Project research / Ireland / County Waterford

Echelon Kilmeaden Technology Park

Project stage Planning refusal under appeal

Investment takeaway

Echelon’s proposed campus pairs three data centre buildings with on-site generation and a grid connection. Waterford’s October 15 planning refusal puts both the power plan and the proposed wastewater arrangements before Ireland’s national planning commission. The appeal is the next decision that can materially change the project’s prospects.

Research snapshot
Location
Kilmeaden, County Waterford, Ireland
Development
Three proposed data centre buildings of approximately 24,000 m² each
Power design
Approximately 203 MW of proposed electrical generation at 10°C, with a proposed 220 kV grid connection. IT capacity is unverified.
Applicants
Crag Rathnew DC Limited and Kent Homes Limited
Next milestone
Appeal PL93.502469 targets a decision on March 25, 2027
Profile reviewed
November 21, 2026

FJI source-qualified: four-document gate met, including project-specific government evidence. Qualification evidence and decisions →

FJ Intelligence · Compare this project · Track milestones · Read the Spotlight article

What the sources establish

Who's involved

Crag Rathnew DC Limited and Kent Homes Limited are the named applicants and appellants. The project website identifies Echelon Data Centres as the intended technology park developer and operator. Kilmeaden Village project disclosure

Milestones that would change the assessment

MilestoneEvidence to watch
Planning appealDecision and conditions, with particular attention to grid capacity, renewables, wastewater and flood risk.
Utility deliverySite-specific grid import terms, a dated energisation plan and a viable wastewater arrangement.
Commercial commitmentsFinanced construction, committed tenants and contracted heat demand.

What remains unknown

Deliverable IT capacity, financing, customer commitments and a construction or energisation date remain unverified.

Sources

  1. An Coimisiún Pleanála

    Lists the appellants, application 2560625 and March 25 target decision date.

  2. AWN Consulting environmental assessment

    Proposed turbine output, solar, 220 kV connection and village heat-recovery design.

  3. RTÉ

    Reports the county refusal, approximate building sizes and community objections.

  4. The Irish Times

    Reports council findings on grid capacity, wastewater, flood risk and village character.

  5. Kilmeaden Village

    Identifies Echelon as the proposed developer and operator.

  6. RTÉ

    Reports developers’ position on the appeal.

  7. Commission for Regulation of Utilities

    National policy context only. No grant of connection to Kilmeaden.

By · AI-assisted reporting and analysis

Company investor information & quarterly statements

Financial-disclosure review remains incomplete for one or more participants. The company-level limitations below remain unresolved; this section does not establish full corporate-disclosure verification.

Crag Rathnew DC / Kent Homes

The two entities are named in planning appeal 502469 for the Kilmeaden proposal.

The full ownership chain and project-level financing remain unverified.

Supporting document

Echelon Data Centres / Starwood Capital

A Starwood Capital affiliate disclosed an approximately US$850 million investment in the Echelon platform in 2024.

Platform funding has a wider scope than the Kilmeaden development. The project’s allocation remains undisclosed.

Supporting document

Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →