FJ Intelligence · Infrastructure monitor

Follow AI investment.
Measure what gets built.

Track the projects behind the AI buildout—from announced plans to construction and operating infrastructure. Explore the evidence, the company exposure and the next delivery checkpoint.

The buildout at a glance

Where our tracked projects stand

206Tracked projects
24Countries
128FJI source-qualified
78Qualification pending

Source qualification is being reconciled

128 of 206 tracked projects currently have accepted qualification records; 78 remain pending or held. Each qualified project requires at least four distinct, relevant, accessible documents, including a project-specific government source, primary evidence and independent reporting.

The earlier “200 scoped reviews” count recorded bounded review activity. It did not establish that every project met the full source gate. We are correcting that distinction and reviewing the supporting evidence. Pending projects remain visible as coverage records; they are excluded from qualified-cohort research. Source qualification alone is not full FJI certification: official investor/shareholder and quarterly financial-statement links for confirmed involved public companies are required. 77 projects currently pass both audited gates. Remaining holds and private-disclosure exceptions are explicit in the corporate disclosure ledger.

Inspect qualification decisions and source references →

Project stages

Select a stage to explore its records.

Regional coverage

North America168
Europe23
Asia8
South America5
Oceania2

Coverage reflects our research inventory, not the size or share of the global market.

Stage counts classify project records. “Operating” does not establish verified IT megawatts or full-campus completion. Capacity, spending and revenue are not aggregated until their evidence is comparable. How we measure →

FJ Insights · Research and analysis

What the project data tells investors

Published research and descriptive inventory counts. Full-inventory findings remain subject to the qualification audit below.

47%

Nearly half of our development pipeline is still before construction

48 of 102 tracked development-stage projects are proposed, announced, approved or permitted; 54 are under construction.

Descriptive inventory snapshot · Includes qualification-pending records. Project counts, not capacity or investment totals. Excludes operating classifications and existing facilities with unverified readiness. This is a coverage finding, not a change over time.

Inspect the stage breakdown ↑

Three-project comparison · 2026-10-16

The Capital Test for AI: Saline, Abilene and El Paso

Saline’s $16 billion financing closed in April; Oracle targets first customer delivery from the second half of 2027.

Why it matters. Financing and customer delivery occur at different points. The terms governing that interval determine who carries the risk.

Saline, Abilene and El Paso · Sources reviewed October 16, 2026. Three cases, not a market-wide trend; financing close does not establish cash deployed.

Read the analysis →

Explore the Evidence

Saline · Abilene · El Paso

Two-project comparison · 2026-10-16

AWS and Google: Two Delivery Gates in South America

Huechuraba has an environmental approval upheld by the court. Canelones has dated government-observed construction.

Why it matters. Approval and construction put the projects at different checkpoints before power delivery and operating acceptance.

Chile and Uruguay · Sources reviewed October 16, 2026. Current operating IT load and paid site expenditure remain unverified.

Read the analysis →

Explore the Evidence

Huechuraba · Canelones

More project findings and source notes
Saline: financing closed; customer delivery remains ahead

Saline Township · public-source review

What the record establishes—and what it does not

Established in the checked source set: the project is under construction; transaction counsel reported the USD 16 billion financing closed April 30, 2026; actual draws and spending remain unverified; MPSC conditionally approved a 1,383 MW maximum utility load and later approved an initial 332 MW storage tranche; Oracle reports construction progress and targets first customer delivery from 2H 2027.

Not established: actual financing drawdowns, permit conditions and compliance from direct primary files, court disposition, phase energization, customer acceptance, current IT load, utilization or project revenue. The 332 MW storage measure is not campus capacity and is excluded from totals.

Next checkpoints: primary permit and township records; verified funding flows; appeal disposition; phase-specific utility energization and acceptance; Oracle service commencement.

Sources: MPSC utility order summary · Kirkland close confirmation · Gibson Dunn close confirmation · MPSC emergency-load rule · MPSC storage approval · Related financing terms · Oracle construction update · Permit reporting. FJI project record. This review is a complete public-source pass over available material, not a whole-project certification.

AWS Susquehanna: a new contractual checkpoint

A contract transition is not an operating-load measurement

Talen’s later quarterly filing reports that the revised AWS power agreement transitioned in April 2026. The older annual forecast is retained as history, not treated as the latest actual.

Evidence and scope · One existing project and its regional contract; 2025 annual forecast versus Q2 2026 disclosed checkpoint. Reviewed October 16, 2026. This is a single-case observation, not a market trend.

Investor read-through · Our analysis: The disclosed contractual checkpoint is relevant to Talen’s supplier role and AWS’s input-power arrangements; no additional operating IT MW, site revenue or paid capital is established.

Uncertainty: Current delivered regional quantity, campus allocation, completed transmission configuration, customer acceptance and utilization remain unavailable.

Next checkpoint: Utility/project evidence for completed transmission configuration, actual deliveries and phase-specific customer acceptance.

Source basis and comparison limits

Transition beginning/full physical-transition forecasts and the later contractual milestone may have different scopes. No numeric schedule variance is calculated. This observation is not a market-wide trend.

Susquehanna project and dated checkpoints → · Amazon company context →

More from the research desk

Construction does not establish customer-ready compute

Delivery · one-project case study

Construction does not establish customer-ready compute

Nebius targets first customer capacity in 2027. Municipal and independent reporting describe the operator, developer and building work; current evidence still does not establish accepted or utilized compute.

Investor read-through Track phase-specific commissioning and customer service acceptance before treating construction progress as recurring revenue.

Scoped review: October 13, 2026 · case study, not a portfolio trend
Sources, scope and next checkpoints

First verified workflow cycle · October 13, 2026

We checked Nebius Lappeenranta’s operator identity against company disclosure, the municipal announcement and independent Yle reporting. The structured NBIS role now has claim-specific evidence, a scoped review date and a preserved previous record. This was a directly executed cycle; unattended scheduled execution is not yet demonstrated.

Construction evidence does not establish delivered compute · Our analysis

Nebius’s March disclosure targets first customer capacity in 2027. The city identifies Nebius as operator and Polarnode as developer. Yle’s August reporting describes building work beginning in July and attributes an early-2027 first-building estimate to the contractor. These are different milestones. Our finding is that the construction evidence does not, by itself, establish installed, accepted or utilized compute.

For investors, building completion, equipment installation and customer acceptance remain separate checkpoints before site-specific operating revenue can be assessed. This is a one-project case study, not a portfolio trend or stock recommendation. It does not establish current delivered MW, a revised schedule, site earnings or the full permit position.

Next evidence to seek: a dated phase-specific commissioning record, defined power basis and customer service acceptance. Project research · Nebius · Municipality · Yle.

Grid commitments are not campus IT capacity

Power · one-project case study

Grid commitments are not campus IT capacity

Google’s Pine Island wind, solar and storage announcements concern grid resources. They do not establish campus IT load, commissioning, or site-specific payments; Alphabet’s filing does not allocate company-wide investment to this campus.

Investor read-through Separate generation, grid delivery and data-center load. Look for regulator decisions, commissioning and campus-level economics.

Scoped review: October 14, 2026 · case study, not a portfolio trend
Sources, scope and next checkpoints

Grid commitments are not delivered campus capacity · Our analysis

Google Pine Island scoped evidence pass reviewed 2026-10-14. This is a single-project case, not a market trend.

Google announced 1,400 MW of wind, 200 MW of solar, 300 MW / 30 GWh of long-duration storage and a separate $50 million contribution to Xcel’s Capacity*Connect program. These commitments describe grid resources or a systemwide program; campus IT MW, commissioning, and actual payments remain unverified. Alphabet’s latest reviewed quarterly filing reports company-wide infrastructure investment but does not identify Pine Island or allocate capex to the site.

FJI question: At each dated checkpoint, what was committed to deliver, by when, and what was actually delivered or paid? Track the PUC decision and the commissioning of each energy component before drawing conclusions about project capacity or company economics.

Sources: Google · Xcel Energy · Minnesota PUC · Alphabet Q2 2026 Form 10-Q. Project record.

Secured financing is not proof of capital deployed

Capital · issuer-attributed milestone

Secured financing is not proof of capital deployed

AirTrunk reported US$2.325 billion in green financing for JHB2. The record supports secured financing; drawdown, deployment, site spending and commissioned capacity remain unverified.

Investor read-through Keep financing, cash drawn, construction spending and operating assets as separate checkpoints.

Announcement: July 29, 2026 · scoped check: 2026-10-14
Billing, cooling tests and public allocations measure different things

Realized demand · three-record cohort

Billing, cooling tests and public allocations measure different things

Denton billing, ODATA QR03 launch and cooling evidence, and Nebius Modiin’s government-confirmed service and voucher allocation describe different stages. They are not comparable utilization measures.

Investor read-through Follow cash collection, customer commissioning, actual usage and disbursement separately before comparing demand.

Three-record cohort · reviewed October 13, 2026 · no comparable utilization total
Sources, scope and next checkpoints

From infrastructure to realized demand · Our analysis

Three-record research cohort reviewed 2026-10-13. Dated evidence, not events newly occurring today.

ProjectEvidence boundary
Core Scientific DentonIssuer reports approximately 260 MW billing at mid-July 2026; not current metered IT draw.
ODATA QR03Launch module, building IT, grid energization and September cooling testing have separate scopes.
Nebius / Mega DC Modi’in — Israel national AI computingGovernment-confirmed computing service and voucher allocation; actual usage and disbursement unverified.

These are different stages of the bridge from infrastructure readiness to realized commercial demand, not comparable utilization measures.

Next tests: Current site billing and cash collection; QR03-specific cooling acceptance and customer commissioning; Modiin voucher awards/usage and actual disbursement. No cross-project MW or capital total is calculated. Persistence remains unassessed.

Bergheim: land monetization precedes service delivery

Bergheim: land monetization precedes service delivery · Our analysis

Scoped evidence reviewed October 14, 2026. One new campus, two checked company roles and two excluded contextual measurements. This is a project case, not a market-wide conclusion.

The RWE annual report records the land transaction. The March 2026 company announcement establishes construction initiation. The subsequent state application concerns backup equipment. These separate checkpoints demonstrate why a building permit, a generator application and customer acceptance must remain different fields in a delivery model.

Research implication: Test whether industrial-land transactions precede recurring cloud-service economics across additional projects. Do not infer a delay or utility revenue from this case. Operating IT MW, commissioning and campus spending remain unknown.

Project and five source documents → · Deutsch → · Inspect the FJI record → · Read the Spotlight analysis →

Explore the underlying data

Find a project. Follow its evidence.

Search the full inventory or filter by country and readiness. Expand a record for sources, company roles and open questions.

206 tracked records

Stargate Abilene · United States · Operating

Buckeye Technology Park · United States · Proposed / development

Microsoft Fairwater · United States · Operating

Meta Hyperion · United States · Proposed / development

AWS Susquehanna campus · United States · Proposed / development

Meta Sturgeon County · Canada · Under construction

STAK Energy Campus · United States · Proposed / development

Google The Dalles · United States · Operating

Switch Citadel · United States · Operating

Meta Eagle Mountain · United States · Operating

Meta Stanton Springs · United States · Operating

Equinix SV11 · United States · Existing facility / readiness unverified

Empire AI Beta · United States · Operating

Equinix MI6 · United States · Existing facility / readiness unverified

Equinix TR6 · Canada · Existing facility / readiness unverified

Compass Hoffman Estates campus · United States · Proposed / development

DataBank SNA2 expansion · United States · Operating

Vantage Ashburn II (VA2) · United States · Existing facility / readiness unverified

Edged Aurora expansion · United States · Under construction

Vantage Santa Clara III (CA3) · United States · Operating

Compass Loudoun County campus · United States · Existing facility / readiness unverified

Digital Realty ACC6 · United States · Existing facility / readiness unverified

CyrusOne Aurora campus · United States · Under construction

Digital Realty EWR12 · United States · Existing facility / readiness unverified

Compass Etobicoke campus · Canada · Proposed / development

Digital Realty YYZ10 · Canada · Existing facility / readiness unverified

QTS New Albany 1 · United States · Existing facility / readiness unverified

DataBank LGA3 · United States · Operating

QTS Richmond 5 expansion · United States · Proposed / development

Meta Rosemount · United States · Proposed / development

DataBank Red Oak campus · United States · Proposed / development

CyrusOne Allen campus · United States · Operating

Sabey SDC Seattle expansion · United States · Operating

DataBank SEA2 · United States · Existing facility / readiness unverified

DataBank BOS1 · United States · Existing facility / readiness unverified

AWS Mexico (Central) · Mexico · Operating

Microsoft Mexico Central · Mexico · Operating

Google Cloud Querétaro · Mexico · Operating

ODATA QR01 · Mexico · Operating

ODATA QR02 · Mexico · Existing facility / readiness unverified

ODATA QR03 · Mexico · Operating

Equinix MX1 · Mexico · Existing facility / readiness unverified

Equinix MX2 · Mexico · Existing facility / readiness unverified

Equinix MO1 · Mexico · Existing facility / readiness unverified

Ascenty Querétaro 1 · Mexico · Existing facility / readiness unverified

Vantage Quebec City (QC2) · Canada · Operating

Vantage Montreal II (QC4) · Canada · Existing facility / readiness unverified

Equinix MT2 · Canada · Existing facility / readiness unverified

Equinix CL1 · Canada · Existing facility / readiness unverified

Equinix VA1 · Canada · Existing facility / readiness unverified

Google Council Bluffs · United States · Operating

Google Papillion · United States · Operating

Meta DeKalb · United States · Operating

AWS New Carlisle / Project Rainier · United States · Operating

Google Pine Island · United States · Proposed / development

Meta El Paso · United States · Under construction

Vantage Frontier · United States · Under construction

Vantage Lighthouse · United States · Proposed / development

AWS Richmond County · United States · Proposed / development

Microsoft Fairwater Atlanta · United States · Operating

Project Jupiter · United States · Under construction

Stargate Michigan / The Barn · United States · Under construction

AWS Madison County · United States · Under construction

Meta Kansas City · United States · Operating

Google Berkeley County · United States · Operating

QScale Q01 · Canada · Operating (HPE AI Cloud deployment documented)

Vantage Montreal I / QC1 · Canada · Existing facility / readiness unverified

Microsoft Donnacona · Canada · Under construction

Microsoft L’Ancienne-Lorette · Canada · Under construction

Colossus Memphis — SpaceXAI / xAI · United States · Operating

Google Pryor / Mayes County · United States · Operating

Google West Memphis · United States · Proposed / development

Meta Cheyenne · United States · Under construction

Meta Kuna · United States · Operating

Meta Aiken · United States · Under construction

Meta Mesa · United States · Operating

Meta Los Lunas · United States · Existing facility / readiness unverified

Google Midlothian · United States · Operating

Stargate Lordstown · United States · Under construction

CoreWeave Lancaster · United States · Proposed / development

Kangerlussuaq Arctic AI proposal · Greenland · Proposed / development

Tusass Qinngorput · Greenland · Under construction

Equinix WI1 · Canada · Existing facility / readiness unverified

Equinix KA1 · Canada · Existing facility / readiness unverified

Equinix SJ1 · Canada · Existing facility / readiness unverified

Equinix OT1 · Canada · Existing facility / readiness unverified

KIO HER1 · Mexico · Existing facility / readiness unverified

KIO MER1 · Mexico · Existing facility / readiness unverified

Google Lenoir · United States · Operating

Google Montgomery County / Clarksville · United States · Operating

Google Douglas County · United States · Operating

Google Henderson · United States · Existing facility / readiness unverified

Google New Albany · United States · Existing facility / readiness unverified

Meta Huntsville · United States · Existing facility / readiness unverified

Meta Montgomery · United States · Proposed / development

Meta Forest City · United States · Operating

Meta Prineville · United States · Operating

Meta Fort Worth · United States · Operating

Meta Lebanon · United States · Proposed / development

Meta Bowling Green · United States · Proposed / development

Applied Digital Polaris Forge 1 · United States · Operating

Applied Digital Polaris Forge 2 · United States · Under construction

IREN Childress / Horizon · United States · Operating

IREN Prince George · Canada · Existing facility / readiness unverified

Core Scientific Denton · United States · Operating

Core Scientific Muskogee · United States · Under construction

Meta Altoona · United States · Operating

Meta Gallatin · United States · Operating

Google Lincoln · United States · Operating

Digital Realty PDX12 · United States · Existing facility / readiness unverified

Meta Temple · United States · Operating

Meta Sarpy · United States · Operating

Meta Henrico · United States · Operating

Meta Jeffersonville · United States · Under construction

Google Jackson County · United States · Operating

Google Loudoun County · United States · Operating

Google Mesa · United States · Operating

Vantage Phoenix / AZ1 · United States · Existing facility / readiness unverified

Vantage Quincy / WA1 · United States · Operating

Equinix DC21 · United States · Operating

Equinix CH4 · United States · Existing facility / readiness unverified

Equinix DA11 · United States · Existing facility / readiness unverified

Equinix TR7 · Canada · Existing facility / readiness unverified

Sabey SDC Quincy · United States · Existing facility / readiness unverified

CyrusOne Chandler / PHX1–PHX8 · United States · Existing facility / readiness unverified

Mistral AI Bruyères-le-Châtel · France · Under construction

Data4 Escaudain / Les Soufflantes · France · Proposed / development

QTS Calatorao / Project Rhodes · Spain · Proposed / development

Start Campus Sines / SIN01 and expansion · Portugal · Operating

Nscale Narvik / Kvandal · Norway · Under construction

AWS Warren County / Vicksburg · United States · Proposed / development

AWS / STACK Northwest Louisiana · United States · Under construction

Compass Meridian, Mississippi · United States · Under construction

AVAIO Digital Taurus, Brandon, Mississippi · United States · Under construction

AWS Falls Township / Keystone Trade Center, Pennsylvania · United States · Under construction

Bell AI Fabric Hillside / TRU · Canada · Under construction

Bell AI Fabric Sherwood · Canada · Under construction

Kao Data Harlow AI campus / KLON-03 · United Kingdom · Under construction

VIRTUS Marienpark / BERLIN1 campus · Germany · Under construction

Data4 Frankfurt-Hanau / Großauheim campus · Germany · Under construction

Meta Beaver Dam · United States · Under construction

Google Dorchester County campuses · United States · Under construction

AWS Louisa IAD-550 campus · United States · Approved / pre-construction

Google Fort Wayne / Project Zodiac · United States · Operating

Meta Davenport / Vemerald · United States · Approved / pre-construction

Microsoft Villamayor de Gállego campus · Spain · Approved / pre-construction

Google Waltham Cross · United Kingdom · Operating

Goodman TYO05 Tsukuba · Japan · Under construction

AirTrunk JHB2 · Malaysia · Approved / pre-construction

Goodman Project Pluto · Australia · Approved / pre-construction

QTS Fayetteville / Project Excalibur · United States · Under construction

Edged Project Atlas, South Whitehall · United States · Proposed / development

Stonebridge Fort Meade / Project Cumulus · United States · Proposed / development

Project Swan, Lakeland · United States · Proposed / development

Central Park Commerce Center / Project Tango · United States · Proposed / development

HostDime SuperNova, Eatonville · United States · Under construction

University of Florida East Campus / HiPerGator · United States · Operating

Global AI Weld / former Kodak campus · United States · Approved / pre-construction

RAEDEN Project Taurus · United States · Proposed / development

Beale Project Blue / South Houghton campus · United States · Under construction

Beale Luckett Road North / South · United States · Approved / pre-construction

Gemini / Sioux Falls Technology Park · United States · Approved / pre-construction

Intel Mission Campus / Santa Clara enterprise data centers · United States · Operating

Nebius / Mega DC Modi’in — Israel national AI computing · Israel · Operating

Flexential Parker / Compark · United States · Under construction

CoreSite DE3 / Race Street campus · United States · Under construction

QTS Aurora–Denver DEN1 · United States · Under construction

DataBank Centennial Campus / DEN5 · United States · Operating

CleanArc VA1 / Caroline County · United States · Under construction

Google Wilbarger County / Project Rise · United States · Under construction

Blockfusion / CoreWeave Niagara Falls · United States · Proposed / development

Stream STAMP / Project Double Reed · United States · Proposed / development

NCCS / NYDIG Massena AI conversion · United States · Proposed / development

H5 Buffalo I & II / former Yahoo Lockport · United States · Operating / delivered

JPMorgan Chase Orangeburg / Datacenter II · United States · Under construction

Dakota State Applied Research Lab, Sioux Falls · United States · Operating / delivered

QTS Phoenix 3 / PHX3, Glendale · United States · Permitted / development

Nebius Lappeenranta AI factory · Finland · Under construction

Google Visakhapatnam AI hub · India · Under construction

Microsoft India South Central / Hyderabad · India · Operating

Reliance–Meta Jamnagar AI data center · India · Proposed / development

SK–AWS Ulsan AI Zone · South Korea · Under construction

Nebius Independence AI factory · United States · Under construction

ByteDance / Omnia Pecém · Brazil · Under construction

Voltalia Pecém Data Center · Brazil · Announced

Scala AI City — Eldorado do Sul · Brazil · Announced

Nebius / Azur Béthune AI data center · France · Under construction

TSMC Arizona semiconductor manufacturing campus · United States · Operating

HyperDC MBL1 Moorabool · Australia · Proposed / development

Microsoft Bergheim / Paffendorf AI campus · Germany · Under construction

AWS Huechuraba Data Center · Chile · Proposed / development

Google Canelones Data Center / Proyecto Teros · Uruguay · Under construction

Microsoft Espoo / Hepokorpi campus · Finland · Under construction

Microsoft Kirkkonummi / Kolabacken campus · Finland · Under construction

Microsoft Vihti / Huhmari campus · Finland · Under construction

Google Hamina / Summa campus · Finland · Operating

Google Skien / Gromstul campus · Norway · Under construction

Google Winschoten / Hoogebrug campus · Netherlands · Operating

Meta Talavera de la Reina / Torrehierro campus · Spain · Permitted / development

QTS Cambois / Blyth AI campus · United Kingdom · Under construction

DeepGreen Western Passage subsea-compute proposal · United States · Proposed / development

Verne Keflavík VDC04 expansion · Iceland · Approved / pre-construction

Beyond.pl Poznań AI Factory / F.I.N. · Poland · Operating

Related Digital Cheyenne · United States · Under construction

Visionbay Xiaogang–Linhai AI Data Center — Phase One · Taiwan · Proposed / development

Prometheus Hyperscale Evanston Data Center Campus · United States · Approved / pre-construction

FJ Intelligence · quarterly research in development

From project records to an investor readthrough.

Future quarterly reports will track how announced projects convert through permits, financing, construction, power delivery and customer-ready capacity—and what the dated evidence supports about capital and company exposure.

DeliveryPlans, phase milestones and verified actuals
Power & capitalInterconnection, funding status and the next constraint
Company ExposureDocumented roles with source and scope limits

Quarterly subscription reports and structured-data licensing are in development and are not currently offered. Each published finding will retain its sources, cohort basis and limitations.

Behind the research

Sources, methods and audit trail

Inspect how the records were assembled, what remains unverified and how the research has changed.

Research standards and measurement limits

Research standards and methods

History starts with this baseline. A time series requires later comparable snapshots; changes in coverage must remain separate from changes in projects.

Each record retains source references and original review dates. The relational archive preserves project, company, source, claim, role and measurement entities. Read our methodology and verification standard.

FJ Intelligence is the foundation for deeper subscription research and licensed data products. This first public monitor supports discovery; commercial research products and data licensing are not yet offered.

Coverage baseline and interpretation

What the baseline reveals · Our analysis

2 projects lack structured company-role mappings in the comparison record. Until these links are audited, company-exposure comparisons would undercount relationships. The immediate research priority is to verify roles and economic scope, rather than infer revenue from mentions.

39 projects retain an unverified-readiness label. This flags a documentation gap in our coverage; it does not prove that those facilities are inactive. Phase-specific power and customer-delivery evidence can change that assessment.

Capital and power: measurement candidates

Comparable capital and power

The importer found 629 numeric candidates. None is included in headline totals. Each needs quantity, currency, phase, announcement versus spending status, power basis and overlap checks. Candidate extraction is not factual verification.

Inspect numeric candidates
Coverage gaps and audit results

Baseline audit and current coverage flags

Structural checks cover 206 current project records. The October 13 baseline external check opened two primary documents and did not recertify any whole project. Current field-level reviews are listed separately below.

  • 138 projects lack structured company-role mappings.
  • 40 projects were flagged in the October 13 baseline; the October 14 QScale check reduced the current count to 39 still unverified.
  • 147 measurement candidates lack a direct source in their origin field.
  • 207 repeated project/quantity candidates require overlap review.

These are data-quality flags, not findings that projects are invalid. Source-checked announcements below remain excluded from operating-MW and spending totals.

RecordChecked announcementBoundary
Nebius LappeenrantaUp to 310 MWFull-deployment plan; first customer capacity targeted for 2027. Power basis unresolved.
Nebius near Lille / Béthune mapping240 MWFull-deployment target. Exact site mapping depends on other profile evidence; current delivered load unverified.
TSMC ArizonaUSD 265 billionAnnounced multi-phase semiconductor program; not verified spending or AI-data-center capital.

Documents reopened: Nebius March 31 announcement · TSMC Arizona corporate page. Detailed audit record.

Scoped reviews and company-role evidence

Certification backlog · Scoped project reviews

Scoped review dates are recorded per project; latest batch October 19, 2026. These are field-level checks, not whole-project recertifications. Evidence levels differ: attributed issuer statements remain attributed, and unresolved quantities remain outside totals.

ProjectRole checksQuantitiesRemaining evidence
Nebius Lappeenranta AI factory13310 MW full-deployment basis; commissioned first-phase IT load and actual spending remain unverified.
Nebius / Azur Béthune AI data center11Lease terms, commissioned phase and conflicting target dates require resolution; government instruments not freshly checked.
Nebius / Mega DC Modi’in — Israel national AI computing24Current voucher awards/usage, reconciled program deadline, executed tariff and utility identity, metered IT load, 16 MW expansion delivery, parcel/permit identifiers, funding disbursements and realized earnings remain unverified.
Nebius Independence AI factory11Current building/phase design and power arrangements; state retrieval failed; no quantified spending or current operating load certified.
Stargate Abilene23Independent electrical / IT load basis, energized commissioning of delivered capacity, and project economics remain unverified; keep adjacent Microsoft development separate.
QTS Phoenix 3 / PHX3, Glendale11Historical 750 MW plan needs current direct primary confirmation; no current operating IT load or campus financial allocation.
Google Visakhapatnam AI hub22Separate campus/energy/connectivity allocations, IT basis, phase delivery and expenditures remain unknown.
TSMC Arizona semiconductor manufacturing campus11USD 265 billion is a semiconductor-program announcement, not AI-campus spending; Reuters retrieval failed; no site-spend certificate.
ByteDance / Omnia Pecém11Energy contract distinct from capex; current legal/licensing outcome and delivered phase remain unverified.
Voltalia Pecém Data Center23322 MW connection versus 322.5 MW projection; locality conflict and environmental permissions unresolved; bank role only reported.
Meta Hyperion23Direct current regulator orders, service dates, commissioned IT load and campus-only expenditure remain unverified.
IREN Childress / Horizon22Independent customer acceptance, metered utilization, current Horizon 2–4 delivery and site expenditure remain unverified; Childress location page retrieval failed.
Microsoft Fairwater11First facility operating statement checked; comparable MW, utility acceptance and realized facility-specific expenditure remain unknown.
Nscale Narvik / Kvandal24Utility connection/energization, financing draw conditions and customer acceptance remain unverified. Aker’s current economic role needs follow-up; April disclosure describes sole Nscale management.
Start Campus Sines / SIN01 and expansion24Direct permit instrument, metered IT load, second-building acceptance and paid expansion allocations remain unverified. Annual renewable matching does not certify hourly supply.
Applied Digital Polaris Forge 123Independent utility/customer acceptance, utilization and remaining contracted capacity delivery remain unverified.
Applied Digital Polaris Forge 225Post-September utility progress, actual energization/customer acceptance, current permit compliance, metered IT load/utilization, site-specific paid capital and 280/300/200 MW boundary reconciliation remain unavailable.
Core Scientific Muskogee25Utility instruments/consents, conversion of acquired power into AI service and original-versus-expansion overlap remain unresolved.
QTS Fayetteville / Project Excalibur32Phase-specific current approvals, issued building/environmental permits, occupancy and utility acceptance, connected and operating IT MW, executed customer lease, financing allocation/use of proceeds and actual spending remain unverified. Crow Holdings denial must not be attributed to QTS. DRI completed status means regional review, not commissioning.
Central Park Commerce Center / Project Tango00Signed July denial order and final moratorium text, application-specific sufficiency and revision decisions, issued environmental/building permits, executed FPL agreement and current MW/tariff/delivery terms, named operator/customer and funded budget remain unverified. October 13 litigation reporting surfaced, but only the article preview was accessible and the complaint was not reviewed; no allegations are adopted as facts.
Core Scientific Denton26October billing/utilization, original current utility/lease amendments and consent status, reconciliation of 394 MW April potential envelope with September 297 MW existing plus 74 MW additional scope, permits and site-level cash returns remain unresolved. City’s broader investment forecast is not campus operator capex.
ODATA QR0308Government/permit identifiers, executed power agreement, current utilized IT load, tenant identities and lease terms, site-only financed/spent capital, QR03 allocation of the combined cooling budget and final cooling acceptance remain unverified.
Google Pine Island24Final PUC order and full docket review; site ownership and campus IT MW; construction and opening milestones; actual Google service payments; wind/solar/storage commissioning and delivered output; Form Energy contract terms; site-specific capex and earnings. Corporate capex context is not site allocation.
Microsoft Bergheim / Paffendorf AI campus22Final backup-generator decision and conditions; executable grid delivery and IT-load scope; dated commissioning; current construction progress; campus-specific capex, expenditure, customers and recognized revenue remain unverified.
Google Pryor / Mayes County10Current accepted IT and facility MW, workload mix, utilization, site-attributable income, contract prices, tariffs, hardware renewal schedule and phase-specific capital allocation remain unestablished in the reviewed sources unless explicitly disclosed above. Targets remain expectations until confirmed. The map pin represents the locality rather than a verified individual building. Supplier, fund and corporate exposures must be modeled separately.
Google Midlothian15Resolved registered expansion scopes, target dates and current filed cost estimates. Remaining: Building 5 address/cost disagreement with March reporting, actual construction progress, occupancy and IT commissioning for each phase, current IT/peak MW, hardware utilization, campus energy consumption and site earnings. PUE ratios and accessibility-register closure do not resolve these.
Meta Prineville14Resolved historical construction count: city reports 11 completed buildings. Remaining: individual occupancy/IT commissioning dates, future expansion scope, current nameplate/peak and IT MW, hardware utilization, site earnings, tariff and phase capex. Annual facility electricity is disclosed for 2023–2024; it is not a current capacity or utilization measure.
QScale Q0111Current accepted/energized IT MW, utilization, occupied capacity and HPE lease economics; Building B commissioning and occupancy.
IREN Prince George11Current commissioning and customer acceptance of the 10 MW hall; phase-level delivered GPUs and current IT load; recognized Prince George revenue and 2027 deployment scope.
AWS Susquehanna campus20Quarterly actual-transition wording does not resolve every earlier full-transition subphase.; Current actual regional MW, campus portion, IT utilization and cash payments unavailable.; Underlying current utility/FERC instruments and original latest call not reviewed; no new official-action/legal-status claim.
AVAIO Digital Taurus, Brandon, Mississippi10No controlling MPSC order/contract, current building permits, closed finance or accepted MW established.; No direct comparison of elapsed project days with physical output or paid spending; no quantified schedule variance.; Local observation does not establish underground/offsite work status or cancelled construction.
AWS Richmond County21Actual generation start/retirement, permanent-grid acceptance and IT load unavailable; Current administrative docket/stay/amendment not retrieved; Engine-count scope conflict excluded from proposed display; controlling instrument reconciliation required
Stargate Michigan / The Barn (Saline Township)75Direct primary EGLE/local permit records and current compliance; court appeal disposition; current phase energization, delivered and accepted IT load, commissioning, Oracle service start; actual financing draws, cash spent and project economics. Do not call fully certified until these evidence gaps close.
Meta El Paso21Verify full venture closing sources-and-uses and contribution transfers; inspect direct air permit conditions and final PUCT order; later verify utility energization, commissioning, customer acceptance and operating capacity.
AWS Huechuraba Data Center12Current construction and municipal acceptance; any later appeal/stay; original RCA exact date; later-phase power arrangements; site AI equipment, commissioned IT load, utilization, paid capex and attributable revenue remain unverified.
Google Canelones Data Center / Proyecto Teros14Current environmental operating authorization (AAO), module commissioning, utility acceptance and delivered load; disposition of reported administrative challenge; site AI hardware, utilization, paid expenditure and attributable revenue remain unverified.
Digital Realty PDX1210Current delivered/energized IT MW, suite occupancy, AI tenants, liquid-cooling capability, utility service contract/tariff, measured PUE/WUE, phase acceptance and site cash flows remain unverified. The January 2026 tax decision was read; later appeal, payment, subsequent exemption years and tenant recovery were not established. Direct city permit documents were inaccessible. Size figures use different source bases; no expansion is inferred. Map pin remains representative.
Bell AI Fabric Sherwood24Exact cutoff of CAD150m to-date statement; Exact first receipt amount/payer and remaining receipt timetable; Current realized spending after August disclosure; Phase acceptance, utility energization and operating IT load
AWS Warren County / Vicksburg11Issued project-specific building/environmental permits; Entergy/utility executed supply and capacity terms; Post-June construction actual, energized/accepted load; Site-level paid expenditure; latest full earnings-call review
Bell AI Fabric Hillside / TRU11Phase-specific utility supply and occupancy/service acceptance; Hillside-specific capital and current construction actual; Do not conflate existing Kamloops facility with TRU
AWS Mexico (Central)11Government transcript retrieval403; parcel-specific permits/utility instruments not located. Retrieve Querétaro parcel identity and issued permits, then current service/load evidence.
Ascenty Querétaro 113Querétaro government project-specific search did not locate an accessible QRO1 permit. Retrieve Colón occupancy/electrical certificate and operator reconciliation of21vs25 MW; site capex and current occupancy unknown.
AWS New Carlisle / Project Rainier11IDEM original document retrieval failed. Obtain campus/phase permit crosswalk, utility acceptance and Indiana-only customer-service quantities. USD 15 billion later Indiana expansion is separate from originalUSD 11 billion scope; no site spend allocation.
AWS Madison County11County economic-development overview read; issued phase building/occupancy permits and utility acceptance not retrieved. Obtain current Canton and Ridgeland phase certificates, commissioned IT load and campus spending; no whole-county completion.
AWS / STACK Northwest Louisiana11Final plat is not all building/environmental approvals. Retrieve campus-specific permit IDs, SWEPCO service terms/energization, first customer acceptance and financing/drawdown evidence.
AWS Falls Township / Keystone Trade Center, Pennsylvania11Retrieve final09-0261 A decision/conditions, occupancy and customer-service certificates, phase-specific PECO acceptance and Falls capex allocation. Backup-generator count is not IT capacity.
AWS Louisa IAD-550 campus11Retrieve current DEQ74299-2 permit and parcel/site-plan crosswalk (Jefferson Highway versus Haley/Kentucky Road), issued building permits and utility service/commissioning. Full campus identity and actual delivery remain open.
AirTrunk JHB222MIDA page is NST republication, not permit; IFC institutional review is not local authorization. Retrieve JHB2 local building/operating approvals, TNB phase acceptance, customer-service date and disbursements; JHB1 operating scope remains separate.
Beale Project Blue / South Houghton campus11Retrieve post-Apr 23 inspection/occupancy records, ADWR issued well permits, final court disposition afterSep24 and TEP service acceptance. Current customer, financed/spent capex and operatingIT MW remain unknown.
Beale Luckett Road North / South12Retrieve final adopted plans, parcel closing, executed ACC-approved TEP/Trico agreements, funding and issued construction/occupancy permits. Site capex not disclosed in reviewed project sources.
Buckeye Technology Park11Tenant identity, financing terms, infrastructure budget, water and cooling plans, current energized capacity, completion dates and public-company project earnings remain unestablished. Reconcile current 2,019 acres with 2,069-acre acquisition announcement.
Meta Sturgeon County23Phase schedule, present spending, current power delivery, IT versus total-site interpretation of the 1 GW figure, hardware vendors, contract pricing, remaining supply arrangements and campus-attributable benefits remain unestablished here.
STAK Energy Campus12No final lease decision, issued entry authorization, verified construction start, operating capacity, funded all-in phase budget, binding gas supplier, turbine award, computing tenant, GPU order, network-service contract or site revenue was established in this review. Late 2028 is an applicant target. We use approximately 1 GW from the linked applicant plan and do not adopt higher capacity figures from secondary summaries without reconciling scope and document version. March12 applicant design states approximately1GW, whereas May12 DNR preliminary decision (attachment161957, page8), citing April28 cumulative impact analysis, describes1–3GW generation. This is an unresolved primary-source/phase-scope conflict, not only a secondary headline discrepancy; retain March1GW as dated applicant design only.
Google The Dalles11Current IT and facility MW, occupancy-equivalent utilization, workload mix, new-phase budget, hardware orders, tariffs, measured efficiency and campus-attributable revenue or operating savings remain unestablished by the location page. Map coordinates represent the campus area, not a specific server hall.
Switch Citadel12Current commissioned and billable MW, tenants, lease pricing, new-phase investment, power contracts, measured facility efficiency, supplier awards and site earnings remain undisclosed in the cited pages. The map pin denotes the Tahoe Reno campus area rather than a specific phase.
Meta Eagle Mountain11Expansion IT MW, standalone budget, completion dates, actual load, equipment orders, utility pricing, battery payment terms and campus-attributable financial benefits remain undisclosed in the cited materials. Map coordinates denote the Eagle Mountain campus vicinity.
Meta Stanton Springs20Current IT MW, AI workload share, measured utilization, site-specific return, tariff terms, peak water demand, new-phase budget and named equipment contracts remain unestablished in the cited article. The map pin represents the Stanton Springs campus vicinity, with no claim to identify a particular building.
Equinix SV1111Current occupied cabinets, IT MW, AI workload mix, current fuel-cell capacity, upgrade spending and site earnings remain undisclosed in the reviewed sources.
Empire AI Beta21Supplier-specific contract value, hardware allocation, operating budget, actual utilization, maintenance terms and Gamma procurement spending remain unestablished. Scientific benefits are not equated with shareholder profit.
Equinix MI610Current IT MW, utilization, customer mix, AI hardware, pricing, insurance and maintenance costs, upgrade budget and site earnings remain unestablished.
Equinix TR610Current IT MW, billable cabinets, utilization, customer identities, AI mix, pricing, upgrade costs and site profit remain unestablished. No CAD project budget is invented.
Compass Hoffman Estates campus12Current construction progress, energized MW, tenants, lease pricing, financing terms, allocation of the investment headline and project-specific supplier contracts remain unestablished by the cited announcement.
DataBank SNA2 expansion12Current occupancy, AI workload share, rental rates, expansion budget, site margins, measured efficiency, tenant identities and incremental service receipts remain undisclosed in the completion release.
Vantage Ashburn II (VA2)11Current delivery dates, energized and billable capacity, tenant identities, utility arrangements, capital commitments, lease rates, measured efficiency and site-level financing are not established by the operator overview.
Edged Aurora expansion31Tenant identity, lease terms, project budget, financing, current commissioned second-building MW, measured efficiency and partner contract values remain undisclosed.
Vantage Santa Clara III (CA3)21Current customer utilization, contracted and billable MW, pricing, site capital cost, lease structure, measured PUE, actual electricity draw and workload-specific cooling approvals remain undisclosed in the cited project account.
Compass Loudoun County campus11Tenant identities, lease terms, energized and billable MW, delivery schedule, project capital, utility agreements, financing and site earnings remain unknown in the cited entry.
Digital Realty ACC610Current IT MW, occupancy, customer identities, AI workload mix, rent and renewal terms, upgrade budget and facility earnings remain unestablished. Stock valuation requires company-level work beyond this project profile.
CyrusOne Aurora campus11Post-groundbreaking progress, current energized MW, tenants, preleasing, project budget, completion dates, rental terms and binding utility arrangements remain unverified by the cited release.
Digital Realty EWR1210Current occupied and billable capacity, rentable IT space, operating MW, site income, maintenance capital, customer identity, workload mix and project-specific supplier contracts remain undisclosed in the facility listing.
Compass Etobicoke campus12Current operating status and IT MW, leased capacity, tenant identities, explicit budget currency, final cost, financing, supplier contracts and campus earnings remain unestablished by the reviewed release.
Digital Realty YYZ1021Project-specific Markham government evidence remains unread. Appraisal, operator and DCD area/story counts differ. Current metered IT load, AI use, named tenants and site-specific new capital remain unverified. Sourcing: retrieve/read the exact Markham site-plan record; Monitor: read October 22 EGM results and actual closing evidence before changing the dated ownership roles.
QTS New Albany 110Present building status, energized and billable MW, tenants, budget, lease rates, financing, utility capacity agreements and construction awards remain unestablished by the cited listing. Historical DCD144MW/675Beech Road campus plan requires address/phase crosswalk to current DC1/DC2; do not transfer historical envelope automatically.
DataBank LGA321Current occupancy, billable MW, rental rates, tenant identity, site capital cost, operating margin, contractor award economics and LGA4 commitments remain undisclosed in the announcement.
QTS Richmond 5 expansion11Exact DC5 permit decision, incremental IT MW, tenant and DC4–6 budget remain unresolved; threshold is strictly greater than $200m. $200m is a sponsor threshold assertion for the submitted project, not an exact incremental DC4–6 budget.
Meta Rosemount11Opening, IT MW, legal property-holding entity and realized spending not established; Xcel historical late-summer-2025 estimate conflicts with 2026 government target.
DataBank Red Oak campus12Q2 target completion not verified. DFW12 registration estimate is separate from financing total; $800m corporate revolver excluded. Oracle report not promoted to independently checked lease.
CyrusOne Allen campus11Operating draw, delivered split between DFW3/4, phase opening dates and capital budget undisclosed in read specification.
Sabey SDC Seattle expansion12Earlier 6MW Dec 2025 target is superseded in later scope and not added to 12MW; completion, utility agreement and project budget unavailable.
DataBank SEA211Capital budget, dated commissioning, consumed/contracted MW and legal property entity unavailable. Historical 2MW expansion video may overlap current 3MW total and is excluded.
DataBank BOS111Capital budget, dated commissioning, consumed/contracted MW and legal property entity unavailable. Building-wide Markley capacity is not assigned to BOS1.
Microsoft Mexico Central10Read region announcement does not disclose region-specific capex or IT MW. Microsoft $70.7b ecosystem income projection / Google $1.2b LATAM program are not site capex. Region is multiple facilities, not an identified dedicated AI cluster.
Google Cloud Querétaro10Read region announcement does not disclose region-specific capex or IT MW. Microsoft $70.7b ecosystem income projection / Google $1.2b LATAM program are not site capex. Region is multiple facilities, not an identified dedicated AI cluster.
ODATA QR0111No current commissioned MW or phase capital disclosed. QR02 is Amexhe; current site labels Querétaro while 2024 release calls Guanajuato. Exact administrative location remains to reconcile. QR03 and QR04 excluded.
ODATA QR0211No current commissioned MW or phase capital disclosed. QR02 is Amexhe; current site labels Querétaro while 2024 release calls Guanajuato. Exact administrative location remains to reconcile. QR03 and QR04 excluded.
Equinix MX110No site-specific IT MW or capex identified in read facility page. Three-site $175m cash and 8.5MW combined built capacity cannot be allocated equally or repeated as each site’s measurement. Current rack utilization/AI hardware not disclosed.
Equinix MX210No site-specific IT MW or capex identified in read facility page. Three-site $175m cash and 8.5MW combined built capacity cannot be allocated equally or repeated as each site’s measurement. Current rack utilization/AI hardware not disclosed.
Equinix MO110No site-specific IT MW or capex identified in read facility page. Three-site $175m cash and 8.5MW combined built capacity cannot be allocated equally or repeated as each site’s measurement. Current rack utilization/AI hardware not disclosed.
Vantage Quebec City (QC2)13No current metered or accepted MW, completion acceptance, project financing terms or phase spending. QC24 is building 4 at QC2, not Montreal QC4. Source-internal date inconsistency: explicit early2027 target differs from later next-year quotation relative to February2025. Retain explicit early2027 attributed target pending updated commissioning evidence.
Vantage Montreal II (QC4)11Current overview 50MW differs from older 48MW release/gallery. Retain as versioned issuer design claim; no 2MW delivery event inferred. CAD900m release covers several campuses, not QC4 capital.
Equinix MT210Total IT MW, current utilization and site-specific capital not disclosed in read specification. Space, kVA cabinet minimum, redundancy and global uptime are not total MW or site reliability evidence. Bell acquisition consideration is portfolio-wide.
Equinix CL110Total IT MW, current utilization and site-specific capital not disclosed in read specification. Space, kVA cabinet minimum, redundancy and global uptime are not total MW or site reliability evidence. Bell acquisition consideration is portfolio-wide.
Equinix VA110Total IT MW, current utilization and site-specific capital not disclosed in read specification. Space, kVA cabinet minimum, redundancy and global uptime are not total MW or site reliability evidence. Bell acquisition consideration is portfolio-wide.
Google Council Bluffs10Current campus IT MW, site-specific new capital, phase acceptance and AI workload mix unavailable. $20b+ Iowa cumulative and $7b statewide program span more than this campus.
Google Papillion10Current campus IT MW, site-specific new capital, phase acceptance and AI workload mix unavailable. $15b+ Nebraska cumulative, $1.2b three-city program and 2025 community economic activity are not Papillion spending.
Meta DeKalb12Total current IT MW, equipment mix and phase spending unknown. Mortenson completion must not replace 2023 first traffic; AI-designed construction concrete does not prove onsite training hardware.
Vantage Frontier12First-building acceptance, utility service milestones, tenant, leases and current load unknown. TDLR TX311 $74m office estimate is not a data-hall budget and excluded from campus comparison.
Vantage Lighthouse11Replacement docket EIS/completeness/approval, phase energization, customers’ exact contracts and construction financing unresolved. Existing profile says environmental assessment; PSC explicitly requires EIS: proposed correction. $15b+ joint-announcement budget not rechecked directly in this pass.
Microsoft Fairwater Atlanta10Campus IT MW, capital, installed GPUs and parcel/landlord identity not established. Microsoft source describes network-wide architecture; do not assign whole-network GPU counts to Atlanta.
Project Jupiter21Final microgrid permit, gas route, installed fuel-cell capacity and current legal partner roles unresolved. September reporting describes force-majeure and partner changes; April roles are historical.
Meta Kansas City11IT MW, actual expenditure period, current load and dedicated AI share unknown; next-generation AI design elsewhere cannot be transferred to Kansas City.
Google Berkeley County10No Berkeley-specific capital allocation, expansion MW or commissioning schedule. $13b cumulative statewide investment cannot be added to $9b program as distinct campus spend.
Vantage Montreal I / QC111Capital and opening date not disclosed in current source; 11MW is marketed critical IT envelope, not current consumption.
Microsoft Donnacona10Site-specific IT MW and capital not disclosed. Quebec-wide investment cannot be allocated. Utility acceptance and operation remain unknown.
Microsoft L’Ancienne-Lorette10Site-specific IT MW and capital not disclosed. Quebec-wide investment cannot be allocated. Utility acceptance and operation remain unknown.
Colossus Memphis — SpaceXAI / xAI20Capital and metered IT MW undisclosed in reviewed supplier release. Colossus1 Memphis must remain separate from Colossus2/Tulane and Mississippi generation. Current installed count and permits need site-specific reconciliation.
Google West Memphis20Site IT MW and campus-only capital allocation unavailable; 600MW solar/350MW battery are grid assets, not IT load. Ratepayer-benefit claims are utility projections.
Meta Cheyenne11IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates.
Meta Kuna21IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates.
Meta Aiken11IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates.
Meta Mesa11IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates.
Meta Los Lunas11IT MW, current load, actual paid capital and current phase allocation, tariffs and phase acceptance not disclosed in reviewed scope. Renewable project MW must not be substituted for IT MW; site investment remains attributed and excluded from spending aggregates.
Stargate Lordstown10IT MW, standalone capital, commissioning, legal property title unresolved. Bundled Lordstown/Milam1.5GW cannot be assigned to Lordstown. Corporate mapping and signed funding instrument remain held; no operating IT MW or finance close inferred.
CoreWeave Lancaster22100MW/300MW electrical basis not explicitly IT vs facility in release. CoreWeave up-to$6b equipping commitment separate from developer$4b financing; no spent total or acceptance.
Kangerlussuaq Arctic AI proposal20Government concession, parcel, funded capital, IT MW, hydro allocation and subsea cable delivery missing. Proposal may involve hydro bidding; MoU not concession.
Tusass Qinngorput21IT MW undisclosed; DKK155m is building and technical installation budget, not spend. No AI training-cluster role established.
Equinix WI110Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility.
Equinix KA110Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility.
Equinix SJ110Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility.
Equinix OT110Site-specific capital, current IT MW and load undisclosed. Portfolio acquisition price and aggregate revenue cannot be allocated to this facility.
KIO HER110IT MW, site capital, occupancy and dated opening evidence unestablished in primary page. UPS kVA and redundant generator kW cannot be summed into usable ITMW. Design PUE not annual measured efficiency.
KIO MER110IT MW, site capital, occupancy and dated opening evidence unestablished in primary page. UPS kVA and redundant generator kW cannot be summed into usable ITMW. Design PUE not annual measured efficiency.
Google Lenoir12Current commissioned IT MW and campus-only paid capital are not disclosed in reviewed pages; $4B+ is region/state cumulative, not site basis. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. Current Google timeline retrospectively says$1.2b announcement in2007, whereas contemporaneous NC Commerce April19 2013 says$600m original and$600m additional2013; preserve source conflict, do not certify original$1.2b.
Google Montgomery County / Clarksville11Current campus IT MW and paid phase spending unavailable; $6B+ Tennessee total cannot be assigned wholly here. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Google Douglas County11Current commissioned IT MW and paid expansion spending are not disclosed; $3B+ Georgia commitment excludes site-only allocation. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Google Henderson10IT MW and current site-only capital unavailable; $6B+ Nevada cumulative is multi-site. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Google New Albany10Current site IT MW and capital deployment unavailable; $20B+ statewide investment spans multiple sites. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Huntsville10Current MW and total paid campus cost unavailable; city and company historical spending scopes differ and must be reconciled. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Montgomery11Site IT MW not disclosed. 227 MW cited by Meta concerns new Alabama renewable projects, not campus load. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Forest City11Current campus IT MW and paid capital unavailable; historical $450m proposal not actual spending. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Fort Worth10Current IT MW, current paid campus capital and expansion acceptance not disclosed in reviewed operator page. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Lebanon121 GW is design capacity target; basis not certified as IT versus facility electrical. Actual delivered load/spending undisclosed. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Bowling Green11Campus IT MW not disclosed. Toledo Edison named planning counterparty does not establish energized contracted MW. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Altoona10IT MW not disclosed; $2.5B+ current sheet explicitly labels Iowa investment rather than audited campus spending. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Gallatin11Current MW not disclosed by reviewed operator post. $1.5B is attributed campus investment, not audited disbursement; tent MW and overlap unresolved. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. Tent planning approval does not establish delivered tent computing capacity; keep permanent and rapid-deployment phases separate.
Google Lincoln10KOLN reports 52.65 MW peak demand from submitted report; underlying return not yet retrieved, so measurement held and excluded from aggregates. $15B+ Nebraska spans three sites. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. KOLN-reported52.65MW peak electrical demand is available as attributed reporting; original Agate return and measurement interval remain unresolved. Department public viewer returned JS shell; DocumentCloud embed retrieval failed.
Meta Temple11Current IT MW not disclosed. 9,000 MW Texas clean-energy portfolio is not Temple IT capacity; $1.2B+ remains issuer investment claim. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Sarpy10Current commissioned IT MW unavailable; $2.5B+ sheet labels Nebraska-wide investment and cannot establish each campus phase. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Henrico10IT MW unavailable; $1B+ state sheet and original $750m data-center plus $250m solar commitment are different scope components. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Meta Jeffersonville11Current IT MW not disclosed; $800m+ is prospective campus investment upon completion, not verified spending. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Google Jackson County11IT MW not disclosed; $2B+ Alabama cumulative and new $1.5B 2026-27 expansion overlap not established. 300MW new generation is regional power procurement, not IT load. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Google Loudoun County10IT MW and site-only capital allocation unavailable; statewide program must not be allocated to Loudoun alone. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Google Mesa10Current IT MW and paid capital not disclosed; phase-specific completion requires occupancy/service documents. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Vantage Phoenix / AZ111176MW is full-development critical IT envelope. $675m 2019 financing spans multiple campuses/acquisition, not AZ1 budget. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Vantage Quincy / WA113Actual tenant-accepted or billable MW and metered load undisclosed; 89MW campus and 64MW WA13 overlap and cannot be summed. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification.
Equinix DC2111Current IT MW unavailable. 39,665 ft² is space not MW; $95m historical first phase differs from $200m DC metro total. Current phase occupancy, acceptance and legal parcel/permit reconciliation remain field-specific gaps; scoped review is not whole-project certification. Shared DC21/DC22 air-registration identity is not promoted without the exact underlying DEQ record.
Equinix CH410Facility capital, critical IT MW, metered load, opening date and occupied cabinets undisclosed. Government/permit and independent site-specific search attempted; no matched commissioning decision obtained. CH4 must remain floor-specific; TR7 separate from TR6.
Equinix TR710Facility capital, critical IT MW, metered load, opening date and occupied cabinets undisclosed. Government/permit and independent site-specific search attempted; no matched commissioning decision obtained. CH4 must remain floor-specific; TR7 separate from TR6.
Equinix DA1111Tower 2 211,819 ft2 addition differs from operator colocation area. Estimated construction cost is not incurred capex. Independent directory search returned conflicting location/operator labels and was not used.
Sabey SDC Quincy11Reconcile current123MW marketed capacity headline,50–60MW aggregate delivered body and2023 >85MW planned addition, including overlap and phase definitions. DCD completion language differs from primary issuer future tense. No metered load, capex, utility customer allocation or occupancy certified.
CyrusOne Chandler / PHX1–PHX810Building-level occupancy, MW, capex and dated customer acceptance unavailable. City brochure text extraction does not expose map label; prior audit map attribution is not independently renewed.
Mistral AI Bruyères-le-Châtel12Do not count financing as cash spent. 200 MW Europe 2027 is portfolio scope, excluded. Eclairion government register found, but legal/phase linkage to Mistral cluster requires verification; operating MW unavailable.
Data4 Escaudain / Les Soufflantes12700 MW is ultimate planned campus/service scope, not IT load. Company four-building wording versus report initial plus four additional buildings requires reconciliation; no spent capital.
QTS Calatorao / Project Rhodes11Power volume/basis, phase finance, actual spent capex, construction acceptance and tenant unknown. 223.4ha official versus rounded 224ha operator retained.
Compass Meridian, Mississippi12Nearly 500 MW is service-agreement volume, not IT delivered. $10bn includes future tenants equipment, not developer-only capex; no paid expenditure.
Kao Data Harlow AI campus / KLON-031217.6 MW building design versus 22 MW campus lease must not be equated/summed. 152 MW permit figure is thermal backup input, excluded from IT. Project capex unavailable; Nebius UK-wide budget excluded.
VIRTUS Marienpark / BERLIN1 campus12Current 62.6 MW operator versus 57.6 MW dated utility/independent plans unresolved; neither operating load. No campus capital disclosed in selected scope. Exclude separate Wustermark project.
Data4 Frankfurt-Hanau / Großauheim campus12180 MW operator power basis not automatically IT. Permit 457 MW is thermal generator input for partial scope, not IT or grid. Full 128-generator plan differs from initial 64; no metered load/spending.
Meta Beaver Dam11IT MW, phase-specific contracted grid volume, expenditure and customer/service start unverified. Renewable matching is not continuous carbon-free supply.
Google Dorchester County campuses11County fact sheet returned 403; government class attempted. Two-campus boundary, operating MW and phase spend unresolved. Statewide $3.3bn is not Dorchester-only.
Google Fort Wayne / Project Zodiac11Actual IT MW, accepted building count, capex spent and load ramp unverified. Future additional buildings not treated as operating.
Meta Davenport / Vemerald11No IT MW, current paid expenditure or actual handover confirmed; asset valuation and planned capex are separate. Company-specific page not in current cited sources; company class search limited to operator attribution in state record.
Microsoft Villamayor de Gállego campus10EUR5.356bn execution budget covers all three sites; EUR6.69bn older regional plan separate. No defensible Villamayor-only capital or power amount; none promoted.
Google Waltham Cross10Site-specific cost and operating IT MW unavailable in read sources. UK energy-management agreement not site-only electricity volume.
Goodman TYO05 Tsukuba11Current Goodman pipeline extraction omitted project details; search index shows TYO05 50 MW leased/1,000 MW secured. TKO05 vs TYO05 spelling needs reconciliation. Land sale JPY11.029bn is mixed-use land, excluded from DC capex. Latest Reuters October 7 access failed; indexed report flags opposition, not cancellation.
Goodman Project Pluto12126 MW portal load capacity versus applicant 68 MW total consumption requires final consent/technical reconciliation. Capital not disclosed in read portal/submission scope; no incurred capex or commissioning evidence. Directory 2028 target not accepted.
Edged Project Atlas, South Whitehall11Three underlying documents now recorded, including the project-specific DEP notice; a fourth relevant accessible document is still required. Final permits, executed power allocation, financing, customer acceptance and delivered capacity remain unverified. Monitor: check the November 23 hearing and later permit disposition; Sourcing: obtain a readable current revised-plan/applicant document. The earlier $9bn six-building concept is not the revised three-building budget.
Stonebridge Fort Meade / Project Cumulus12County 1.925m ft2 vs Commerce 4.4m ft2 unresolved; entity relationship Florida Ecopark needs documents. No power amount, financing close or incurred capex.
Project Swan, Lakeland10Commercial owner/operator remains unidentified in primary material. Consultant Kimley-Horn role independently attributed in DCD and FOX13, not promoted to operator. No capital or power amount disclosed in reviewed municipal/independent scope. August 3/4 moratorium date discrepancy unresolved.
HostDime SuperNova, Eatonville11Operating MW, occupancy certificate, delivered utility volume, financing and actual spend unavailable. WKMG date sequence contains apparent 2020/2025 inconsistency; do not infer revised legal deadline. WFTV blocked by location.
University of Florida East Campus / HiPerGator21No project-specific executed utility agreement, tariff, measured IT MW, current GPU utilization, final funding reconciliation or operating budget was established. A research portfolio supported by the system is not computing revenue. Public value and supplier economics require different measures.
Global AI Weld / former Kodak campus11Current power duration, executed water terms, issued building/environmental permits, funding, equipment orders, tenants and delivered computing remain unknown.
RAEDEN Project Taurus21Final appellate land-use outcome, exact conditions, IT-versus-total load, customer identity, actual utility cost allocation, capex and financing are unresolved.
Gemini / Sioux Falls Technology Park11Tenant, executed supply agreement, MW, utility upgrades and allocation of costs, capex, financing, building permits and completion schedule are unknown.
Intel Mission Campus / Santa Clara enterprise data centers21Executed agreement, construction/procurement progress, actual spend, current IT load/hardware, fuel-cell fleet and incremental-power delivery remain unknown.
Flexential Parker / Compark21Executed power terms, energization, current delivery date, committed tenants, lease rates, debt, utilization and site margin unknown.
CoreSite DE3 / Race Street campus32Current executed JV terms, funding drawdowns, tariff/service terms, operating MW, tenant contracts, occupancy and future-building approvals unknown.
QTS Aurora–Denver DEN111Direct state air application/decision, phase-specific campus occupancy, utility agreement/tariff, energization, AI customers, operating capacity and financing unknown.
DataBank Centennial Campus / DEN511Campus permits/occupancy certificates, measured IT load, named AI customers, lease-up, specific financing and power commercial terms unknown.
CleanArc VA1 / Caroline County11Final construction/air permits, current funding close and debt terms, executed leases, verified delivered electrical and IT MW, occupancy, measured utilization, current schedule and site earnings remain unknown.
Google Wilbarger County / Project Rise20Campus IT and electrical MW, exact phase boundaries, current utility acceptance, occupancy, contract prices, actual spend, financing close, generation commissioning and site earnings remain unknown.
Blockfusion / CoreWeave Niagara Falls21Final AI phase permits, financing close, current conversion works, incremental power agreement, expansion activation, acceptance and rent commencement are not established.
Stream STAMP / Project Double Reed11Named tenant, final incentive award, DEC wetlands determination, land/substation closing completion, funded phase budget, campus service agreement and delivered load remain unverified.
NCCS / NYDIG Massena AI conversion11Original NYISO decisions, approved service terms, state exemption, executed host terms, financing close, named tenant, final permits and delivered AI load remain unknown.
H5 Buffalo I & II / former Yahoo Lockport21Current NYPA allocation terms, actual IT load, rent, financing details, current lease maturity and named AI workloads are not established.
JPMorgan Chase Orangeburg / Datacenter II10Power counterparty/service agreement, electrical and IT MW, current phase permits, incentive utilization, occupancy, GPU deployment and project-level returns remain unknown.
Dakota State Applied Research Lab, Sioux Falls21Utility terms, IT capacity, equipment suppliers, occupancy certificates, security accreditation, named tenant contracts, realized spending and earnings unknown.
Microsoft India South Central / Hyderabad10Region-specific accepted IT capacity and hardware configuration; Actual region utilization and incremental cash economics; Project-matched environmental, building and electrical acceptance records
Reliance–Meta Jamnagar AI data center21Project-specific permits, environmental approvals and service agreements; Exact parcel and construction evidence; Lease value, financing close, return and accepted IT load; Relationship to separately announced Reliance 120 MW sovereign-AI deployment and wider multi-GW campus
SK–AWS Ulsan AI Zone21Exact current financed phase and contract values; Project-specific permits, direct-power authorizations and tariffs; Accepted IT load and GPU inventory; Construction percentage, commissioning and site earnings
Scala AI City — Eldorado do Sul11No operating IT load, utilization or site earnings verified. See profile for legal, permit and location limits.
HyperDC MBL1 Moorabool11Planning decision, grid agreement and delivery date, customer or tenant, financing, EPC scope, construction start, cooling conditions and operating IT load remain unresolved.
Microsoft Espoo / Hepokorpi campus11Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified.
Microsoft Kirkkonummi / Kolabacken campus10Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Direct final phase-two permit conditions and current compliance disposition require retrieval.
Microsoft Vihti / Huhmari campus11Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Current reconsideration/appeal disposition and final building compliance remain open.
Google Hamina / Summa campus11Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Hamina’s allocation of the Finland programme and new-land construction/commissioning remain unknown.
Google Skien / Gromstul campus12Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Exact allocation boundary, phased energization and final operating date remain open.
Google Winschoten / Hoogebrug campus11Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. DC1A legal-entity ownership chain, cable/phase scope and current appeal/utility acceptance remain unverified.
Meta Talavera de la Reina / Torrehierro campus11Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Direct 2026 reparcelation/guarantee files, final permits, legal-entity chain and current construction commencement need verification.
QTS Cambois / Blyth AI campus13Energization, commissioning, accepted customer capacity, current operating IT MW, utilisation, project spending and campus earnings remain unverified. Final detailed permissions, grid/IT basis reconciliation, funded phase budgets, tenant acceptance and actual spend remain open.
DeepGreen Western Passage subsea-compute proposal11Construction licensing, any issued preliminary permit, final ordinance applicability to the offshore design, continuous power and compute performance, installed or operating IT MW, funding commitments, paying customers, equipment contracts, ownership chain and public financial disclosures remain unverified.
Verne Keflavík VDC04 expansion21Actual construction start, issued building-permit conditions, phase-specific contracted and energized supply, commissioned IT capacity, site budget and spending, and customer commitments remain unverified.
Beyond.pl Poznań AI Factory / F.I.N.46No verified operating AI IT MW or energy measurement; No verified current installed GPU total; No audited final F.I.N. capex or attributable supplier revenue; No verified utilization, customer occupancy or recurring project earnings; Historic permits establish the host, not a new 2025 AI-specific approval.
Related Digital Cheyenne43Exact parcel ownership and campus coordinates, permit conditions, commissioned IT load, tenant acceptance, paid capital, project financing and lease economics remain unverified. The 420 MW capacity basis remains unresolved. No actual operating-power or spending total is established.
Visionbay Xiaogang–Linhai AI Data Center — Phase One22Exact site / permit: Original building permit, permit number, parcel schedule and lease boundary. Power: Direct Taipower letter with addressee, date, quantity basis, conditions, upgrades and energization milestones. BOO execution: Final selection/negotiation result and signed investment contract. Delivery / actual AI use: Site-specific construction inspection, installed hardware, commissioning and customer acceptance. Capital / earnings: Site budget allocation, financing close, drawdown/paid expenditure and revenue. Environmental / other utilities: Current water, sewer/discharge, fire and energy-use approvals where applicable. Company / hardware bridges: Xiaogang-specific supplier/customer contracts and a primary bridge to other Kaohsiung/program names.
Prometheus Hyperscale Evanston Data Center Campus11Full project delivery remains uncertified: no verified construction start; complete Wyoming Industrial Siting Act, DEQ/EPA air and other applicable permits; detailed campus/site plan; primary county resolution and separate power CUP instrument; power-plant design/fuel/emissions; financed/spent capital; tenant/customer; energized capacity; commissioning; operating IT load; metered water; or recognized project revenue. Public developer capacity figure lacks an IT-vs-facility-power basis. The August judicial dismissal was procedural/standing-based, not a merits ruling on environmental claims.

Claim-specific company roles

nebius-lappeenranta · NBIS

AI-cloud operator identified by municipality; project sponsor described by Nebius and independent Yle construction reporting. Land ownership, supplier economics and site revenue are not established.

claim-specific role checked against company, municipal and independent reporting · Scoped check 2026-10-13

Source 1 · Source 2 · Source 3

abilene · ORCL

Oracle is the customer and operator of computing at the existing Abilene campus. On its Sept. 10, 2026 earnings call, management reported six of eight buildings / 618 MW delivered to the customer; site economics and independently metered operating capacity are not established.

Issuer-stated customer / operator role and delivery milestone; delivery quantity not independently measured · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

abilene · NVDA

Crusoe reports Oracle delivered GB200 racks; hardware supplier relationship, not disclosed site procurement revenue.

Issuer-reported deployment; supplier economics unknown · Scoped check 2026-10-13

Source 1

nebius-modiin · NBIS

AI-cloud operator; government confirms national computing service, while company and Globes identify Modiin colocation.

Role sources rechecked October 13; no earnings or current load certification · Scoped check 2026-10-13

Source 1 · Source 2 · Source 3

nebius-modiin · NVDA

Blackwell hardware and networking identified by operator; B200 program allocation confirmed by authority.

Role sources rechecked October 13; no earnings or current load certification · Scoped check 2026-10-13

Source 1 · Source 2

qts-phoenix-3 · BX

QTS platform owned by affiliated Blackstone funds, not a direct campus-specific earnings allocation. QTS identifies Phoenix 3 location.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2 · Source 3

google-visakhapatnam · GOOGL

AI-hub sponsor; commitment includes data-center, energy and connectivity components.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2 · Source 3

google-visakhapatnam · ADANIENT

Participation via 50:50 AdaniConneX joint venture with EdgeConneX; partnership for campus and energy development.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

nebius-independence · NBIS

AI factory developer/sponsor; company describes building and phased contractor work, DCD reports groundbreaking.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

bytedance-omnia-pecem · PAX

Reuters identifies Omnia as Patria Investments platform building for ByteDance; government recommendation addresses Omnia WN. Specific equity economics unverified.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

voltalia-pecem · VLTSA

Issuer reports grid-use agreement; federal summary identifies Voltalia Energia do Brasil as proponent. Retained site economics unknown.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2 · Source 3

voltalia-pecem · SAN

Reuters reports Santander retained to seek offtake; not confirmation of lending, ownership or a tenant.

Single independent report; bank confirmation pending · Scoped check 2026-10-13

Source 1

nebius-bethune · NBIS

AI-cloud participant planning full deployment near Lille; DCD identifies Béthune redevelopment. Exact lease economics unknown.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

tsmc-arizona · TSM

Arizona foundry-campus sponsor/operator; official corporate and state disclosures distinguish production from expansion plans.

Scoped source check; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

hyperion · META

Meta identifies itself as sponsor of Hyperion and the expanded Richland Parish campus.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

hyperion · ETR

Entergy Louisiana, an Entergy subsidiary, describes planned utility infrastructure for Meta. No project earnings allocation established.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

iren-childress · IREN

IREN reports delivery of Horizon 1 and development of the remaining Horizon phases.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

iren-childress · MSFT

Microsoft is the customer named in IREN’s Horizon 1 delivery disclosure. Independent acceptance evidence pending.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

fairwater · MSFT

Microsoft reports its first Mount Pleasant facility operational; second facility remains a separate construction scope.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

nscale-narvik · MSFT

Nscale identifies Microsoft as compute customer; DCD corroborates the changed customer scope.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

nscale-narvik · NVDA

NVIDIA Rubin is the announced future hardware platform; installed units and supplier revenue are unverified.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

start-campus-sines · MSFT

Microsoft is the compute customer identified in Nscale’s Sines agreement and DCD reporting.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

start-campus-sines · NVDA

NVIDIA hardware is specified for the future expansion; installed quantity and procurement revenue remain unverified.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

polaris-forge-1 · APLD

Applied Digital reports ownership/development and operational delivery at Polaris Forge 1.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

polaris-forge-1 · CRWV

CoreWeave is the customer named for Polaris Forge 1 in Applied Digital’s disclosure; lease economics remain separately scoped.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

polaris-forge-2 · APLD

Applied Digital’s subsidiary issued notes for Polaris Forge 2 development. Tenant identity remains undisclosed in checked documents.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

core-muskogee · CORZ

Core Scientific identifies the original Muskogee subsidiary and acquisition-led expansion.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1 · Source 2

core-muskogee · CRWV

CoreWeave is the filing-named customer for the original Muskogee allocation; not inferred for every future expansion.

Scoped source check; issuer attribution retained; not full-project recertification · Scoped check 2026-10-13

Source 1

qts-fayetteville · BX

Owner of QTS; project-level earnings and capital contribution not disclosed

Primary-document role attribution checked · Scoped check 2026-10-13

Source 1

qts-fayetteville · SO

Parent of Georgia Power, named electric provider for ATL2 East; service terms and project earnings not disclosed

Primary-document role attribution checked · Scoped check 2026-10-13

Source 1

qts-fayetteville · MSFT

Tenant identified in AFII financial research; original lease and current accepted capacity not reviewed

Attributed independent-research tenant identity; original lease unreviewed · Scoped check 2026-10-13

Source 1

core-denton · CORZ

Denton facility licensor on city-owned leased land; issuer reports billing capacity, not current measured IT utilization

Issuer/regulatory disclosure role checked; not independent earnings verification · Scoped check 2026-10-13

Source 1 · Source 2

core-denton · CRWV

Contracted computing customer; site-specific cloud revenue and utilization undisclosed

Issuer/regulatory disclosure role checked; not independent earnings verification · Scoped check 2026-10-13

Source 1 · Source 2

google-pine-island · GOOGL

Google announced the Pine Island data center and an arrangement under which Google pays costs associated with its electric service; legal site ownership, project-specific capital allocation, and site earnings are not disclosed.

claim-specific primary-source role check; no project-level earnings attribution · Scoped check 2026-10-14

Source 1 · Source 2

google-pine-island · XEL

Xcel Energy is the electric-service provider and counterparty to the Clean Energy Accelerator Charge; the Minnesota PUC lists its agreement with Google subsidiary Echo Zone as under review. Agreement economics and project-specific utility earnings are not established.

claim-specific primary-source role check; no project-level earnings attribution · Scoped check 2026-10-14

Source 1 · Source 2 · Source 3

microsoft-bergheim · MSFT

Microsoft sponsors the Bergheim campus; Microsoft Deutschland MCIO GmbH is the state-record applicant. No site revenue or operating acceptance established.

Claim-specific primary-source role check · Scoped check 2026-10-14

Source 1 · Source 2

microsoft-bergheim · RWE

RWE reports selling Bergheim land to Microsoft in April 2024. Historical land vendor only; no verified campus utility contract, recurring revenue or disclosed transaction amount.

Claim-specific primary-source role check · Scoped check 2026-10-14

Source 1

google-pryor · GOOGL

Google / Alphabet is the owner-user operator; current Google location page explicitly identifies the operating Pryor campus. No campus revenue or earnings allocation.

Claim-specific operator identity and existing-campus readiness checked · Scoped check 2026-10-14

Source 1 · Source 2

google-midlothian · GOOGL

Owner-user campus operator supported by operating-site evidence; no project-specific earnings or currently delivered IT MW verified.

Claim-specific owner-user role and existing-campus readiness checked · Scoped check 2026-10-14

Source 1 · Source 2 · Source 3

meta-prineville · META

Owner-user campus operator supported by operating-site evidence; no project-specific earnings or currently delivered IT MW verified.

Claim-specific owner-user role and existing-campus readiness checked · Scoped check 2026-10-14

Source 1 · Source 2 · Source 3

airtrunk-jhb2 · BX

Shareholder identified in IFC project52336; fund ownership, not site-specific recognized BX earnings.

IFC-identified shareholder; scope checked · Scoped check 2026-10-14

Source 1

qscale-q01 · HPE

Named anchor tenant and AI Cloud customer at Q01; QScale's customer case study reports successful launch. No site-level HPE rent, current draw, or utilization is disclosed.

Claim-specific tenant and customer-delivery role checked · Scoped check 2026-10-14

Source 1 · Source 2

iren-prince-george · IREN

Owner-operator of the Prince George campus and AI Cloud service provider; issuer reports site-specific contracted ARR but does not allocate current recognized revenue or commissioned IT MW to individual halls.

Claim-specific owner-operator and site-demand role checked · Scoped check 2026-10-14

Source 1 · Source 2 · Source 3

salem · TLN

Regional AWS power supplier; not campus computing operator

Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16

Source 1 · Source 2

salem · PPL

PPL Corporation subsidiary PPL Electric Utilities: transmission/delivery role attributed to Talen in June 2025 reporting; completed current configuration and site revenue unverified

Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

avaio-brandon · ETR

Entergy Mississippi service agreement reported by issuer; no delivered load or campus profit certified

Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16

Source 1 · Source 2

aws-richmond · AMZN

Announced Richmond campus sponsor

Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16

Source 1

aws-richmond · DUK

Duke Energy Progress temporary bridge-power permittee, not quantified campus earnings

Claim-specific attributed role checked; current accepted load/site earnings not established · Scoped check 2026-10-16

Source 1 · Source 2

stargate-saline · ORCL

Oracle is the intended customer and project operator/service provider. MPSC identifies Green Chile Ventures LLC as Oracle subsidiary and DTE customer; Oracle reports construction and intended customer delivery. Actual acceptance, service commencement and site revenue remain unverified.

Identity/customer role checked against regulator and Oracle sources; operations and economics unverified · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

stargate-saline · OPENAI

OpenAI is named as a project/compute partner in the original site announcement and Oracle/Related construction announcements. Exact lease, capacity reservation, payment and operating role are not public in the reviewed evidence.

Project partnership role checked against issuer announcements; contract economics unresolved · Scoped check 2026-10-16

Source 1 · Source 2

stargate-saline · RELATED_DIGITAL

Related Digital is the developer/sponsor and announced the financing package; project construction reports identify it as development partner.

Developer/sponsor role checked against sponsor and project-team announcements · Scoped check 2026-10-16

Source 1 · Source 2

stargate-saline · BX

Related’s financing announcement identifies equity from funds affiliated with Blackstone. Treat as affiliated-fund investment; do not infer that Blackstone corporate balance sheet owns all assets or that the firm alone funds the project.

Fund-affiliate investment role checked against sponsor and project-team announcements · Scoped check 2026-10-16

Source 1 · Source 2

stargate-saline · PIMCO

Related identifies PIMCO-managed funds and accounts as anchors of fixed-rate long-term project debt. This is managed-account/fund exposure, not proof that PIMCO corporate balance sheet is lender.

Managed-fund debt role checked against sponsor announcement; final closing/draws unresolved · Scoped check 2026-10-16

Source 1 · Source 2

stargate-saline · DTE

DTE Electric is the regulated utility with MPSC-approved special contracts for Green Chile Ventures; DTE is also assigned to develop, own and operate approved storage facilities for grid benefit.

Regulated utility / storage developer role checked against MPSC disclosures · Scoped check 2026-10-16

Source 1 · Source 2

stargate-saline · WALBRIDGE

Walbridge is identified in Oracle’s project-team releases as a construction partner; Oracle’s September 2026 labor update references a Walbridge safety manager on site.

Construction contractor relationship checked against project-team releases · Scoped check 2026-10-16

Source 1 · Source 2

meta-el-paso · META

Meta announced the project as the campus developer and sole initial occupant / lessee; the July announcement describes a 2028 delivery target. Construction is independently reported as underway Oct. 14, 2026.

Issuer announcement and independent construction reporting; project role scoped, no operating capacity verified · Scoped check 2026-10-16

Source 1 · Source 2

meta-el-paso · BLK

Meta describes an 80% venture interest for funds managed by BlackRock. Reuters reports a project-linked bond sale; this does not establish the venture’s complete funding or BlackRock corporate balance-sheet exposure.

Issuer-described fund-managed ownership plus independently reported debt issuance; full sources-and-uses not verified · Scoped check 2026-10-16

Source 1 · Source 2

aws-huechuraba · AMZN

AWS sponsor through Servicios Amazon Data Services Chile SpA, named project holder. The wider Chile AI/cloud plan does not establish site-specific AI hardware, capacity, customers or earnings.

Claim-specific primary-source role check · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

google-canelones · GOOGL

Google sponsors the Canelones / Teros digital and AI-supporting campus; Eleanor Applications is the environmental applicant. No site-level Google Cloud revenue, hardware contract, utilization or return is established.

Claim-specific primary-source role check · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

digital-pdx12 · DLR

Colocation operator; Beaver Ventures LLC ownership chain documented in court decision. Site revenue and tenant cost recovery undisclosed.

Claim-specific operator and ownership chain checked; no site earnings or acceptance certification · Scoped check 2026-10-16

Source 1 · Source 2

bell-sherwood · BCE

Bell/BCE campus developer/operator and capital-plan sponsor; source-attributed financial actuals, not guaranteed project returns.

Attributed claim-specific role; site revenue and acceptance unverified · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

bell-sherwood · CRWV

Named future compute tenant in BCE Sherwood project paragraph; no attributable site revenue, utilization or identification as the prepayment payer.

Attributed claim-specific role; site revenue and acceptance unverified · Scoped check 2026-10-16

Source 1

aws-warren · AMZN

Amazon/AWS is the announced investor and intended cloud operator for the Warren County/Vicksburg campus. Sponsor identity is supported by Amazon, the state announcement and original local reporting. No current operating acceptance or site earnings established.

Claim-specific sponsor/platform role source checked; no current commercial acceptance · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

bell-tru-kamloops · BCE

Bell AI Fabric is the named platform partner for Hillside at 1452 McGill Road, supported by Bell, TRU Community Trust and original CFJC reporting. This scoped check does not establish legal asset ownership, current operations or site revenue.

Claim-specific sponsor/platform role source checked; no current commercial acceptance · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

aws-mexico · AMZN

Amazon/AWS operates the Mexico (Central) cloud region; region-level role only, no parcel ownership or site earnings inferred.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

ascenty-qro1 · DLR

Ascenty is the named facility operator; Digital Realty shareholder backing is identified by Ascenty and DCD. No ownership percentage or site cash distributions established.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

aws-new-carlisle · AMZN

Amazon/AWS is the announced St.Joseph County campus investor and Rainier operator; Anthropic use is Rainier-wide and not allocated to Indiana.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

aws-madison · AMZN

Amazon/AWS is sponsor and cloud operator for the Madison County program; Canton operating statement and Ridgeland construction must remain separate.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

aws-northwest-louisiana · AMZN

Amazon/AWS is the announced cloud participant/investor; STACK is named developer/owner of the three campuses. No AWS freehold ownership or STACK revenue amount inferred.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

aws-falls · AMZN

Amazon/AWS is the named campus cloud investor/operator; NorthPoint is developer at Keystone. PECO coordination does not establish accepted campus computing load.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

aws-louisa-iad550 · AMZN

AWS is the Louisa two-campus program sponsor. Historical IAD550 comparison record identifies Amazon Data Services; no new parcel/legal equivalence to Lake Anna inferred.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

airtrunk-jhb2 · AirTrunk

AirTrunk Malaysia Sdn.Bhd. is IFC project52336 company; AirTrunk develops JHB2. This operator/developer role is distinct from the already recorded Blackstone shareholder role.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

beale-project-blue · Beale

Beale is the campus developer; Bobcat B1 land transaction and Bobcat Tucson Water linkage are project entities, not identified end customers or revenue counterparties.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

beale-luckett-marana · Beale

Beale is the Luckett Road developer; AZPM identifies Fremont Peak Properties LLC as its subsidiary/applicant. Landowners and utility pathways do not identify the final tenant.

Claim-specific project participation source checked; certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

buckeye · Tract

Land owner and technology-park developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sturgeon · META

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sturgeon · CPX

Disclosed capacity-and-energy supplier under >10-year ESA, not confirmed current delivery

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

stak · STAK Energy Corporation

Applicant and proposed developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

google-dalles · GOOGL

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

switch-citadel · Switch

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-eagle-mountain · META

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-stanton-springs · META

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-stanton-springs · Newton County Water and Sewerage Authority

Water service provider attributed by Meta with quoted authority executive; contract and allocation not independently retrieved

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sv11 · EQIX

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

empire · Empire AI

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

empire · NVDA

NVIDIA-powered Beta system named by hosting University; contract size not disclosed

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

mi6 · EQIX

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

tr6 · EQIX

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

hoffman · Compass Datacenters

Project developer / colocation provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sna2 · DataBank

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

va2 · Vantage Data Centers VA2 LLC

Project developer / colocation provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

edged · Edged US

Project developer / colocation provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

edged · FCL Builders

Construction partner named by Edged for second Aurora building

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

edged · ThermalWorks

Cooling-system provider named in second-building announcement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

ca3 · Vantage Data Centers

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

ca3 · DPR Construction

Project contractor reporting CA3 physical scope and October2024 customer opening

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

compassva · Compass Datacenters LLC

Project developer / colocation provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

acc6 · DLR

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

cyrusaurora · CyrusOne

Project developer / colocation provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

ewr12 · DLR

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

etobicoke · Compass Datacenters LLC

Project developer / colocation provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

yyz10 · DLR

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

qtsnal · QTS

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

lga3 · DataBank

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

lga3 · AECOM/Tishman

General contractor identified by DataBank opening release

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

ric5 · QTS Richmond V, LLC

Sponsor / proposed campus developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

rosemount · META

Owner-user / developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

redoak · DataBank

Developer / construction financing borrower

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

allen · CyrusOne

Campus operator / developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sdcseattle · Sabey Data Centers

Campus developer / operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sea2 · DataBank

Colocation facility operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

bos1 · DataBank

Colocation facility operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

azure-mexico · MSFT

Cloud region operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-mexico · GOOGL

Cloud region operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

odata-qr01 · ODATA

Campus operator / developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

odata-qr02 · ODATA

Campus operator / developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-mx1 · EQIX

IBX colocation operator; acquirer from Axtel

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-mx2 · EQIX

IBX colocation operator; acquirer from Axtel

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-mo1 · EQIX

IBX colocation operator; acquirer from Axtel

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-qc2 · Vantage Data Centers

Campus developer / operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-qc4 · Vantage Data Centers

Montreal II campus developer / operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-mt2 · EQIX

IBX colocation operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-cl1 · EQIX

IBX colocation operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-va1 · EQIX

IBX colocation operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-council-bluffs · GOOGL

Data center owner / operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-papillion · GOOGL

Data center owner / operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-dekalb · META

Data center owner / operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-frontier · Vantage Data Centers

Campus developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-lighthouse · Vantage Data Centers

Lighthouse campus developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

fairwater-atlanta · MSFT

Named developer/operator of this data center in operator construction/operation disclosure

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

project-jupiter · ORCL

Announced cloud-campus customer and bearer of energy costs, as of April27 2026 attribution

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

project-jupiter · BE

Announced fuel-cell supplier, up to 2.45GW planned; installation unverified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-kansas-city · META

Named owner-user/developer of this campus in dated operator announcement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-berkeley · GOOGL

Named owner-user/developer in project disclosure

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-qc1 · Vantage Data Centers

Operator marketing Montreal I QC1 colocation and critical IT capacity

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

microsoft-donnacona · MSFT

Named developer/operator of this data center in operator construction/operation disclosure

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

microsoft-lancienne · MSFT

Named developer/operator of this data center in operator construction/operation disclosure

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

xai-colossus · X.AI Corp.

Builder/operator and Grok workload user as of Oct2024

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

xai-colossus · NVDA

Hopper GPU and SpectrumX networking supplier as of Oct2024

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-west-memphis · GOOGL

Named owner-user/developer in project disclosure

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-west-memphis · Entergy Arkansas LLC

Announced electricity supplier

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-cheyenne · META

Named owner-user/developer of this campus in dated operator announcement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-aiken · META

Named owner-user/developer of this campus in dated operator announcement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-mesa · META

Named owner-user/developer of this campus in dated operator announcement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-los-lunas · META

Named owner-user/developer of this campus in dated operator announcement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

stargate-lordstown · 9984

Developer of small Lordstown proof-of-concept, clarified in village-recorded company response

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

coreweave-lancaster · CRWV

Announced tenant and equipment investor

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

coreweave-lancaster · Chirisa Technology Parks

Co-developer with Machine Investment Group

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

greenland-arctic-ai · AmForge Corporation

MoU development partner; future operation intention

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

greenland-arctic-ai · Inuit Development Company

MoU development partner; not awarded concession verified

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

tusass-nuuk · Tusass A/S

Project owner/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

tusass-nuuk · Permagreen Grønland A/S

Main building contractor

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-wi1 · EQIX

Current branded facility operator;2020 Bell acquisition context

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-ka1 · EQIX

Current branded facility operator;2020 Bell acquisition context

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-sj1 · EQIX

Current branded facility operator;2020 Bell acquisition context

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-ot1 · EQIX

Current branded facility operator;2020 Bell acquisition context

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

kio-her1 · KIO Data Centers

Named facility operator, regional enterprise/edge service

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

kio-mer1 · KIO Data Centers

Named facility operator, regional enterprise/edge service

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-lenoir · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-clarksville · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-douglas · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-henderson · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-new-albany · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-huntsville · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-montgomery · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-forest-city · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-fort-worth · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-lebanon · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-bowling-green · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-altoona · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-gallatin · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-lincoln · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-temple · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-sarpy · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-henrico · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-jeffersonville · META

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-jackson · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-loudoun · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-mesa · GOOGL

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-az1 · Vantage Data Centers

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

vantage-wa1 · Vantage Data Centers

developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-dc21 · EQIX

colocation facility operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-ch4 · EQIX

Named IBX colocation operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-tr7 · EQIX

Named IBX colocation operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

equinix-da11 · EQIX

Equinix LLC owner of Tower 2; operator of DA11

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

sabey-quincy · Sabey Data Centers

Quincy campus developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

cyrus-chandler · CyrusOne

PHX1–PHX8 Chandler campus operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

mistral-bruyeres · Mistral AI

Borrower and GPU-compute capacity sponsor at Bruyères-le-Châtel

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

data4-escaudain · Data4

Escaudain Les Soufflantes campus developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

qts-calatorao · QTS

Developer and intended operator of Calatorao/Project Rhodes

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

compass-meridian · Compass Datacenters

Meridian eight-building campus developer; Mississippi Power is named electricity counterparty

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

kao-harlow · Harlow Operations Limited

Kao Harlow campus operator; developer of KLON-03

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

virtus-marienpark · VIRTUS Data Centres

Marienpark campus developer/operator; DATA2HEAT planned heat reuse partner

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

data4-hanau · Data 4 Germany S.à.r.l.

Hanau campus applicant; Data4 developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-beaver-dam · META

Beaver Dam campus sponsor/operator; Mortenson named general contractor

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-dorchester · GOOGL

Google developer/operator of Dorchester campuses

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-fort-wayne · GOOGL

Fort Wayne/Project Zodiac owner/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

meta-davenport · Vemerald

Wholly owned Meta subsidiary and Davenport project developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

microsoft-villamayor · MSFT

Developer of Villamayor campus within three-campus Aragón cloud region

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-waltham-cross · GOOGL

Waltham Cross data-centre developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

goodman-tsukuba · Goodman Japan Tsukuba TMK

Land purchaser/development vehicle; Goodman sponsor

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

goodman-project-pluto · Goodman Property Services (Aust.) Pty Ltd

SSD-69223466 applicant identified by Urbis submissions report; no inference of end operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

edged-project-atlas · CDE Acquisitions LLC

Edged development affiliate for Project Atlas, per independent project reporting

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

stonebridge-fort-meade · Fort Meade DC LLC

County incentive applicant; Stonebridge developer per independent report

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

project-swan-lakeland · Kimley-Horn

Reported engineering consultant; not established as developer/operator

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1 · Source 2

hostdime-supernova · HostDime

Developer/intended operator of SuperNova at 1 Innovative Pl

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

uf-hipergator · University of Florida

Owner/operator of HiPerGator East Campus system

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

uf-hipergator · NVDA

Installed DGX B200 technology supplier; contract revenue unknown

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

global-ai-weld · Global AI (Colorado), LLC

USR26-0019 project applicant

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

raeden-project-taurus · RAEDEN

Applicant/developer of Corporate Ridge Filing 1 Lot 4 modification

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

raeden-project-taurus · 3G Venture II, LLC

Site owner identified by city docket

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

gemini-sioux-falls · Gemini Data Center SD LLC

Landowner/applicant preparing Sioux Falls Technology Park; future operator unnamed

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

intel-santa-clara · INTC

Computing-site owner/customer funding Juliette expansion at 3750 Juliette Lane

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

intel-santa-clara · Silicon Valley Power

Owner/operator of Juliette substation under proposed agreement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

flexential-parker · Flexential

Developer and prospective operator of Parker fifth Denver facility

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

flexential-parker · CORE Electric Cooperative

Named planned electricity provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

coresite-de3-denver · CoreSite

Developer/operator of DE3

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

coresite-de3-denver · Stonepeak

Reported 85% JV investor in DE3 development

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

qts-aurora-denver · QTS

Developer/operator of Denver 1 Aurora campus

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

databank-centennial · DataBank

Owner/operator of adjacent DEN2 and DEN5 Centennial campus

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

cleanarc-va1-caroline · CleanArc Data Centers Operating LLC

Campus developer/operator through county-described subsidiary

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-wilbarger-rise · GOOGL

Developer/customer of Wilbarger data center under construction

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

google-wilbarger-rise · AES

Contracted co-located generation/powered-land developer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

blockfusion-niagara · North East Data, LLC

Landlord/owner under executed Niagara lease

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

blockfusion-niagara · CRWV

Tenant/customer under executed agreement reported September 2026

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

stream-stamp-double-reed · Stream U.S. Data Centers LLC

Applicant/developer of Project Double Reed at STAMP

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

nccs-nydig-massena · North Country Colocation Services

Existing site operator and proposed expansion applicant

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

h5-lockport-yahoo · H5 Data Centers

Real-estate acquirer/colocation marketer for Buffalo I/II

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

h5-lockport-yahoo · Yahoo

Continuing operating tenant under reported sale-leaseback

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

jpmorgan-orangeburg · JPMorgan Chase Bank, National Association

Owner/applicant for JPMC Datacenter II expansion and incentive agreement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

dsu-sioux-falls-arl · Dakota State University

Public-university project sponsor/user of Sioux Falls Applied Research Lab

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

dsu-sioux-falls-arl · IMEG

Mechanical/electrical/structural/technology/security design engineer

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

microsoft-hyderabad-south-central · MSFT

Operator of India South Central cloud region in Hyderabad

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

reliance-meta-jamnagar · Reliance Industries Limited

Build-to-suit developer and lifecycle services provider

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

reliance-meta-jamnagar · META

Prospective lessee/customer for announced 168 MW phase

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sk-aws-ulsan · SK Group

Ulsan AI data center partnership/development sponsor

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

sk-aws-ulsan · AMZN

AWS cloud/AI-zone partner in 15-year arrangement

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

scala-ai-city-eldorado-do-sul · Scala Data Centers

Announced AI City developer in Eldorado do Sul

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

hyperdc-mbl1-moorabool · Hyper DC Pty Ltd

Applicant for PA2604671 at 715 Ballan Road, Moorabool

Claim-specific attributed role source checked; broader certification gaps remain · Scoped check 2026-10-16

Source 1

microsoft-espoo · MSFT

Microsoft develops the Espoo campus; Microsoft 3465 Finland Oy is the municipal land purchaser. Fortum has a separate heat-recovery role; no site earnings allocation established.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4 · Source 5

microsoft-kirkkonummi · MSFT

Microsoft develops the distinct Kolabacken campus. Fortum’s associated heat-recovery infrastructure is separate from Microsoft’s computing operations.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

microsoft-vihti · MSFT

Microsoft develops Vihti; Microsoft 3465 Finland Oy is the named permit applicant. Mercury is an issuer-identified contractor, with no contract economics established.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

google-hamina · GOOGL

Google operates Hamina; Alphabet is its public parent. The newly acquired land is potential expansion, not accepted incremental compute.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

google-skien · GOOGL

Google sponsors the Gromstul campus. ZAUNERGROUP reports a fit-out award; no contract value or site supplier revenue is established.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

google-winschoten · GOOGL

Google identifies Winschoten as its Dutch cloud/AI-supporting site. The provincial notice names Green Box Computing B.V. at Hoogebrug III; this is a location/permit match, not a reviewed corporate ownership chain.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3 · Source 4

meta-talavera · META

Municipal records identify Meta’s campus; Europa Press identifies Zarza Networks S.L. as Meta’s subsidiary, attributed to the regional government. No campus operating revenue is established.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1

qts-cambois · BX

QTS develops and will operate Cambois; Renaissance Land and Blackstone-affiliated fund ownership are distinct from listed Blackstone’s direct corporate ownership or attributable site earnings.

Claim-specific scoped role check; attribution and limits retained · Scoped check 2026-10-16

Source 1 · Source 2 · Source 3

meta-kuna · META

Campus owner-user/developer and issuer-reported operator

Claim-specific attributed role checked; no site earnings or full certification · Scoped check 2026-10-17

Source 1

meta-kuna · IDA

Idaho Power Brisbie electric-service counterparty; IDACORP corporate financial context, not campus owner

Claim-specific attributed role checked; no site earnings or full certification · Scoped check 2026-10-17

Source 1 · Source 2

coresite-de3-denver · XEL

CoreSite names Xcel Energy as electricity provider for planned DE3 compute capacity; executed service terms, actual load and attributable earnings unestablished.

Claim-specific attributed role checked; no site earnings or full certification · Scoped check 2026-10-17

Source 1

polaris-forge-2 · ABBN

Documented low/medium-voltage power architecture, UPS and switchgear supplier; no order value, site revenue or delivery acceptance inferred.

Exact supplierrole checked; amount/deliverynotdisclosed. · Scoped check 2026-10-17

Source 1

deepgreen-western-passage · DeepGreen Western Passage SPV LLC

Named applicant for preliminary feasibility priority in FERC P-15424-000; ownership chain, committed funding, technology suppliers and customers remain unverified.

Claim-specific government-record applicant identity; ownership and commercial roles unverified · Scoped check 2026-10-17

Source 1

verne-keflavik-vdc04 · Verne

Developer and operator; Verne Global ehf. is the municipal applicant for VDC04.

Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17

Source 1 · Source 2

verne-keflavik-vdc04 · Ardian

Private shareholder: acquisition of Verne completed in March 2024; platform backing does not establish VDC04 funding drawn or spent.

Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17

Source 1 · Source 2

beyond-pl-poznan-ai-factory · Beyond.pl

Developer, investor and operator; legal entity Beyond.pl Sp. z o.o., KRS 0000237620.

Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17

Source 1 · Source 2 · Source 3

beyond-pl-poznan-ai-factory · Kulczyk Investments

Private owning group; official portfolio reports100% ownership of Beyond.pl. No phase-specific equity amount verified.

Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17

Source 1

beyond-pl-poznan-ai-factory · NVDA

Disclosed DGX B200 compute and networking technology supplier/technical collaborator. No project contract value or attributable revenue verified.

Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17

Source 1 · Source 2

beyond-pl-poznan-ai-factory · P

Disclosed FlashBlade storage supplier/technical collaborator. Everpure, Inc. is the current legal name; project disclosures used Pure Storage. No project contract value or attributable revenue verified.

Source-checked named role; no project revenue or expenditure inferred · Scoped check 2026-10-17

Source 1 · Source 2

related-digital-cheyenne · Related Digital

Developer

Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18

Source 1

related-digital-cheyenne · CRWV

First-phase anchor tenant

Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18

Source 1

related-digital-cheyenne · Clayco

Construction manager

Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18

Source 1

related-digital-cheyenne · BKH

Initial-phase electric-service provider via Black Hills Energy

Source-checked role; no ownership share or economic allocation inferred · Scoped check 2026-10-18

Source 1

visionbay-xiaogang · Visionbay

Legal BOO applicant and proposed AI computing-service operator

Claim-specific source check; not current operation or site economics · Scoped check 2026-10-19

Source 1

visionbay-xiaogang · 2317

Listed parent of applicant at latest June 30 reporting date

Claim-specific source check; not current operation or site economics · Scoped check 2026-10-19

Source 1

yyz10 · DCRU

Reported 90% interest at June 30, 2026; proposed seller in the October 7 circular. A closed transfer has not been verified.

Dated issuer ownership disclosure checked; current closing not certified · Scoped check 2026-10-19

Source 1 · Source 2

prometheus-evanston · PRIVATE:Prometheus-Hyperscale

Prometheus Hyperscale is the private developer/sponsor named in its project release and local coverage. No public-company ticker, attributable revenue or investor exposure is established.

Claim-specific role check; public-market exposure not identified · Scoped check 2026-10-19

Source 1 · Source 2

Source-checked capital and power

ProjectQuantityMeasurement basisStatusExclusion / source
nebius-lappeenranta310 MWCompany-disclosed AI factory capacity; electrical versus IT-load basis not explicitly resolvedCompany-announced upper boundPower basis unresolved; not verified operating load
Source
nebius-bethune240 MWCompany-disclosed full-deployment AI factory capacity; electrical versus IT-load basis unresolvedCompany-announced targetPower basis and current delivered phase unresolved
Source
tsmc-arizona2.65e+11 USDAnnounced Arizona semiconductor manufacturing and packaging investment envelopeAnnounced investment; not actual spending or closed financingMixed manufacturing asset category, phase overlap and spending status; not an AI-data-center capital total
Source
abilene1,200 MWPlanned total campus capacity; not current IT loadAnnounced full buildoutAdjacent Microsoft campus excluded; exact electrical basis and current delivery unresolved
Source
abilene336 MWDesigned critical IT load per buildingDesign targetSeparate neighboring campus; not assigned to original tracked campus or operating totals
Source
nebius-modiin8 MWReported colocation site capacity; IT versus electrical basis unconfirmedIndependent report of site capacityNot all government computing allocation; expansion and other Israeli sites excluded
Source
qts-phoenix-3750 MWReported planned critical capacityHistorical company-plan attribution in DCDOriginal current primary capacity statement not established; current delivered load unknown
Source
nebius-lappeenranta70 MWSubstation capacity; not IT loadContractor-announced designInfrastructure component overlaps campus; not additive to 310 MW
Source
nebius-lappeenranta1.5e+07 EURSubstation design/construction agreementApproximately signed contract valueNot full-campus capex, spending or recognized supplier revenue
Source
google-visakhapatnam1.5e+10 USDCampus, energy and connectivity program commitmentCompany-announced investment commitmentMixed infrastructure components; not data-center-only expenditure
Source
google-visakhapatnam1,000 MWGovernment-described hyperscale data-center capacity; IT basis unconfirmedAnnounced planned capacityGovernment ceremony statement is not commissioning or metered IT load
Source
nebius-independence1,200 MWHistorical planned campus capacity cited by DCDHistorical issuer targetCurrent engineering/phase scope unresolved; not metered operating power
Source
bytedance-omnia-pecem2e+09 USD20-year energy supply agreement valueCompany statements reported by ReutersNot campus investment or financing close; exclude from capex totals
Source
voltalia-pecem322 MWTransmission-system-use agreement connection capacityIssuer reports signed CUST with ONSActual agreement not independently inspected; not energized IT load
Source
voltalia-pecem322.5 MWProjected data-center capacity reported by ReutersProjected capacityDifferent quantity from 322 MW connection; exact IT/electrical basis and locality unresolved
Source
voltalia-pecem1.817e+11 BRLProjected total investment attributed to government by ReutersProjected investmentDirect complete instrument, allocation and closed funding not verified
Source
hyperion5,000 MWMeta announced compute capacity; electrical/IT definition unresolvedPlannedNot delivered or metered power; no utilization inference
Source
hyperion5e+10 USDLower bound of announced regional investment, includes infrastructure and workforceMore than this amount announcedNot campus-only paid expenditure
Source
hyperion5,200 MWLower bound of planned gas generationMore than this amount plannedGeneration is not data-center IT load; approval/service status not established
Source
iren-childress50 MWIssuer-reported critical IT deployment delivered to MicrosoftDelivery reported August 2026Delivery is not independently metered utilization or current accepted service revenue
Source
iren-childress200 MWFour stated 50 MW critical IT deploymentsProgram total; later phases incomplete at disclosureIncludes first tranche; never add to Horizon 1; not 750 MW site envelope
Source
fairwater4.7e+09 USDEstimated Wisconsin hyperscale construction spending across 2024–2028Issuer forecastNot first-facility cost, GPU budget or spending already paid
Source
nscale-narvik230 MWAnnounced campus capacity; IT/electrical basis unresolvedPlannedNot operating load or proof of energized capacity
Source
nscale-narvik100 MWContractor-stated capacity across three CSA building packagesWorks underway; 2027 targetBuilding package is not metered IT load; overlaps campus plan
Source
nscale-narvik7.9e+08 USDIssuer-reported committed project financingCommitted, not evidenced as drawnExclude separate equally sized uncommitted accordion and corporate rounds
Source
nscale-narvik7.9e+08 USDUncommitted expansion financing optionUncommittedNot available cash or closed funding; do not combine with committed amount
Source
start-campus-sines200 MWAnnounced second-building capacity; IT basis unresolvedPlannedNot SIN01 delivered load or entire 1.2 GW campus
Source
start-campus-sines2.3e+08 EURAnnounced additional shared-infrastructure allocationAnnounced investmentNot verified expenditure or all computing hardware
Source
start-campus-sines4.65e+08 EURAnnounced second-building allocationAnnounced investmentSeparate allocation; not whole-campus capex or Microsoft spending
Source
start-campus-sines26 MWDCD-reported SIN01 capacity; metered IT definition unresolvedFirst building reported launched January 2025Operating milestone does not certify 26 MW utilization
Source
polaris-forge-1250 MWIssuer-reported operational critical ITReady for Service reportedNot independently metered utilization; includes latest 75 MW
Source
polaris-forge-1400 MWContracted full-buildout critical ITContracted future scopeOverlaps operational tranche; not all delivered
Source
polaris-forge-2200 MWDisclosed contracted critical IT programDevelopment scopeFinancing does not prove delivered service
Source
polaris-forge-22.15e+09 USDSenior secured notes face value; issued at 98% of parOffering reported completeNot net cash proceeds or capital already spent; fees and discount separate
Source
core-muskogee70 MWFiling-disclosed CoreWeave critical IT allocationContracted allocationNot a current delivery certificate; separate from acquired grid scope
Source
core-muskogee100 MWEstimated maximum demand under disclosed OG&E service agreementContract service scopeNot customer IT or metered use; utility consents require follow-up
Source
core-muskogee440 MWApproximate in-service gross grid capacity used by acquired Polaris DSIssuer-reported in-service grid capacityNot energized AI IT or proof of customer acceptance; overlap with original scope unresolved
Source
core-muskogee1,500 MWApproximate planned gross powerPlanned grid and behind-the-meter combinationNot delivered capacity; includes future development
Source
core-muskogee4.44e+08 USDApproximate cash acquisition purchase priceIssuer-reported completed acquisitionAcquisition consideration is not AI campus construction spending; no spending aggregate
Source
qts-fayetteville3e+09 USDEstimated build-out value in ATL2 East DRIApplicant/government-filed estimate, not capital commitmentFunding versus estimated value; scope overlap unresolved; not spent capital
Source
qts-fayetteville4.6e+09 USDSecured-notes offering disclosed by transaction counselFinancing transaction, not paid construction capexFunding versus estimated value; scope overlap unresolved; not spent capital
Source
core-denton262 MWCritical IT allocationApril contractual scopeDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
core-denton260 MWApproximate issuer-reported billing capacity, not metered IT drawDated issuer billing disclosureDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
core-denton394 MWPotential PPA electrical loadDated contractual potentialDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
core-denton297 MWExisting electrical load conditionally approved, issuer descriptionConditional ERCOT status reported by issuerDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
core-denton74 MWAdditional electrical load to be energizedValidated study case per issuer; not energizedDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
core-denton6.1e+09 USDCity forecast real-property investment by hosted tenant; broader scopeExpected investment, not verified spentDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr0372 MWOperator first-building IT specificationDated source-attributed scopeDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr0324 MWExecutive-reported inaugural moduleDated source-attributed scopeDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr03300 MWPlanned IT load at full build-outDated source-attributed scopeDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr03200 MWIssuer-reported substation/transmission infrastructure, not operating ITDated source-attributed scopeDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr03400 MWPlanned electrical infrastructure expansion, not operating ITDated source-attributed scopeDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr033.3e+09 USDIssuer investment headline; financing/spending basis unresolvedAnnounced estimateDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr033e+09 USDInvestment greater than USD 3 billion; lower bound, not exact spendingAnnounced lower boundDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
odata-qr036.3e+08 USDCombined QR03/SP04 first-phase program, not QR03-only capitalIssuer combined investment figure; allocation unknownDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
nebius-modiin16 MWReported planned colocation expansion; IT/electrical basis unconfirmedExpansion plan, not delivered loadDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
nebius-modiin5e+08 NISGovernment-announced national computing investment above NIS 500 millionProjected investment, not paid capexDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
nebius-modiin1.6e+08 NISGovernment support included in investment, not additive; disbursement unknownAnnounced supportDated issuer/government scope; current utilization, paid spending or overlap not certified
Source
google-pine-island1,400 MWAnnounced wind generation capacity added to Xcel grid; not campus loadCompany-announced commitmentNot campus IT capacity; not verified commissioned generation; avoid grid/campus and timing conflation
Source
google-pine-island200 MWAnnounced solar generation capacity added to Xcel grid; not campus loadCompany-announced commitmentNot campus IT capacity; not verified commissioned generation
Source
google-pine-island300 MWForm Energy iron-air grid storage power rating; Xcel also reports 30 GWh energy capacity and 100-hour design durationAnnounced storage project; not verified commissionedGrid storage is a separate asset class from campus load and generation; commissioning and discharge performance unverified
Source
google-pine-island5e+07 USDGoogle-announced contribution to Xcel Capacity*Connect distributed battery program; not campus capexAnnounced contribution; cash payment not verifiedNot project construction spending or campus investment; do not attribute to site capex or Xcel earnings
Source
microsoft-bergheim297.4 MWthPhase-one backup-generator combustion thermal input under applicationApplied-for authorization; final decision not establishedThermal fuel input is not electrical supply, IT load, or delivered computing.
Source
microsoft-bergheim3.2e+09 EUR2024 Germany-wide investment package; contextual parent-program valueAnnounced envelope; no Bergheim allocationMulti-site parent budget; not campus-specific capex, financing or spending. Exclude from project sums and prevent overlap.
Source
meta-prineville11 buildingsCity management-reported completed construction countReported completed in FY2024 reportBuilding completion is not individual server commissioning or IT capacity.
Source
meta-prineville1.37532e+06 MWhOperator-reported annual facility electricity consumptionReported consumptionEnergy is not IT nameplate MW, peak draw or utilization percentage.
Source
meta-prineville1.72829e+06 MWhOperator-reported annual facility electricity consumptionReported consumptionEnergy is not IT nameplate MW, peak draw or utilization percentage.
Source
meta-prineville196.754 MWFJI arithmetic derivation from annual facility energyDerived annual average, not current/peak or IT loadExcluded from operating-IT totals; includes facility overhead and period-specific scope.
Source
google-midlothian4.91727e+08 USDCurrent state registered estimated construction costFiled estimate, not spent or financedConflicts with earlier USD 880 million reporting; no revision date or cost savings inferred.
Source
google-midlothian288,000 sq ftRegistered construction floor areaRegistered design scopeNot delivered IT capacity or current occupied computing.
Source
google-midlothian3.5e+08 USDState registered estimated construction costFiled estimate; accessibility registration closedRegister closure does not certify actual spending or computing acceptance.
Source
google-midlothian1.12 PUEOperator reported quarterly facility/IT energy ratioReported quarterly ratioPUE is not utilization or nameplate capacity; cannot derive IT MW without compatible energy scope.
Source
google-midlothian1.11 PUEOperator reported trailing-twelve-month facility/IT energy ratioReported TTM ratioRatio-only evidence; no current IT capacity or utilization derived.
Source
airtrunk-jhb22.325e+09 USDIssuer-reported green financing secured, not expenditureattributed financing announcementNot operating capacity or paid spending; drawn/deployed unavailable
Source
qscale-q01114 MWOperator-listed protected customer IT-load capacity; not measured consumptionPublished maximum/specification; current energized, accepted and utilized load unknownOperator capacity specification cannot be treated as current delivered or utilized IT MW; 142 MW campus power capacity and 60 MW Building B expansion have separate scopes.
Source
iren-prince-george10 MWCompany-described IT load of one liquid-cooled installation; distinct from the 50 MW campus power figureUnder construction in August 2025; current commissioning status not established by the 2026 reviewHistorical construction evidence is not proof of present commissioning, customer acceptance, or measured IT draw.
Source
polaris-forge-1175 MWIssuer-reported operational critical ITReady for Service reportedCumulative same-campus observation; not independently metered utilization
Source
polaris-forge-2300 MWIssuer-reported two-building construction capacity; not operating loadUnder construction per October 7 filingOverlaps 200 MW contracted subset; no independently accepted operating load
Source
aws-richmond57 enginesAgency-issued temporary bridge-generation design authorization; not installed/operating count or IT MWAgency announced air permit issued August 28, 2026Authorization is not delivered power or computing capacity; backup/bridge equipment must not be combined into an IT total
Source
stargate-saline1,000 MWLower bound of sponsor-announced >1 GW campus capacity; IT versus utility basis not independently specifiedAnnounced planned capacity lower boundGreater-than quantity is a lower bound; basis and completed/operating status unresolved; not IT load or delivered phase capacity
Source
stargate-saline1,383 MWMaximum contracted utility load for Green Chile Ventures; not IT loadConditionally approved special-contract load; delivery not verifiedUtility maximum-load contract is not delivered or metered capacity and must not be combined with storage capacity
Source
stargate-saline332 MWNameplate energy-storage capacity in first approved tranche; not generation or data-center loadMPSC-approved contracts; construction/operation unverifiedStorage is a separate grid asset and not additive to data-center or delivered IT capacity
Source
stargate-saline1.6e+10 USDSponsor-announced project financing packageFinancing package closed April 30, 2026; draws and spending unverifiedClosing date is reported by two transaction-counsel firms; drawdowns, capital deployed and realized project spending are not disclosed in reviewed sources
Source
stargate-saline1,383 MWMaximum contracted utility load covered by emergency load-shedding rule; not site actual powerRegulatory emergency operating procedure approved Aug. 27, 2026Emergency load rule is not a delivery or consumption measurement; maximum contract load is not IT load
Source
abilene618 MWOracle management described 618 MW as 75% of stated total campus capacity represented by six of eight buildings delivered to customer; not independently measured IT loadCompany-reported delivered-to-customer milestone as of Q1 FY2027 earnings call (Sept. 10, 2026)Issuer-reported and not independently verified; electrical / IT basis and energized status not established; do not add to the 1.2 GW planned envelope
Source
meta-el-paso12.3 USD billionReuters reported banks managed project-linked bond sale, citing a term sheet; distinct from announced equity / asset contributions and total project development costReported debt sale (Aug. 10, 2026)Not sources-and-uses reconciliation or evidence of cash spent; do not add to project cost or announced capital contributions
Source
aws-huechuraba2.05e+08 USDEnvironmental project investment estimateEstimated; financing and spending unverifiedA project estimate is not verified funding close, expenditure or asset value.
Source
aws-huechuraba4e+09 USDMore than USD 4 billion Chile-wide program over fifteen yearsPlanned country program; no campus allocationOverlapping regional context; not Huechuraba capex or spending. Excluded from project sums.
Source
google-canelones8.5e+08 USDAnnounced investment exceeding USD 850 millionAnnounced project investment; spending unverifiedAnnounced investment is not financing closed, cash spent or site revenue.
Source
google-canelones560 GWh/yearFinal-stage modeled annual electricity use, below 560 GWh/yearPlanning estimate; not metered usageAnnual energy cannot be relabeled as IT MW or delivered electrical capacity.
Source
google-canelones420 GWh/yearInitial UTE annual-energy agreement as reported in the technical assessmentDocumented planning-file agreement scope; current delivery unverifiedAnnual allowance is not current load; not additive with final-stage annual demand.
Source
google-canelones48.1 m³/dayEstimated site water demand, principally personnelPlanning estimate; no metered actualWater-demand estimate is neither operating use nor computing capacity.
Source
bell-sherwood1.5e+08 CADIssuer-reported capital expenditures and associated cash outflows, approximately; not independently audited by this reviewReported to date in August5 MD&A; exact cutoff unspecifiedHistorical issuer-attributed scope; cutoff, phase overlap and current spend not certified
Source
bell-sherwood1.3e+09 CADExpected 2026 capital expenditureForecast as of August5,2026; not paid expenditurePlan, not actual
Source
bell-sherwood1.7e+09 CADExpected incremental development capital expenditureProject plan; no project-finance closing certifiedPlan, not closed/drawn/spent funding; overlaps annual plan
Source
bell-sherwood4e+08 CADApproximate setup fees/prepayments package, not total collected or recognized revenuePackage described August6; first Q2 receipt just below CAD100mReceipts are not capex or site revenue; full package not all received
Source
aws-warren3e+09 USDAnnounced minimum planned investment; not actual spendingAt least USD 3 billion planned; expenditure unverifiedPlanned amount, not financed/drawn/spent actual; no paid-spending aggregate.
Source
bell-tru-kamloops26 MWBell-disclosed planned capacity; electrical versus IT basis not resolvedPlanned; energization and customer acceptance unverifiedUnresolved power basis and future facility scope; not operating IT load.
Source
aws-mexico5e+09 USDMore-than lower bound; country/region investment plan over 15 yearsNot site spending or financed capitalIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
ascenty-qro125 MWOperator-listed total site power, not customer IT loadSpecification; delivered IT MW unverifiedIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
ascenty-qro121 MWHistorical total power at opening; not comparable to IT loadHistorical specification;25 MW reconciliation openIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
ascenty-qro11e+09 BRLIssuer-reported historical investment across two Mexican facilitiesNot QRO1 allocation or independently audited paid spendingIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
aws-new-carlisle1.1e+10 USDAnnounced development investment, not Rainier-only budget or spent actual2024 plan over following decade; no current paid actualIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
aws-madison2.1e+10 USDMadison County planned investment envelope; original10 billion+additional11 billionPlan across campuses; not spent actual or statewide25 billionIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
aws-northwest-louisiana1.8e+10 USDAnnounced three-campus regional investment planAug 18 revised plan supersedes12 billion envelope; not additive spendingIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
aws-falls2e+10 USDAt-least statewide investment lower bound; shared with Salem and potential other sitesNot Falls-only, financed or spent amount; overlap with SalemIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
aws-louisa-iad5501.1e+10 USDCounty-announced two-campus plan through 2040; no IAD550 allocationPlan only, not IAD550 paid expenditureIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
airtrunk-jhb2270 MW270+ lower-bound campus plan; IFC definition not commissioned IT drawGreenfield plan; not operatingMWIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
beale-project-blue3.6e+09 USDCounty up-to capital investment forecast; not funding close or spendingForecast only; county land proceeds are a separate transactionIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
beale-luckett-marana550 MWLower bound estimated electrical demand per parcel; not service commitment or IT loadTown planning estimate550–750 MW per parcelIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
beale-luckett-marana750 MWUpper bound estimated electrical demand per parcel; not IT loadTown planning estimate550–750 MW per parcelIncompatible scope or attributed plan/specification; excludes operating IT MW and paid-spending aggregates.
Source
buckeye1,800 MWdeveloper-listed potential site power; not energized ITattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sturgeon1,000 MWannounced campus envelope; IT/site basis not definedattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sturgeon1.3e+10 CADmore-than lower bound announced expected investment at full build-out; not spending incurredattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sturgeon250 MWcontracted capacity and energy; supply agreement >10 yearsattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
stak1,000 MWapproximately planned onsite gas generation; not IT loadattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
stak5e+08 USDsite evaluation/preparation/engineering, gravel roads/pad and initial camp/support; not all-in generation/GPU budgetattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-dalles7e+09 USDmore-than cumulative Oregon investment; excludes campus-only interpretationattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
switch-citadel130 MWup-to historical building power design ceiling; not actual IT loadattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
switch-citadel650 MWup-to historical campus power design; overlaps building and later expansionattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-eagle-mountain3e+09 USDmore-than cumulative Utah investment after expansion; not expansion-only budgetattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sv111.42e+08 USDannounced initial-phase development capex; not paid-cost verification or lifetime full-building costattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
empire4e+07 USDBeta supercomputer phase amount; not entire consortium budget or NVIDIA order valueattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
hoffman1e+10 USDapproximate local investment once operational; not funded Compass capexattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
hoffman200 MWoperator-listed campus envelope; power basis not explicitly ITattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sna24 MWadded critical IT capacity, issuer reports expansion completed; overlaps8MW totalattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sna28 MWtotal critical IT capacity after expansion; not current utilizationattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
va296 MWfuture-tense campus critical IT design capacity; not commissioned loadattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
edged72 MWplanned critical capacity, fully preleased per issuer; not operationalattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
ca364 MWmore-than contractor-reported critical IT capacity; design/offered capacity, not utilizationattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
compassva79 MWoperator-listed campus scale; IT versus gross power basis unlabelledattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
cyrusaurora40 MWinitial IT capacity announced; not current deliveryattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
etobicoke30 MWplanned first-building critical IT designattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
etobicoke10 MWplanned initial critical IT tranche; subset of30MWattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
lga320 MWoperator-listed critical IT capacity; not utilized demandattributed source claim; not independently meteredAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
ric52e+08 USDSponsor assertion that total capital investment will well exceed FAST41 $200m minimum; threshold, not exact budget, funding or spendissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
rosemount8e+08 USDannounced investment lower bound; not final/spentissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
redoak2.65e+09 USDclosed construction financing commitments, not drawn debt/spendingissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
redoak60 MWincremental IT capacity plannedissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
allen77 MWoperator-listed IT capacity, not measured utilizationissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sdcseattle12 MWpreleasing expansion planned power; not metered IT consumptionissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sdcseattle3.5 MWthen-marketed availability; not total campus capacityissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sea23 MWoperator-listed critical IT specification, not metered useissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
bos10.5 MWoperator-listed critical IT specification, not metered useissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
odata-qr0132 MWfull-build announced campus capacity; precise utility/IT basis not defined in releaseissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
odata-qr0230 MWfull-build announced campus capacity; precise utility/IT basis not defined in releaseissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-qc232 MWannounced incremental IT capacityissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-qc286 MWannounced full-campus IT capacity including QC24issuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-qc25e+08 CADannounced development investment, not audited spendingissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-qc450 MWcurrent operator-marketed full-development critical IT capacity; unresolved 48MW older figureissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-dekalb1e+09 USDannounced lower-bound investment at full operation, not audited spentissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-dekalb300 MWcontracted added renewable generation in Illinois; excluded from campus ITissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-frontier2.5e+10 USDannounced lower-bound investment; not financing or spendingissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-frontier1,400 MWPlanned full-campus GPU-compute capacity as described by issuer; precise IT-versus-facility electrical boundary not independently established; not metered consumptionissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-lighthouse902 MWplanned full-campus critical IT load, not transmission-system size/current consumptionissuer-announcedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
project-jupiter2.45 GWPlanned maximum fuel-cell generation nameplate; not IT loadattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-kansas-city1e+09 USDGreater-than campus investment disclosure; not annual spendingattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-qc111 MWOperator marketed critical IT capacity; not metered loadattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-cheyenne8e+08 USDAttributed campus investment greater than threshold; not audited cash spendingattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-kuna1.2e+09 USDAttributed campus investment greater than threshold; not audited cash spendingattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-aiken8e+08 USDAttributed campus investment greater than threshold; not audited cash spendingattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-mesa1e+09 USDAttributed campus investment greater than threshold; not audited cash spendingattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-los-lunas2e+09 USDAttributed campus investment nearly; historical2021 buildoutattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
coreweave-lancaster6e+09 USDUp-to intended equipment investment; not spent or construction budgetattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
coreweave-lancaster100 MWInitial announced data-center capacity; IT vs facility undefinedattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
tusass-nuuk1.55e+08 DKKAnnounced construction budget building plus technical installations; not actual spendattributed-source-checkedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-lenoir6e+08 USDhistorical government-reported original investment; not independently audited paid capitalsource-checked government-reported amountAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-lenoir6e+08 USDannounced additional expansion commitment; not paid spendsource-checked government-reported amountAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-clarksville6e+08 USDannounced original project investment, government disclosuresource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-douglas3e+08 USDannounced expansion commitment, not paid spendsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-montgomery1.5e+09 USDmore-than lower bound announced enlarged campus investmentsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-forest-city4.5e+08 USDapproximately proposed initial investment, not actual disbursementsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-lebanon1e+10 USDmore-than lower bound expected investment once completesource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-lebanon1,000 MWdesign capacity; IT versus facility boundary unresolvedsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-bowling-green8e+08 USDmore-than lower bound expected investment once completesource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-gallatin1.5e+09 USDissuer-described campus investment, not audited spendingsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-temple1.2e+09 USDmore-than lower bound issuer investment claim at traffic launchsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-jeffersonville8e+08 USDmore-than lower bound prospective investment upon completionsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-jackson1.5e+09 USDannounced incremental expansion commitmentsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-az1176 MWcritical IT full-development envelope, not delivered MWsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-wa189 MWcampus IT specification following claimed final building delivery, not metered loadsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-wa164 MWWA13 stated IT capacity, subset of 89MW campussource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
vantage-wa11e+09 USDmore-than issuer cumulative campus investment claim since entering marketsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
equinix-dc219.5e+07 USDreported first-phase project cost; not whole-campus current paid capitalsource-checked attributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
equinix-da111.8e+08 USDregistered estimated construction cost, not spentattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sabey-quincy85 MWover85MW planned additional critical-power envelope; issuer future-tense will add, not verified delivered expansionattributed planned scope; delivery conflictedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
mistral-bruyeres7.2e+08 USDapproximately debt tranche made available, not construction capex; financing made available, drawdown not establishedattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
mistral-bruyeres9.4e+07 EURapproximately separate debt tranche; do not FX-combine; financing made available, drawdown not establishedattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
data4-escaudain5e+09 EURannounced investment plan, not spentattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
data4-escaudain700 MWultimate planned capacity/electrical service; not ITattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
qts-calatorao1.3471e+10 EURup-to investment estimate in PIGA release, not committed financingattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
compass-meridian1e+10 USDfull-fit-out projection including tenant IT equipmentattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
compass-meridian500 MWnearly 500 MW signed long-term utility agreement; approximate, not delivered ITattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
kao-harlow17.6 MWplanned facility capacity; exact IT/service demarcation unresolvedattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
kao-harlow22 MWcontracted campus capacity, not measured current loadattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
virtus-marienpark62.6 MWcurrent operator planned IT capacity, scope conflictattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
virtus-marienpark57.6 MWdated planned IT capacity; conflicts with current pageattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
data4-hanau2e+09 EURover EUR2bn announced campus investment lower boundattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
data4-hanau180 MWplanned campus power capacity; not verified delivered ITattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-beaver-dam1e+09 USDannounced investment on completion, not spentattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-dorchester2e+09 USDannounced investment for two Dorchester campuses, not statewide/spentattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
google-fort-wayne2e+09 USDannounced investment plan, not audited expenditureattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
meta-davenport8e+08 USDplanned investment underpinning incentive actionattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
goodman-tsukuba50 MWleased capacity, not metered operating loadattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
goodman-project-pluto126 MWapproved project load capacity, not IT or delivered powerattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
goodman-project-pluto68 MWproposed final power consumption, not established IT; differs from portal 126 MW load descriptionattributed proposalAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
edged-project-atlas725 MWrevised proposed campus capacity; IT/grid demarcation unresolvedattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
stonebridge-fort-meade1.2e+09 USDapplicant planned real property improvementsattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
stonebridge-fort-meade1.64e+09 USDapplicant planned tangible equipment; separate from improvementsattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
hostdime-supernova1e+08 USDindependently reported project cost estimate, not audited spendattributed announcementAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
uf-hipergator3.3e+07 USDIssuer-described system purchase; not reconciled funding or audited cash spendissuer-reported purchaseAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
global-ai-weld1.56e+07 USDReported property consideration, not retrofit capexsecondary-reported historical acquisitionAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
raeden-project-taurus50 MWConditional city utility-usage ceiling, not accepted IT loadconditional capAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
gemini-sioux-falls500 MWDeveloper-described potential site support requiring upgrades and future utility agreementattributed planning potentialAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
intel-santa-clara79 MVAPlanned total apparent-power allocation; existing 62 MVA plus 17 MVA; not MW ITauthorized conditional future allocationAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
flexential-parker22.5 MWPlanned site capacity/utility supply, not energized or occupied IT loadplannedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
coresite-de3-denver18 MWPlanned compute/critical power at full DE3 build; not 60 MW wider-campus scopeplannedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
qts-aurora-denver160 MWCurrent advertised minimum planned critical-power capacity, value represents 160+ lower bound; not generator outputplanned lower boundAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
databank-centennial16 MWOperator-listed critical IT design capacity, not measured/leased loadmarketed capacityAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
cleanarc-va1-caroline900 MWAnnounced ultimate grid envelope, not delivered IT load or simultaneous initial phaseplanned grid capacityAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
blockfusion-niagara35 MWExecuted first-tranche contractual critical IT load, 25+10 MW phases; delivery not verifiedcontracted prospectiveAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
stream-stamp-double-reed500 MWProposed campus design envelope; distinct from 600 MW STAMP-wide planning allocationproposedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
nccs-nydig-massena635 MWProposed expansion envelope, not delivered AI load or verified utility acceptanceproposedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
h5-lockport-yahoo44 MVAOperator brochure states two on-site substations totaling UP TO 44 MVA; upper-bound apparent-power rating, not measured MW/IT loadadvertised rated infrastructure upper boundAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
dsu-sioux-falls-arl6.25e+07 USDReported estimated lab construction/project cost, not audited spend; separate workforce appropriation excludedestimated project costAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
reliance-meta-jamnagar168 MWAnnounced agreed first-phase leased capacity, technical IT/facility boundary not independently certifiedagreed prospectiveAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
sk-aws-ulsan41 MWGovernment-described first partial operational phase target, not operating loadplannedAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
scala-ai-city-eldorado-do-sul54 MWInitial announced IT design plan; distinct from 120 MW future grid demandplanned IT capacityAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
hyperdc-mbl1-moorabool400 MWDeveloper-attributed conceptual IT capacity quoted in independent reporting; not grid contractproposed IT capacityAttributed source quantity with the recorded scope. Excluded from certified operating-IT-load and actual-spending aggregates.
Source
microsoft-espoo3.09e+07 EURMunicipality-reported land-sale value; not total campus capexAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
microsoft-vihti1.23e+07 EURMunicipality-reported two-plot land-deal value; not paid campus construction costAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
google-hamina1.3e+10 EURFinland multi-location digital infrastructure/clean-energy commitment, not Hamina allocationAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
google-skien6e+08 EURAnnounced data-centre and related infrastructure investment; not spent capitalAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
google-skien240 MWFirst-phase power allocation; IT-versus-facility boundary not certified; not metered loadAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
google-winschoten6e+08 EURAnnounced site investment; not verified cash deployedAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
meta-talavera7.5e+08 EURHistorical planning project estimate reported by DCD; not financing or spendAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
qts-cambois1e+10 GBPProjected inward investment; not paid costs or financing closedAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
qts-cambois720 MWMarketed campus capacity; electrical boundary unresolved; not commissioned IT loadAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
qts-cambois1,100 MWCouncillor-attributed full-project power figure in fDi; not comparable with marketed 720 MWAttributed source quantity; not delivery or paid-spending certificationScope retained; excluded from comparable operating-IT-load and paid-spending aggregates.
Source
coresite-de3-denver743,000 USDIssuer-attributed historical soil-cleanup component, not campus budget, financing or independently verified paid capexissuer-reported historical componentAttributed historical component; exact spending date and payment evidence unavailable. Not campus budget or aggregate paid capex.
Source
polaris-forge-21.1e+08 USDEstimated associated utility-project cost, not paid capital or campus budgetEstimated in final orderRetain March19$75m estimate as historical observation; do not label campus overrun or spending.
Source
polaris-forge-2280 MWUtility expected peak usage; undated, not reconciled to issuer IT/construction scopesExpected, not accepted/operatingNot additive/comparable with300MWconstruction or200MWcontracted; no PUE conversion.
Source
deepgreen-western-passage4.8 MWCalculated proposed generation nameplate: up to 16 units × 300 kW ÷ 1000Proposed; not installed or commissionedGenerator rating is not IT load, continuous output or delivered supply. Exclude all proposed and earlier differently scoped figures from operating-MW totals.
Source
verne-keflavik-vdc04120 MWPlanned electricity demand for hosting computer systems, excluding ancillary infrastructure loadsPlanned application scope; not operating capacityPlanned demand is not delivered supply or metered operating IT load. Exclude from operating-MW totals.
Source
beyond-pl-poznan-ai-factory7.57 PFlop/sLinpack RmaxPublished benchmarkretain-in-own-unit
Source
beyond-pl-poznan-ai-factory9.36 PFlop/sTheoretical RpeakPublished benchmarkretain-in-own-unit
Source
beyond-pl-poznan-ai-factory100 MWCommitted campus powerRetained scoped claim; excluded from operating/project-spend totalsexclude-from-operating-IT-and-FIN-totals
Source
beyond-pl-poznan-ai-factory150 MWCampus targetRetained scoped claim; excluded from operating/project-spend totalsexclude-from-operating-IT-and-FIN-totals
Source
beyond-pl-poznan-ai-factory1e+08 PLNFirst-phase investment estimate; >Retained scoped claim; excluded from operating/project-spend totalsHistorical interview-based first-phase estimate above PLN 100 million; not final audited or paid expenditure.
Source
beyond-pl-poznan-ai-factory250 GPUsPlanned GPU quantity; approximately, fewer thanRetained scoped claim; excluded from operating/project-spend totalsMay2025 reported plan of fewer than/about250 GPUs; not a verified installed inventory.
Source
related-digital-cheyenne88 MWPlanned critical IT capacityPlanned / announced; actual delivery or payment unverifiedPhase and campus overlap; no operating capacity or actual spending demonstrated. Separate 420 MW basis unresolved.
Source
related-digital-cheyenne302 MWUpper-bound planned IT loadPlanned / announced; actual delivery or payment unverifiedPhase and campus overlap; no operating capacity or actual spending demonstrated. Separate 420 MW basis unresolved.
Source
related-digital-cheyenne1.2e+09 USDAnnounced investment; not paid capitalPlanned / announced; actual delivery or payment unverifiedPhase and campus overlap; no operating capacity or actual spending demonstrated. Separate 420 MW basis unresolved.
Source
visionbay-xiaogang27 MWApplicant-stated phase-one power use / requirement; not established IT load or metered demandApplicant statement recorded at July 17 hearingNo direct Taipower instrument or energization/IT-load evidence; cannot enter operating-MW total
Source
visionbay-xiaogang1.228e+09 TWDConstruction-cost estimate reported from building-permit informationIndependent reported estimateNo direct permit obtained; narrower than total AI investment; not financed or paid capital
Source
yyz106.765 MWBBG appraisal stated critical IT capacity; not measured consumptionDated appraisal observationHistorical appraisal scope; no current meter/AI load certification, project source qualification held
Source
prometheus-evanston1,250 MWDeveloper-stated planned capacity; IT-versus-facility-power basis not disclosed in reviewed source. Not delivered, energized, commissioned or measured.Developer-announced planned campus capacityIT-versus-facility-power basis unresolved; not verified delivered or operating load
Source

0 projects remain pending a first scoped pass. All reviewed projects retain the field-specific gaps above. No operating-MW or actual-spending aggregate has been certified.

Research change history

Project Change Scanner

12362 field-level research changes across 69 snapshots. Zero confirmed business-change events. These initial observations primarily reflect source mapping, scope checks and pipeline enrichment. They do not establish a market trend.

Each entry retains previous/current values, observation time, source references and verification scope. Historical snapshots are ordered by recorded timestamps, never filesystem modification time.

Loading change index…

Observation → interpretation → investor implications

The dated Lappeenranta sources describe construction and future customer availability separately.

Interpretation: Construction evidence alone does not establish operating IT load, customer acceptance or utilized capacity.

Investor implications: Assess documented company exposure only after delivery and commercial terms; no site revenue estimate is supported.

Confirm: Phase-specific commissioning and customer service-acceptance records. Invalidate: Evidence that a supposed construction-only record already establishes accepted customer compute for that same phase.

Case-study screening assessment
  • evidence: 4/5 — Company, municipality and independent construction reporting checked for this limited claim.
  • magnitude: Unrated/5 — Economic magnitude not quantified.
  • persistence: 1/5 — One project case; no longitudinal portfolio trend demonstrated.
  • investmentRelevance: 3/5 — Delivery timing matters, but contract economics and site earnings remain unknown.
  • novelty: 1/5 — Useful scope clarification; not a demonstrated novel market discovery.

No total assigned because economic magnitude is unrated. This remains a case study, not an emerging portfolio signal.

FJ Signal Score · Internal screening prototype

Rate a hypothetical finding. The score is editorial judgment, not statistically validated confidence. It does not authorize publication.

No total — all dimensions must be assessed.

0 means unrated. Each assessment needs written justification, accessible evidence, a comparable cohort, uncertainty and confirmation/invalidation tests. Change records and rubric.