construction cost, not spent | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sabey-quincy | 85 MW | over85MW planned additional critical-power envelope; issuer future-tense will add, not verified delivered expansion | attributed planned scope; delivery conflicted | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| mistral-bruyeres | 7.2e+08 USD | approximately debt tranche made available, not construction capex; financing made available, drawdown not established | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| mistral-bruyeres | 9.4e+07 EUR | approximately separate debt tranche; do not FX-combine; financing made available, drawdown not established | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| data4-escaudain | 5e+09 EUR | announced investment plan, not spent | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| data4-escaudain | 700 MW | ultimate planned capacity/electrical service; not IT | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| qts-calatorao | 1.3471e+10 EUR | up-to investment estimate in PIGA release, not committed financing | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| compass-meridian | 1e+10 USD | full-fit-out projection including tenant IT equipment | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| compass-meridian | 500 MW | nearly 500 MW signed long-term utility agreement; approximate, not delivered IT | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| kao-harlow | 17.6 MW | planned facility capacity; exact IT/service demarcation unresolved | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| kao-harlow | 22 MW | contracted campus capacity, not measured current load | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| virtus-marienpark | 62.6 MW | current operator planned IT capacity, scope conflict | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| virtus-marienpark | 57.6 MW | dated planned IT capacity; conflicts with current page | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| data4-hanau | 2e+09 EUR | over EUR2bn announced campus investment lower bound | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| data4-hanau | 180 MW | planned campus power capacity; not verified delivered IT | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-beaver-dam | 1e+09 USD | announced investment on completion, not spent | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-dorchester | 2e+09 USD | announced investment for two Dorchester campuses, not statewide/spent | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| google-fort-wayne | 2e+09 USD | announced investment plan, not audited expenditure | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| meta-davenport | 8e+08 USD | planned investment underpinning incentive action | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| goodman-tsukuba | 50 MW | leased capacity, not metered operating load | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| goodman-project-pluto | 126 MW | approved project load capacity, not IT or delivered power | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| goodman-project-pluto | 68 MW | proposed final power consumption, not established IT; differs from portal 126 MW load description | attributed proposal | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| edged-project-atlas | 725 MW | revised proposed campus capacity; IT/grid demarcation unresolved | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| stonebridge-fort-meade | 1.2e+09 USD | applicant planned real property improvements | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| stonebridge-fort-meade | 1.64e+09 USD | applicant planned tangible equipment; separate from improvements | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| hostdime-supernova | 1e+08 USD | independently reported project cost estimate, not audited spend | attributed announcement | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| uf-hipergator | 3.3e+07 USD | Issuer-described system purchase; not reconciled funding or audited cash spend | issuer-reported purchase | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| global-ai-weld | 1.56e+07 USD | Reported property consideration, not retrofit capex | secondary-reported historical acquisition | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| raeden-project-taurus | 50 MW | Conditional city utility-usage ceiling, not accepted IT load | conditional cap | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| gemini-sioux-falls | 500 MW | Developer-described potential site support requiring upgrades and future utility agreement | attributed planning potential | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| intel-santa-clara | 79 MVA | Planned total apparent-power allocation; existing 62 MVA plus 17 MVA; not MW IT | authorized conditional future allocation | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| flexential-parker | 22.5 MW | Planned site capacity/utility supply, not energized or occupied IT load | planned | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| coresite-de3-denver | 18 MW | Planned compute/critical power at full DE3 build; not 60 MW wider-campus scope | planned | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| qts-aurora-denver | 160 MW | Current advertised minimum planned critical-power capacity, value represents 160+ lower bound; not generator output | planned lower bound | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| databank-centennial | 16 MW | Operator-listed critical IT design capacity, not measured/leased load | marketed capacity | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| cleanarc-va1-caroline | 900 MW | Announced ultimate grid envelope, not delivered IT load or simultaneous initial phase | planned grid capacity | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| blockfusion-niagara | 35 MW | Executed first-tranche contractual critical IT load, 25+10 MW phases; delivery not verified | contracted prospective | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| stream-stamp-double-reed | 500 MW | Proposed campus design envelope; distinct from 600 MW STAMP-wide planning allocation | proposed | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| nccs-nydig-massena | 635 MW | Proposed expansion envelope, not delivered AI load or verified utility acceptance | proposed | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| h5-lockport-yahoo | 44 MVA | Operator brochure states two on-site substations totaling UP TO 44 MVA; upper-bound apparent-power rating, not measured MW/IT load | advertised rated infrastructure upper bound | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| dsu-sioux-falls-arl | 6.25e+07 USD | Reported estimated lab construction/project cost, not audited spend; separate workforce appropriation excluded | estimated project cost | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| reliance-meta-jamnagar | 168 MW | Announced agreed first-phase leased capacity, technical IT/facility boundary not independently certified | agreed prospective | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| sk-aws-ulsan | 41 MW | Government-described first partial operational phase target, not operating load | planned | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| scala-ai-city-eldorado-do-sul | 54 MW | Initial announced IT design plan; distinct from 120 MW future grid demand | planned IT capacity | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| hyperdc-mbl1-moorabool | 400 MW | Developer-attributed conceptual IT capacity quoted in independent reporting; not grid contract | proposed IT capacity | Attributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates. Source |
| microsoft-espoo | 3.09e+07 EUR | Municipality-reported land-sale value; not total campus capex | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| microsoft-vihti | 1.23e+07 EUR | Municipality-reported two-plot land-deal value; not paid campus construction cost | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| google-hamina | 1.3e+10 EUR | Finland multi-location digital infrastructure/clean-energy commitment, not Hamina allocation | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| google-skien | 6e+08 EUR | Announced data-centre and related infrastructure investment; not spent capital | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| google-skien | 240 MW | First-phase power allocation; IT-versus-facility boundary not certified; not metered load | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| google-winschoten | 6e+08 EUR | Announced site investment; not verified cash deployed | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| meta-talavera | 7.5e+08 EUR | Historical planning project estimate reported by DCD; not financing or spend | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| qts-cambois | 1e+10 GBP | Projected inward investment; not paid costs or financing closed | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| qts-cambois | 720 MW | Marketed campus capacity; electrical boundary unresolved; not commissioned IT load | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| qts-cambois | 1,100 MW | Councillor-attributed full-project power figure in fDi; not comparable with marketed 720 MW | Attributed source quantity; not delivery or paid-spending certification | Scope retained; excluded from comparable operating-IT-load and paid-spending aggregates. Source |
| coresite-de3-denver | 743,000 USD | Issuer-attributed historical soil-cleanup component, not campus budget, financing or independently verified paid capex | issuer-reported historical component | Attributed historical component; exact spending date and payment evidence unavailable. Not campus budget or aggregate paid capex. Source |
| polaris-forge-2 | 1.1e+08 USD | Estimated associated utility-project cost, not paid capital or campus budget | Estimated in final order | Retain March19$75m estimate as historical observation; do not label campus overrun or spending. Source |
| polaris-forge-2 | 280 MW | Utility expected peak usage; undated, not reconciled to issuer IT/construction scopes | Expected, not accepted/operating | Not additive/comparable with300MWconstruction or200MWcontracted; no PUE conversion. Source |
| deepgreen-western-passage | 4.8 MW | Calculated proposed generation nameplate: up to 16 units × 300 kW ÷ 1000 | Proposed; not installed or commissioned | Generator rating is not IT load, continuous output or delivered supply. Exclude all proposed and earlier differently scoped figures from operating-MW totals. Source |
| verne-keflavik-vdc04 | 120 MW | Planned electricity demand for hosting computer systems, excluding ancillary infrastructure loads | Planned application scope; not operating capacity | Planned demand is not delivered supply or metered operating IT load. Exclude from operating-MW totals. Source |
| beyond-pl-poznan-ai-factory | 7.57 PFlop/s | Linpack Rmax | Published benchmark | retain-in-own-unit Source |
| beyond-pl-poznan-ai-factory | 9.36 PFlop/s | Theoretical Rpeak | Published benchmark | retain-in-own-unit Source |
| beyond-pl-poznan-ai-factory | 100 MW | Committed campus power | Retained scoped claim; excluded from operating/project-spend totals | exclude-from-operating-IT-and-FIN-totals Source |
| beyond-pl-poznan-ai-factory | 150 MW | Campus target | Retained scoped claim; excluded from operating/project-spend totals | exclude-from-operating-IT-and-FIN-totals Source |
| beyond-pl-poznan-ai-factory | 1e+08 PLN | First-phase investment estimate; > | Retained scoped claim; excluded from operating/project-spend totals | Historical interview-based first-phase estimate above PLN 100 million; not final audited or paid expenditure. Source |
| beyond-pl-poznan-ai-factory | 250 GPUs | Planned GPU quantity; approximately, fewer than | Retained scoped claim; excluded from operating/project-spend totals | May2025 reported plan of fewer than/about250 GPUs; not a verified installed inventory. Source |
| related-digital-cheyenne | 88 MW | Planned critical IT capacity | Planned / announced; actual delivery or payment unverified | Phase and campus overlap; no operating capacity or actual spending demonstrated. Separate 420 MW basis unresolved. Source |
| related-digital-cheyenne | 302 MW | Upper-bound planned IT load | Planned / announced; actual delivery or payment unverified | Phase and campus overlap; no operating capacity or actual spending demonstrated. Separate 420 MW basis unresolved. Source |
| related-digital-cheyenne | 1.2e+09 USD | Announced investment; not paid capital | Planned / announced; actual delivery or payment unverified | Phase and campus overlap; no operating capacity or actual spending demonstrated. Separate 420 MW basis unresolved. Source |
| visionbay-xiaogang | 27 MW | Applicant-stated phase-one power use / requirement; not established IT load or metered demand | Applicant statement recorded at July 17 hearing | No direct Taipower instrument or energization/IT-load evidence; cannot enter operating-MW total Source |
| visionbay-xiaogang | 1.228e+09 TWD | Construction-cost estimate reported from building-permit information | Independent reported estimate | No direct permit obtained; narrower than total AI investment; not financed or paid capital Source |
| yyz10 | 6.765 MW | BBG appraisal stated critical IT capacity; not measured consumption | Dated appraisal observation | Historical appraisal scope; no current meter/AI load certification, project source qualification held Source |
| prometheus-evanston | 1,250 MW | Developer-stated planned capacity; IT-versus-facility-power basis not disclosed in reviewed source. Not delivered, energized, commissioned or measured. | Developer-announced planned campus capacity | IT-versus-facility-power basis unresolved; not verified delivered or operating load Source |
0 projects remain pending a first scoped pass. All reviewed projects retain the field-specific gaps above. No operating-MW or actual-spending aggregate has been certified.
Research change history
Project Change Scanner
12362 field-level research changes across 69 snapshots. Zero confirmed business-change events. These initial observations primarily reflect source mapping, scope checks and pipeline enrichment. They do not establish a market trend.
Each entry retains previous/current values, observation time, source references and verification scope. Historical snapshots are ordered by recorded timestamps, never filesystem modification time.
Loading change index…
Observation → interpretation → investor implications
The dated Lappeenranta sources describe construction and future customer availability separately.
Interpretation: Construction evidence alone does not establish operating IT load, customer acceptance or utilized capacity.
Investor implications: Assess documented company exposure only after delivery and commercial terms; no site revenue estimate is supported.
Confirm: Phase-specific commissioning and customer service-acceptance records. Invalidate: Evidence that a supposed construction-only record already establishes accepted customer compute for that same phase.
Case-study screening assessment
- evidence: 4/5 — Company, municipality and independent construction reporting checked for this limited claim.
- magnitude: Unrated/5 — Economic magnitude not quantified.
- persistence: 1/5 — One project case; no longitudinal portfolio trend demonstrated.
- investmentRelevance: 3/5 — Delivery timing matters, but contract economics and site earnings remain unknown.
- novelty: 1/5 — Useful scope clarification; not a demonstrated novel market discovery.
No total assigned because economic magnitude is unrated. This remains a case study, not an emerging portfolio signal.
FJ Signal Score · Internal screening prototype
Rate a hypothetical finding. The score is editorial judgment, not statistically validated confidence. It does not authorize publication.
No total — all dimensions must be assessed.
0 means unrated. Each assessment needs written justification, accessible evidence, a comparable cohort, uncertainty and confirmation/invalidation tests. Change records and rubric.