Project research / United States / Alaska

Greensparc Cordova Hydro Edge Pilot

Project stage Pilot deployed

Investment takeaway

Cordova provides evidence of a deployed edge installation using a remote microgrid. Its repeatability depends on aligning flexible computing demand with surplus hydro and limiting winter backup costs.

Research snapshot
Location
Humpback Creek hydroelectric facility near Cordova, Alaska
Stage
Pilot deployed
Status
A modular computing pilot was deployed at Humpback Creek. Current uptime and paid utilization remain unverified.
Capacity
150 kW cited by Greensparc and UAF. NLR reports 170 kW of delivered computing capacity; the measures are not reconciled.
Participants
Greensparc and Cordova Electric Cooperative
Next milestone
Document winter uptime, hydro and diesel shares, metered power use and paid customer demand.
Sources reviewed
November 21, 2026

FJI qualification held or pending: the full four-document gate, including project-specific government evidence, has not yet been accepted. Qualification evidence and decisions →

FJ Intelligence · Compare this project · Track milestones

Power and weather

The pilot sits inside the run-of-river plant, where cold mountain water can assist cooling. The cooperative expects some winter diesel use when river levels drop. Published sources do not establish a year-round hydro-only fuel mix or a measured PUE.

Customers and capacity

The national lab describes computing for utility controls and local businesses, together with a trial of GPU-as-a-service. The 150 kW and 170 kW reports may use different measurement scopes. Neither establishes contracted customer capacity or paid utilization.

Project economics

Surplus hydro can supply otherwise unused generation. Winter diesel, connectivity, equipment and maintenance costs determine delivered compute economics; project revenue is undisclosed.

What remains unverified

Current continuous operating status, metered winter fuel mix, actual uptime, realized PUE, customer terms and utilization remain unverified.

Sources

  1. National Laboratory of the Rockies

    Describes the deployment, 170 kW computing figure, local uses, surplus hydro and expected winter diesel use.

  2. Greensparc

    Operator reports a 150 kW modular deployment with Cordova Electric Cooperative.

  3. University of Alaska Fairbanks / ACEP

    Corroborates installation, 150 kW figure and local microgrid context.

  4. Data Center Dynamics

    Independent reporting on equipment delivery to Humpback Creek and HPE participation.

By Fjord Journal · AI-assisted reporting and analysis

Company investor information & quarterly statements

Financial-disclosure review remains incomplete for one or more participants. The company-level limitations below remain unresolved; this section does not establish full corporate-disclosure verification.

Cordova Electric Cooperative

The cooperative confirms member ownership and governance.

Project-specific financial performance remains undisclosed.

Supporting document

Greensparc

Greensparc identifies itself as the cooperative’s technology partner for the 150 kW modular pilot.

Greensparc’s ultimate ownership and the pilot’s paid utilization remain unverified.

Supporting document

Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →