Panthalassa Ocean-3 Offshore Compute Pilot
FJI source-qualified: four-document gate met, including project-specific government evidence. Qualification evidence and decisions →
Project stage Proposed / development
Published November 15, 2026 · Sources reviewed November 15, 2026
Explore FJI evidence · Compare projects · Track milestones · Project directory
Project status
Panthalassa is developing Ocean-3, an autonomous floating wave-energy platform intended to host AI inference computing. The company announced plans for a northern Pacific pilot in 2026 and commercial deployments in 2027. PNNL’s technical summary describes Ocean-3 as under development. In the public evidence reviewed through November 15, 2026, we found no confirmation that an Ocean-3 node had been deployed or was operating an AI workload.
On November 6, Panthalassa unveiled its Vancouver, Washington factory. OPB reported that it represents the company’s first effort to move from custom manufacturing to an assembly-line approach. This is a real manufacturing milestone, but it does not establish serial-production output, completed Ocean-3 nodes, or offshore commissioning.
Technology and intended workload
The company describes self-propelled nodes that capture wave energy, use it to run onboard computing, and transmit results via low-Earth-orbit satellite. PNNL documents an earlier Ocean-2 three-week sea trial in February 2024; that trial tested systems needed for full operation of Ocean-2 and should not be read as a demonstration of Ocean-3 data-center performance.
Investor lens: satellite transmission and onboard inference may suit workloads that can tolerate constrained bandwidth and latency. That is an analytical inference from the architecture, not evidence of a customer use case. Useful measures will include continuous power delivery, compute uptime, satellite throughput, maintenance intervals and operating cost per unit of useful computation.
Factory and capital
Panthalassa announced a $140 million Series B in May 2026 and said proceeds would support manufacturing and initial deployments. The company’s funding announcement does not disclose Ocean-3 project capex, cost per node, production yield, working capital needs or how much capital remains available for deployment. OPB reported that the Vancouver factory could employ about 50 people when fully staffed; the announced staffing potential is not a verified current headcount or production rate.
Investor takeaway
The factory makes the manufacturing effort more tangible. The core investment question remains unresolved: can a wave-powered offshore node reliably generate and use enough electricity for useful AI inference, while surviving the marine environment and reaching customers at a competitive total cost? The public record reviewed here does not yet establish Ocean-3 deployment, measured power or compute output, customer contracts, node economics or commercial service. The 2027 target therefore remains an execution milestone to monitor, not a base-case outcome.
Panthalassa named Super Micro Computer among investors in its May Series B, and NAVER announced an investment in August; NAVER did not disclose the amount or stake. These statements establish investor relationships only. Neither release establishes a customer contract, supply order, Ocean-3 revenue contribution or materiality to either investor. Company-level financial results should not be assigned to this project.
Permitting and marine evidence
The exact pilot area, grid-connection status and regulatory pathway have not been disclosed in the sources reviewed. FERC and BOEM describe regulatory pathways for some hydrokinetic projects, including offshore cases, but we have not verified which approvals apply to Ocean-3 or identified a project-specific permit or lease. The NOAA marker on the map is a regional reference point only; it is not an announced or approved Ocean-3 site.
Wave energy remains a pre-commercial sector with engineering, reliability and scale-up challenges. Those industry-level observations identify diligence questions; they are not a project-specific finding about Ocean-3.
Next evidence
- Dated confirmation that an Ocean-3 node has reached the announced pilot area, with coordinates or an appropriately bounded location.
- Measured generation and computing results, including uptime, capacity factor, workload completion, satellite data delivery and maintenance events.
- Customer identity and contract scope, if disclosed; distinguish investment participation from compute demand.
- Factory output, unit cost, deployment and recovery logistics, and repeatable manufacturing evidence.
- Project-specific permitting, environmental review, insurance and marine-safety information.
Delivery commitments and dated checkpoints
- February 2024: Ocean-2 completed a three-week trial, as summarized by PNNL. It tested Ocean-2 systems; it was not an Ocean-3 compute deployment.
- May 4, 2026: Panthalassa announced a $140 million Series B and a plan to deploy Ocean-3 pilot nodes in the northern Pacific during 2026; commercial deployments were targeted for 2027. Company-announced target
- August 13, 2026: NAVER announced an investment and repeated the 2026 demonstration / 2027 commercial target. Investment amount and stake were not disclosed.
- November 6, 2026: Panthalassa unveiled its Vancouver factory. This records a manufacturing-site milestone, not Ocean-3 deployment.
No verified offshore commissioning or commercial-service date is available. Schedule performance against the company’s pilot target cannot be determined from factory opening alone.
Sources and claim boundaries
The profile draws on official government technical and regulatory material, company announcements, independent reporting and a peer-reviewed sector review. Company schedules and financing are attributed as announced. Sector context is not treated as project-specific test evidence. No project output, capacity, customer revenue, investment return or deployment coordinate is inferred.
- Pacific Northwest National Laboratory / U.S. Department of Energy · Date not stated
PNNL identifies Ocean-2 as a Panthalassa wave-energy converter tested in a three-week trial in February 2024, testing systems required for full operation, and says Ocean-3 is under development as a floating platform designed to host data centers. Ocean-2 testing does not demonstrate Ocean-3 compute performance.
Triton Explains: Marine Energy, “Wave energy testing in the Pacific Northwest” and Ocean-2 trial description. · Reviewed 2026-11-15
- OPB · 2026-11-07
OPB reported that Panthalassa unveiled a Vancouver, Washington factory on November 6, 2026. The company described a move from custom fabrication toward an assembly-line approach; the facility is intended to make nodes and, when fully staffed, employ about 50 people. The factory opening is not evidence that Ocean-3 has launched, that serial production rates have been reached, or that the offshore compute model is commercially viable.
Full article; factory unveiling, manufacturing model, staffing and sector commercialization paragraphs. · Reviewed 2026-11-15
- Panthalassa · 2026-05-04
Panthalassa announced a $140 million Series B on May 4, 2026. It said Ocean-3 pilot nodes were planned for deployment in the northern Pacific in 2026, to demonstrate AI inference and refine manufacturing, with commercial deployments targeted for 2027. These are company financing and schedule statements, not independent confirmation of deployment or customer demand.
Company release distributed by PR Newswire; Series B and Ocean-3 plans sections. · Reviewed 2026-11-15
- NAVER Corporation · 2026-08-13
NAVER announced an investment in Panthalassa on August 13, 2026. The amount and stake were not disclosed. NAVER described Ocean-3 as planned for demonstration in 2026 and commercial deployment targeted for 2027; the release does not establish that NAVER is an Ocean-3 customer or has contracted compute capacity.
Company press release; investment announcement and Ocean-3 schedule. · Reviewed 2026-11-15
- NOAA National Data Buoy Center · 2026-11-15
NOAA station 46029 is identified as the Columbia River Bar, 20 nautical miles west of the Columbia River mouth. It is used solely as an official regional reference point for the map; NOAA does not identify it as a Panthalassa site.
Station page title and station coordinates; regional mapping reference only. · Reviewed 2026-11-15
- Federal Energy Regulatory Commission · 2026-11-15
FERC describes a licensing pathway for hydrokinetic projects and states that developers on the Outer Continental Shelf may instead seek a BOEM lease. Because Ocean-3’s exact site, grid connection and regulatory pathway are undisclosed, this is sector permitting context and does not establish any Ocean-3 authorization requirement or permit status.
Hydrokinetic Projects guidance; jurisdiction and OCS pathway. · Reviewed 2026-11-15
- Oxford Open Energy · 2026
A 2026 review characterizes wave energy as pre-commercial and discusses reliability, survivability and scale-up challenges. This sector evidence contextualizes technology risk; it is not a project-specific engineering assessment of Panthalassa.
2026 review on wave-energy technology maturity and deployment barriers. · Reviewed 2026-11-15
AI-assisted source-based research. No original interviews or site visits. The map uses NOAA NDBC Station 46029 only as a regional reference; it is not an Ocean-3 deployment location or project footprint. Broader analysis of offshore data-center proposals is reserved for a separate Spotlight article.
Company investor information & quarterly statements
Financial-disclosure review remains incomplete for one or more participants. The company-level limitations below remain unresolved; this section does not establish full corporate-disclosure verification.
Panthalassa, Inc.: Panthalassa is identified as the developer and announced Series B investors. An authoritative current ownership chain, project economics and complete public-company investor reporting/materiality review were not established.
Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →
