Nxera DC Tuas, Singapore
FJI source-qualified: four-document gate met, including project-specific government evidence. Qualification evidence and decisions →
Singtel reports that DC Tuas began operations in January 2026 and was fully contracted by its November 13 update. Its 58 MW IT specification describes facility capacity; actual utilized or energized load is not disclosed.
What the record establishes
- Evidence base
- 8 reviewed documents
- Current stage
- Operating; full contracted capacity reported
- Capacity scope
- 58 MW IT nameplate; actual use undisclosed
- Financing scope
- S$643 million five-year project loan
Primary documents
- MDDI ministerial opening address · July 25, 2025
- Nxera · DC Tuas specifications
- Singtel opening release, hosted by JTC · February 9, 2026
- Singtel project-financing announcement · February 7, 2025
- Singtel H1 FY2027 management discussion · November 13, 2026
- WSH Council · 2025 awards recipient record
- EPI · DC Tuas address record
Investment takeaway
An operating, contracted facility is further along the delivery path than an announced AI campus. The investor question shifts to billing, customer ramp-up and operating cash conversion. Contracting and nameplate IT capacity do not disclose utilization, rental yield, project profit or returns to the operator and lenders.
Project at a glance
- Location
- 7A Tuas Avenue 3, Tuas, Singapore
- Project scope
- AI-ready multi-tenant colocation and regional connectivity
- Named participants
- Nxera / Singtel; KKR platform investor; Obayashi; five-bank financing group
- Capacity boundary
- 58 MW operator-specified IT capacity; full contracted capacity is a commercial statement, not measured utilization.
- Map precision
- Singapore Land Authority OneMap address reference for 7A Tuas Avenue 3; approximate facility location, not equipment, entrance or parcel boundary.
Operation and commercial commitments
The January service commencement and February public opening are different milestones. The latest Singtel management discussion says capacity is fully contracted. That supports a stronger commercial position than a proposal, but does not show how much equipment is installed, energized or producing billable customer workloads. The ministry had acknowledged the Tuas project in July 2025; that earlier speech is not an operating permit. [1, 3, 6]
Power and cooling boundaries
Nxera lists 58 MW IT load, direct-to-chip liquid-cooling capability and racks supporting up to 50 kW. Its main specification gives a full-load PUE design figure of 1.25. These are operator specifications, not measured operating performance. The specification does not establish gross site power, and no GPU order, customer identity or actual water-consumption figure is assigned. [2]
A loan is not the project budget
Nxera DCT Pte Ltd secured a S$643 million, five-year green loan in February 2025. DBS, OCBC, Standard Chartered, HSBC and UOB are the named financing banks. The announcement identifies development and capital-expenditure uses, without individual allocations, drawdowns or a total construction cost. A green-loan label does not establish measured facility performance. [5]
Ownership and economic exposure
Singtel’s Nxera business operates the facility; KKR’s disclosed minority interest concerns the wider platform. It cannot be treated as a direct 20% interest in each building’s revenue or profit. The original WSH Council record identifies Obayashi’s DC Tuas project. Neither contractor attribution nor bank participation supplies an undisclosed contract margin or project return. [7]
Address and connectivity
The address record identifies 7A Tuas Avenue 3, distinct from the neighboring cable-landing address. Singapore Land Authority OneMap supplies the address-reference coordinates. The map does not locate equipment, the entrance or a parcel boundary. Connectivity is part of the operator’s proposition; customer traffic and associated revenue are not disclosed. [8]
What remains unverified
Customer identities and lease terms; energized and utilized phase capacity; rent commencement and facility revenue; total incurred cost, loan drawdowns and bank allocations; measured energy and water performance; current equipment-level certification.
Next evidence checkpoint
Track customer ramp-up, billed capacity, facility-level financial disclosure and measured efficiency while keeping operator and bank economics separate.
Delivery timing
January 2026 operational commencement, per the November 13 financial update; February 9 public opening. No separate phase-ramp schedule disclosed.
Related Singapore projects
- Equinix SG6, Singapore · Singapore
Sources and claim boundaries
- MDDI ministerial opening address · July 25, 2025
The ministry speech identifies Nxera’s then-upcoming Tuas facility and its advanced cooling. It is government acknowledgement, not operating approval.
Document date: 2025-07-25 · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- Nxera · DC Tuas specifications
Lists 58 MW of IT capacity, liquid-cooling capability and a full-load PUE design figure of 1.25; no utilization measurement is disclosed.
Document date: undated · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- Singtel opening release, hosted by JTC · February 9, 2026
Records the public opening and pre-opening customer commitments. JTC reproduces Singtel’s release; this is one underlying document.
Document date: 2026-02-09 · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- Data Center Dynamics · February 9, 2026
Independently reports the opening, historical construction schedule and operator-attributed capacity; it is not an engineering acceptance audit.
Document date: 2026-02-09 · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- Singtel project-financing announcement · February 7, 2025
Identifies the S$643 million five-year loan, borrower and five banks. Loan size is not total project cost or drawn capital.
Document date: 2025-02-07 · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- Singtel H1 FY2027 management discussion · November 13, 2026
Reports January operational commencement and full contracted capacity. Segment growth does not disclose this facility’s profit or energized utilization.
Document date: 2026-11-13 · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- WSH Council · 2025 awards recipient record
Page 26 identifies Obayashi Singapore’s DC Tuas project. The award record does not establish a contract value or operating permit.
Document date: 2025-12-31 · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
- EPI · DC Tuas address record
Identifies 7A Tuas Avenue 3. The certificate shown expired in September 2026 and is used here for address identity only.
Document date: undated · Reviewed November 15, 2026. Supports the described project and phase only; not independent metering or project earnings.
Map reference: Singapore Land Authority OneMap. Singapore Land Authority OneMap address reference for 7A Tuas Avenue 3; approximate facility location, not equipment, entrance or parcel boundary.
AI-assisted public-source research by Fjord Journal. No site visit, private contract inspection or independent metering. Unknown operating IT load and paid capital remain undisclosed; no whole-project certification or investment recommendation is claimed.
Company financial disclosures
These are company-wide reports for the roles identified in this profile. They do not allocate project revenue, bank lending shares, contract margins or investment returns.
- Singtel: Investor and shareholder information · H1 FY2027, ended September 30, 2026
- KKR: Investor and shareholder information · Q3 2026
- Obayashi: Investor and shareholder information · Half-year ended September 30, 2026
- DBS: Investor and shareholder information · Q3 2026
- OCBC: Investor and shareholder information · Q3 2026
- UOB: Investor and shareholder information · Q3 2026 results presentation
- Standard Chartered: Investor and shareholder information · Q3 2026
- HSBC: Investor and shareholder information · Q3 2026
Platform ownership context: Singtel’s 2026 ownership disclosure. Nxera and the separate ST Telemedia transaction are different platforms; no facility-level ownership fraction is inferred.
Related company research: KKR · Standard Chartered · HSBC ·
Company investor information & quarterly statements
Financial-disclosure review remains incomplete for one or more participants. The company-level limitations below remain unresolved; this section does not establish full corporate-disclosure verification.
Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →