United States · Florida · FJ Intelligence Project Research

Metrobloks Miami MIA A1 / Project Apollo

Planned AI-ready colocation project in western Miami-Dade; land acquisition and conditional incentives documented, construction and service commencement unverified.

Project stage Proposed / development

FJ Intelligence Evidence

What the record establishes

Evidence base
6 reviewed documents
Current stage
Proposed / development
Planned critical IT
15.8 MW · developer specification
Conditional county incentive
Up to $3.634 million

Investment takeaway

The investment case is a smaller Miami colocation facility targeting low-latency computing, rather than a verified hyperscale training campus. Land control and a conditional public incentive establish development commitments; value realization still depends on permits, construction, energized infrastructure and paying customers.

Project at a glance

Location
500 NW 137th Avenue, unincorporated Miami-Dade County, Florida 33182
Project scope
Multi-tenant colocation targeting high-density AI workloads and local inference
Named participants
Metrobloks (developer); MB Sweetwater Site LLC (county plat applicant/owner)
Capacity boundary
15.8 MW planned critical IT per current developer specification; 15.2 MW in the 2025 announcement and 15 MW in the county proposal. Separately claimed 22 MW utility supply is not IT load.
Map precision
Approximate Census address-range geocode for 500 NW 137th Avenue, checked November 17, 2026; street reference, not a surveyed building centroid.

FJI source-qualified: four-document gate met, including project-specific government evidence. Qualification evidence and decisions →

The project and its location

Metrobloks acquired a small industrial site in western Miami-Dade for a multi-tenant data center. Its announcement targets local AI inference; the current design includes air, liquid or hybrid cooling. The county plat identifies the owner and parcels, anchoring the facility to a specific site rather than a Miami-wide connectivity claim.

Public incentives depend on delivery

Miami-Dade adopted the Project Apollo TJIF award in December 2024. Payments are conditional on program compliance and annual appropriations, with verification of investment, jobs and taxes. The $150 million investment and 27 jobs are project commitments; neither completed expenditure nor realized employment has been verified.

Three capacity figures, different dates

The county’s 2024 proposal described 15 MW critical IT. Metrobloks announced 15.2 MW in March 2025, while its current site page lists 15.8 MW. We retain the dates and source attribution; no independently verified capacity expansion is inferred. The separate 22 MW FPL utility-supply claim is not operating IT capacity.

Construction and delivery remain open

NBC6’s October 26 investigation identified Metrobloks behind Project Apollo and reported no visible construction during its September visit. That observation is historical. The developer’s current coming-soon label does not establish a start, a delay duration or service acceptance; the old end-2026 forecast is not treated as a confirmed opening.

Building size needs a consistent boundary

The incentive proposal describes 75,000 square feet; the later tentative-plat application lists 113,704 square feet of proposed industrial/warehouse use; Metrobloks separately lists 40,500 square feet of whitespace. These figures describe different documents and potentially different area definitions. They are not added together or presented as a verified expansion.

Company exposure and financial evidence

Metrobloks is the named private developer. The county plat names MB Sweetwater Site LLC, while the acquisition release names MB Sweetwater Partners LLC as an investment vehicle; these are retained as distinct legal names. No publicly traded equipment supplier, customer or utility revenue is assigned. Corporate verification remains held pending the ownership chain and appropriate financial disclosure evidence.

What remains unverified

Current construction progress, final permits, executed utility service terms, customer leases, financing close, paid capital and commissioned IT capacity remain unverified. A complete ownership and private-company financial-disclosure review is outstanding.

Next evidence checkpoint

Seek a dated construction/permit update, inspect the claimed FPL will-serve terms and identify customer commissioning. Verify incentive compliance and any payments separately.

Delivery timing

April 2025 adviser announcement targeted end-2026 operations; current developer page says coming soon. No verified current delivery date.

Related Florida Projects

Equinix MI6 in the Miami metro · Project Tango in Palm Beach County

Sources and claim boundaries

  1. Miami-Dade County — Resolution R-1055-24

    Adopted December 3, 2024: up to $3,633,902 in conditional TJIF incentives, scheduled across fiscal years 2029–30 through 2038–39. The underlying proposal specifies $150 million investment, 27 jobs, 15 MW critical IT and 75,000 square feet. These are commitments and projections, not verified spending, employment or operating output.

    Document date: 2024-12-03 · Reviewed November 17, 2026. Adopted December 3, 2024: up to $3,633,902 in conditional TJIF incentives, scheduled across fiscal years 2029–30 through 2038–39. The underlying proposal specifies $150 million investment, 27 jobs, 15 MW critical IT and 75,000 square feet. These are commitments and projections, not verified spending, employment or operating output.

  2. Metrobloks — MIA A1 site specifications

    The current site page identifies 500 NW 137th Avenue and describes MIA A1 as coming soon. It lists 15.8 MW critical IT, a 4.1-acre campus and hybrid cooling. The developer separately claims 22 MW secured utility supply from FPL; the underlying will-serve letter and deposits were not inspected.

    Document date: undated · Reviewed November 17, 2026. The current site page identifies 500 NW 137th Avenue and describes MIA A1 as coming soon. It lists 15.8 MW critical IT, a 4.1-acre campus and hybrid cooling. The developer separately claims 22 MW secured utility supply from FPL; the underlying will-serve letter and deposits were not inspected.

  3. Metrobloks — land acquisition announcement

    The March 31, 2025 announcement confirms acquisition of 4.05 acres for a planned 15.2 MW multi-tenant AI-ready facility. It describes local AI inference as a target market and identifies MB Sweetwater Partners LLC as its acquisition investment vehicle. This dated capacity differs from the current site specification.

    Document date: 2025-03-31 · Reviewed November 17, 2026. The March 31, 2025 announcement confirms acquisition of 4.05 acres for a planned 15.2 MW multi-tenant AI-ready facility. It describes local AI inference as a target market and identifies MB Sweetwater Partners LLC as its acquisition investment vehicle. This dated capacity differs from the current site specification.

  4. NBC6 — Project Apollo investigation

    NBC6 linked Confidential Project Apollo to Metrobloks through a county application. Its September site visit found no visible construction; the October 26 report said the developer had not answered questions about the updated timeline. That historical observation does not establish November construction status.

    Document date: 2026-10-26 · Reviewed November 17, 2026. NBC6 linked Confidential Project Apollo to Metrobloks through a county application. Its September site visit found no visible construction; the October 26 report said the developer had not answered questions about the updated timeline. That historical observation does not establish November construction status.

  5. Miami-Dade County — Metrobloks tentative plat

    The tentative-plat application identifies MB Sweetwater Site LLC, four parcel folios and the NW 137th Avenue/NW 6th Street site. It lists 113,704 square feet as industrial/warehouse proposed use. That application area is not automatically comparable to the earlier 75,000-square-foot incentive proposal or the developer’s whitespace.

    Document date: undated · Reviewed November 17, 2026. The tentative-plat application identifies MB Sweetwater Site LLC, four parcel folios and the NW 137th Avenue/NW 6th Street site. It lists 113,704 square feet as industrial/warehouse proposed use. That application area is not automatically comparable to the earlier 75,000-square-foot incentive proposal or the developer’s whitespace.

  6. Cushman & Wakefield — acquisition adviser

    The transaction adviser confirms the 4.05-acre acquisition from Sagard Real Estate and a planned 15.2 MW facility. Its April 2025 end-2026 operating target is retained as a historical forecast; no commissioning or current delivery date is established.

    Document date: 2025-04-02 · Reviewed November 17, 2026. The transaction adviser confirms the 4.05-acre acquisition from Sagard Real Estate and a planned 15.2 MW facility. Its April 2025 end-2026 operating target is retained as a historical forecast; no commissioning or current delivery date is established.

Map reference: U.S. Census address geocoder. Approximate Census address-range geocode for 500 NW 137th Avenue, checked November 17, 2026; street reference, not a surveyed building centroid.

AI-assisted public-source research by Fjord Journal. No site visit, private contract inspection or independent metering. Unknown operating IT load and paid capital remain undisclosed; no whole-project certification or investment recommendation is claimed.

Company investor information & quarterly statements

Financial-disclosure review remains incomplete for one or more participants. The company-level limitations below remain unresolved; this section does not establish full corporate-disclosure verification.

Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →