Project directory / Germany
Marvin Supercomputer, Bonn
Operating university HPC and AI system
Marvin is operating research infrastructure at the University of Bonn. The university says testing exceeded Megware’s performance promise, but a cooling failure delayed wider access until March 2024.
Published and evidence reviewed November 9, 2026.
Compare this project · Evidence checkpoints · FJ Intelligence
Investment takeaway
Marvin separates two questions investors should ask of any compute project: how fast can it run, and how much useful work does it reliably deliver? University records say performance exceeded the vendor promise, while also documenting a cooling interruption before broad user access.
Project at a glance
- Location
- Bonn, North Rhine-Westphalia, Germany
- Status
- Operating university HPC and AI system
- Capacity scope
- Documented A100 and A40 GPU partitions; TOP500 measured 2.18-petaflop HPL for the scalable GPU partition in June 2024. This is not whole-campus annual output.
- Named participants
- University of Bonn; MEGWARE; NVIDIA; AMD; Intel
- Map precision
- Approximate city/locality marker, not a surveyed facility, building or parcel.
FJI source-qualified: four-document gate met, including project-specific government evidence. Qualification evidence and decisions →
Procurement and technology
A reproduced public procurement notice identifies a modular university HPC system and MEGWARE as the awardee. University documentation identifies CPU, scalable GPU and machine-learning partitions. TOP500 separately records the scalable GPU partition; it is not a measurement of the whole installation’s power or annual output. [1, 2, 3]
What exceeded the promise
In February 2024, the university said early testing showed performance higher than previously promised by MEGWARE. It did not disclose the numerical promise or a comparable annual output series. This is an operator statement of a performance beat, without a quantified percentage. [4]
Why the operating timeline matters
The university reported a cooling-system failure in late November 2023 that restricted testing. The subsequent opening notice set broad user access for March 11, 2024. Technical performance and readiness for regular service were separate milestones. The record does not establish supplier fault or contractual liability for the cooling event. [4, 5]
An operating system today
The university’s current system page describes Marvin as available to its researchers and partners. Its AI capability includes A100 and A40 GPU nodes. A 2023 inauguration headline should be read alongside the later testing interruption and opening notice, rather than treated as proof of uninterrupted service from inauguration. [2, 4]
Financial interpretation
Marvin is university research infrastructure, not a disclosed merchant compute business. Faster runs can improve research capacity; no reviewed source establishes additional supplier earnings or project cash return. A production comparison must include lost service time and avoid substituting a partition benchmark for total useful work.
What remains unverified
The numerical original vendor promise and matched actual production series are not public in reviewed sources. Cooling-failure cause, vendor liability, project returns and annual output above forecast are not established.
Next evidence checkpoint
Recover the original performance promise and acceptance record, then compare sustained useful output and service availability on the same basis.
Related project research
- LUMI Supercomputer, Kajaani
- YTL AI Cloud, Johor
- Frontera Supercomputer, TACC
- BURA Supercomputer, Rijeka
Sources and claim boundaries
- EU procurement notice 2022/S 197-559187, reproduced by OpenProcurements
Accessible reproduction of the university public-procurement award notice; direct TED text retrieval was unavailable. Used for procurement context, not independent validation of output.
Award details; original notice identifier · Document date: 2022-10-12 · Read November 9, 2026.
- University of Bonn HPC
Current access and partition hardware descriptions.
Article body · Document date: Not established · Read November 9, 2026.
- TOP500
Scalable GPU partition benchmark record, including June 2024 2.18-petaflop measured HPL.
Article body · Document date: Not established · Read November 9, 2026.
- University of Bonn HPC
Operator says early performance exceeded the vendor promise; planned broad access date.
Article body · Document date: 2024-02-09 · Read November 9, 2026.
- University of Bonn IT
Cooling failure, limited testing and delayed service.
Article body · Document date: 2023-12-13 · Read November 9, 2026.
- Data Center Dynamics
Independent account of delivery and system supplier; expected opening is historical, not proof of service.
Article body · Document date: 2023-07-12 · Read November 9, 2026.
AI-assisted public-source research by Fjord Journal. No site visit, private contract review or independent metering. Institutional, supplier and benchmark claims retain their stated scope.
Company investor information & quarterly statements
Financial-disclosure review remains incomplete for one or more participants. The company-level limitations below remain unresolved; this section does not establish full corporate-disclosure verification.
Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →